MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 August 19, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen. VA 23060-6711 SUB..IECT: NORTH ANNA POWER STATION. UNIT NOS. 1 AND 2. CORRECTION LETTER REGARDING AMENDMENT NOS. 262 AND 243 TO ADOPT TECHNICAL SPECIFICATION TASK FORCE (TSTF)-425, REVISION 3. FOR THE RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE CONTROLLED PROGRAM
Dear Mr. Heacock:
On January 31.2011. the U.S. Nuclear Regulatory Commission (NRC. the Commission) issued Amendment Nos. 262 and 243 to Renewed Facility Operating License Nos. NPF-4 and NPF-7 for the North Anna Power Station. Unit Nos. 1 and 2. The amendments revised the Technical Specifications (TSs) by relocating specific surveillance frequencies (SFs) to a surveillance frequency control program (SFCP). consistent with NRC-approved Industry Technical Specification Task Force (TSTF) Standard Technical Specifications change TSTF-425.
Revision 3.
In a discussion with our staff on July 21. 2011, a representative of your staff identified a mistake in your license amendment request (LAR) submitted by letters dated March 30. and August 30.
2010, and January 18. 2011. The mistake was that when changing the SFs on page 3.4.12-3 of the TSs in accordance with TSTF-425. the Completion Time (CT) for TS 3.4.12, Condition G. at the top of the page, was also modified such that it would be governed by the SFCP. The NRC staff clearly considers this to be an error to be corrected. The NRC staff considers that the use of a letter for this type of change is allowed by the NRC's "Proposed Guidance for Correction of Technical Specification Typographical Errors," SECY-96-238. dated November 19,1996 (the guidance in SECY-96-238 was approved in a Staff Requirements Memorandum dated December 17. 1996).
The surveillance requirements (SRs) and the limiting conditions for operation (LCO). with the attendant Conditions for the LCOs, are recognized as separate and discrete parts of the TSs in Title 10 of the Code of Federal Regulations. Part 50. Section 50.36. "Technical specifications."
The NRC staff confirms that nothing within the scope of TSTF-425 is intended to address any changes in TS Completion Times.
The guidance in SECY 96-238 allows for use of an administrative letter to correct an error provided that 1) the error was introduced inadvertently in a particular license amendment; and 2) the erroneous change was not addressed in the notice to the public nor reviewed by the NRC staff.
Dominion staff has identified orally and the NRC staff also independently determines that the error occurred in the LAR and in License Amendment Nos. 262 and 243. This satisfied the first
D. Heacock -2 requirement. Changes to TS Completion Times were not included within the scope of TSTF-425 documentation, were not identified in the notice on the amendment published in the Federal Register (75 FR 27833) and was not the subject of any specific part of the staff's safety evaluation that was issued with the license amendment. This satisfied the second requirement.
The CT to take the required action for TS 3.4.12, Condition G, with two required power operated relief valves inoperable was previously identified in the TS as being 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. In consideration of the erroneous markup of this CT, the CT of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> continued in effect with the issuance of Amendment Nos. 262 and 243 and is currently applicable.
The NRC staff has reviewed the licensee's request to correct the error on TS page 3.4.12-3 in accordance with the guidance in SECY 96-238. Based on our review, as set forth above, we have determined that the use of a letter to correct the typographical error is acceptable. Enclosed is the corrected TS page 3.4.12-3.
Sincerely, 2~ftl~
/Robert E. Martin, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339
Enclosure:
Corrected TS 3.4.12 cc w/encl: Distribution via Listserv
LTOP System 3.4.12 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME G. Two required PORVs G.l Depressurize RCS and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inoperable. establish RCS vent of
~ 2.07 square inches.
OR Required Action and associated Completion Time of Condition A, B, D, E, or F not met.
OR LTOP System i noperab 1e for any reason other than Condition A, B.
C. D. E, or F.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.12.1 Verify a maximum of one LHSI pump is In accordance wi th capable of injecting into the RCS. the Surveillance Frequency Control Program SR 3.4.12.2 Verify a maximum of one charging pump is In accordance with capable of injecting into the ReS. the Surveillance Frequency Control Program SR 3.4.12.3 -------------------NOTE-----------------
Only required to be met if accumulator pressure is greater than PORV lift setting.
Verify each accumulator is isolated and power is removed from the accumulator In accordance with isolation valve operator. the Surveillance Frequency Control Program North Anna Units 1 and 2 3.4.12-3 Amendments 262/243 Corrected by letter dated August 19, 2011
ML11213A001 L2-1/LA DRAlAPLAlBC DIRS/ITSB/BC OGC DHarrison* RElliott DRoth
!w/comment 08/08/11 08/17111 08/18/11 07/28/11