ME6712 Ke NFPA 805 Discretion Response Ltr 2011-07-20
ML112020332
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/29/2011
From: Giitter J
Division of Operating Reactor Licensing
To: Heacock D
Dominion Energy Kewaunee
Feintuch K
References
TAC ME6712
Download: ML112020332 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 July 29, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center SOOO Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR S0.48(c), NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 80S, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION - KEWAUNEE POWER STATION (TAC NO. ME6712)

Dear Mr. Heacock:

By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated July 1S, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No.

Ml111990111), the Dominion Energy Kewaunee, Inc.: (1) committed to submit a license amendment request (LAR) by September 29, 2011, to transition to National Fire Protection Association Standard NFPA 80S in accordance with Title 10 of the Code of Federal Regulations, Section S0.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date.

The NRC staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10,2011 (ADAMS Ml111610616). Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777).

If you are unable to meet the above lAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Karl Feintuch on 301-41S-3079 if you have any questions.

Sincerely,

.~ Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. SO-30S cc: Distribution via Listserv

July 29, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR 50.48(c), NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION - KEWAUNEE POWER STATION (TAC NO. ME6712)

Dear Mr. Heacock:

By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated July 15, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111990111). the Dominion Energy Kewaunee, Inc.: (1) committed to submit a license amendment request (LAR) by September 29.2011, to transition to National Fire Protection Association Standard NFPA 805 in accordance with Title 10 of the Code of Federal Regulations, Section 50.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date.

The NRC staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10, 2011 (ADAMS ML111610616). Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777).

If you are unable to meet the above LAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Karl Feintuch on 301-415-3079 if you have any questions.

Sincerely, IRAJ Louise Lund for Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsOeMailCenter Resource RidsNrrPM Resource Lp13-1 Reading File RidsOgcRp Resource RidsNrrLA Resource RidsAcrsAcnw_MailCTR Resource RidsRgnXMailCenter Resource RidsNrrDorlLpl3-1 Resource RidsNrrDorl Resource PLain, NRRfDRAlAFPB GGulla,OE RidsNrrDra Resource HBarrett, NRRfDRAlAFPB RRohrer, NRRfDORL RidsNrrDraAfpb Resource JDozier, NRRfDRAlAPLA RidsNrrDraApla Resource DPickett, NRRfDORL ADAMS Accession No. ML112020332 NRR-106 OFFICE LPL3-1/PM LPL3-1/LA DRAlAFPB/BC DRAlAPLAlBC LPL3-1/BC (A) DORUD NAME KFeintuch Tulley/Rohrer AKlein DHarrison TBeitz JGiitter /LLund for DATE 07/21/11 07/21/11 07/25/11 07/26/11 07/29/11 07/29/11 OFFICIAL RECORD COpy