ML112212225

From kanterella
Jump to navigation Jump to search
Forwards NRC Requalification Exam Simulator Evaluation Scenario Guides 2a,17 & 20,per 900713 CAL
ML112212225
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 10/24/1990
From: Mineck D
IES Utilities, (Formerly Iowa Electric Light & Power Co)
To: Davis A
NRC/OI/RGN-III/FO
Shared Package
ML112212226 List:
References
CAL, NG-90-2548, NUDOCS 9011050025
Download: ML112212225 (3)


Text

ACCELERATED DISTRIBUTIIUN LVMUINS IKA11 UIN X 4iiv REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9011050025 DOC.DATE: 90/10/24 NOTARIZED: NO DOCKET #

FACIL:50-331 Duane Arnold Energy Center, Iowa Electric Light & Pow 05000331 AUTH.NAME AUTHOR AFFILIATION MINECK,D.L. Iowa Electric Light & Power Co.

RECIP.NAME RECIPIENT AFFILIATION DAVIS,A.B. Region 3 (Post 820201) R

SUBJECT:

Forwards NRC requalification exam simulator evaluation I Scenario Guides 2a,17 & 20,per 900713 CAL.

S DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR I TITLE: Operator Licensing Examination Reports ENCL SIZE: 491 S

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A PD3-3 PD 1 1 HALL,J.R. 1 1 INTERNAL: ACRS 2 2 AEOD/DSP/TPAB 1 1 NRR SHANKMAN,S 1 1 NRR/DLPQ/LHFB11 1 1 NRR/DLPQ/LOLB10 1 1 RE=lEEE 2 1 1 RGN3 FILE 01 1 S EXTERNAL: NRC PDR 1 NSIC 1 NP R

I D

S A

L E

NOTE TO ALL "RIDS" RECIPIENTS:

S PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT. 20079) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 12

Iowa Electric Light and Power Company October 24, 1990 NG-90-2548 Mr. A. Bert Davis Regional Administrator Region III, U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Duane Arnold Energy Center Docket No: 50-331 Op. License No: DPR-49 Licensed Operator Requalification Documentation of Remedial and Enhanced Training

References:

1) Confirmatory Action Letter, A.B. Davis to L. Liu, 7/13/90
2) Letter NG-90-1791, D. Mineck to A.B. Davis, 7/20/90 File: A117a; A204h; A204t

Dear Mr. Davis:

Please find enclosed copies of the examint.ons and evaluations in accordance with Item G. of the subject Confirmatomy Aitin Letter (CAL). The enclosed documentation is for one staff crew which ea .ived the accelerated remedial/

enhanced training required by Item C. the CAL. Attachment 5 contains personnel performance information, th. disclosure of which might constitute an unwarranted invasion of personal privacy. We request that Attachment 5 be exempt from disclosure per 10 CFR 2.790(a)(6).

On October 8, 1990, we began providing enhanced training and evaluation to licensed staff personnel. The training consists of 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> of training for each crew, concluding with evaluated simulator scenarios. Copies of the Scenarios, the Instructor Guides, and Student Guides used during the first segment of enhanced training were enclosed with Reference 2. Three additional Scenarios used during staff training are attached. In addition to this formal training, operating crews are observing the Simulator training sessions.

Very truly yours, Daniel L. Mineck Manager, Nuclear Division ma10:

/1Src2 Attachments: 1. Licensed Operator Schedule

2. ESG 2a
3. ESG 17
4. ESG 20
5. LOR Remedial Training evaluations for 10/8/90 - 10/12/90 (contains .10 CFR 2.790 information) cc: U.S. NRC Document Control Desk (Original; L. Liu w/o J.R. Hall (NRC--NRR) w/o L. Root w/o NRC Resident Inspector - DAEC w/o R. McGaughy w/o DLM/SLS/db General Office
  • P.O. Box 351 Cedar Rapids, Iowa 52406 319/398-4411 XV 0

Attachment 1 NG-90-2548 LICENCED OPERATOR REQUAL, 500-008 Week: 10/8/90 Hour Monday Tuesday Wednesday Thursday Friday 7:00 Intro Classroom: Simulator Simulator Simulator EOP 2, ED, ALC, warmup RPV/F 8:30 Simulator Simulator 9:00 Eval Scenarios 11:0 Classroom: misc 11:30 Lunch Lunch Lunch Lunch Lunch 12:00 Classroom: Classroom: Simulator Simulator Eval Scenarios EOP 1, ATUS EOP EOP 3, misc. (as needed) 1:00 Simulator Simulator 4:00