Withdrawal of Relief Request RR-04-07, Examination Criteria for Weld Overlays
ML112092556
Person / Time
Site: Millstone 
Issue date: 07/28/2011
From: Price J
Dominion, Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
11-407
Download: ML112092556 (2)


Text

Dominion Nuclear Connecticut, Inc.

5000 Dominion Boulevard, Glen Allen, Virginia 23060 Web Address: www.dom.com July 28, 2011 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No.

NSSLlMLC Docket No.

License No.11-407 RO 50-336 DPR-65 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2 WITHDRAWAL OF RELIEF REQUEST RR-04-07, EXAMINATION CRITERIA FOR WELD OVERLAYS In a letter dated July 29, 2010 (Reference 1), and supplemented by a letter dated March 1, 2011 (Reference 2), Dominion Nuclear Connecticut, Inc. (DNC) requested approval of Relief Request RR-04-07 for the use of the examination criteria in American Society of Mechanical Engineers (ASME) Code Case N-770-1.

The duration of the proposed request was for the current Millstone Power Station Unit 2 (MPS2) fourth 10-year inservice inspection interval, which began on April 1, 2010 and ends on March 31, 2020.

On July 21, 2011, the NRC amended its regulations to incorporate by reference ASME Code Case N-770-1.

Because this code case is now mandated by the NRC, Relief Request RR-04-07 is no longer needed.

Hence, DNC hereby withdraws its request for NRC approval of Relief Request RR-04-07.

If you have any questions regarding this submittal, please contact Mr. William D.

Bartron at (860) 444-4301.

Sincerely, rice sident - Nuclear Engineering Attachments: None Commitments made in this letter: None

Serial No.11-407 Docket No. 50-336 Withdrawal of Relief Request RR-04-07 Page 2 of 2

References:

1. DNC Letter 10-323, "Millstone Power Station Unit 2, Fourth 10-Year Interval Inservice Inspection Program and Associated Proposed Alternatives and Relief Requests," dated July 29,2010. (ADAMS Ascension No. ML102580204) 2.

DNC Letter 11-097, "Millstone Power Station Unit 2, Relief Request RR-04-07:

Response to Request for Additional Information Regarding Proposed Alternative for Examination Criteria of Weld Overlays," dated March 1, 2011.

(ADAMS Ascension No. ML110610207) cc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 C. J. Sanders, Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 0883 Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station