Memo S. Wastler, Technical Assistance Request - Review of Proposed Amendment to the Lacrosse Boiling Water Reactor Physical Security Plan (TAC L24560, Dockets 72-46, 50-409)
ML112241880
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 08/11/2011
From: Eric Benner
NRC/NMSS/SFST
To: Wastler S
Division of Security Policy
Wharton L, NMSS/SFST, 301-492-3316
References
TAC L24560
Download: ML112241880 (3)


Text

August 11, 2011 MEMORANDUM TO: Sandra Wastler, Chief Materials, Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM:

Eric J. Benner, Chief

/RA/

Rules, Inspection and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards

SUBJECT:

TECHNICAL ASSISTANCE REQUEST - REVIEW OF PROPOSED AMENDMENT TO THE LA CROSSE BOILING WATER REACTOR PHYSICAL SECURITY PLAN (TAC NO. L24560)

The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project:

PROJECT: Review Dairyland Power Cooperatives (DPC) response to Order (EA-09-118) and the La Crosse Boiling Water Reactor Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan and verify implementation of the additional security measures.

DOCKET NOS: 50-409, 72-46 TAC NO: L24560 REQUESTED ACTION: NMSS/SFST requests that NSIR/DSP review DPCs response to the ISFSI Security Order and the La Crosse Boiling Water Reactor ISFSI Physical Security Plan.

Prepare a memorandum documenting the results of NSIRs review.

Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.

Name of NSIR/DSP assigned Reviewer: _________________________________

NSIR/DSP Project Completion Date: _________________________________

NSIR/DSP Branch Chief Signature: _________________________________

Contact:

Raynard Wharton (301) 492-3316 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.

Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.

Name of NSIR/DSP assigned Reviewer: _________________________________

NSIR/DSP Project Completion Date: _________________________________

NSIR/DSP Branch Chief Signature: _________________________________

Contact:

Raynard Wharton (301) 492-3316 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.

Distribution: (w/o attachment)

SFST r/f BWhite ADAMS: ML112241880 G:\\SFST\\Security - ICMS & Orders\\TARs\\Waterford TAR.doc OFC SFST SFST SFST NAME RWharton WWheatley EBenner DATE 08/ 11 /11 08/ 11 /11 08/ 11 /11 OFFICIAL RECORD COPY