Email from A. Imboden, NRR, Subject: Conference Call with PSEG Nuclear on Oct. 29, 2009
ML11201A127
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 10/29/2009
From: Andy Imboden
Division of License Renewal
To: Ranek N
Exelon Nuclear
References
FOIA/PA-2011-0113
Download: ML11201A127 (28)


Text

King, Ikeda From:

Imboden, Andy Sent:

Thursday, October 29, 2009 8:57 AM To:

nancy. ranek@exeloncorp.com

Subject:

FW: Conference Call with PSEG Nuclear on Oct. 29, 2009 Attachments:

Eccleston Conf Call_29oct2009.pdf; NRC Presentation 031609.pdf Hi Nancy-Please update your email address for me. Andy.lmboden(cnrc.qov; the distinction is "Andy" as opposed to "Andrew."

Talk with you soon!

Andy Imboden Chief, Environmental Review Branch NRR/DLR 301-415-2327 From: Eccleston, Charles Sent: Thursday, October 29, 2009 8:55 AM To: Imboden, Andy

Subject:

FW: Conference Call with PSEG Nuclear on Oct. 29, 2009 From: Nancy.Ranekiexeloncorp.com [mailto: Nancy.Ranekaexeloncorp.com]

Sent: Wednesday, October 28, 2009 12:21 PM To: andrew.imboden-nrc.gov Cc: Eccleston, Charles; Edward.Keatingopseg.com; john.hufnaciel(exeloncorp.com; albert.fulvioaexeloncorp.com; Ali.Fakhar&pseg.com; James.StavelyJr(&pseg.com

Subject:

Conference Call with PSEG Nuclear on Oct. 29, 2009 Datc: 10/29/2009K Time: 9:00 to 10:00 AM frV Call-In # = 1-866-560-5105;1 Hi Andy -

As we discussed on the phone, representatives of PSEG Nuclear and Exelon (PSEG's agent for the Salem and Hope Creek License Renewal) will participate in a conference call tomorrow morning at 9:00 AM with Charles Eccleston, the NRC's Environmental Project Manager. Since Charles has only recently been assigned to the Salem and Hope Creek projects, the purpose of the call is to provide an overview of the license renewal environmental reviews that PSEG Nuclear has completed and documented in the License Renewal Environmental Reports for the two plants. Your participation in the call would be welcome.

Other participant's in the call, besides you and Charles, will be the following:

Nancy L. Ranek, Exelon License Renewal Senior Environmental Lead Edward J. Keating, PSEG Nuclear Senior Environmental Advisor John G. Hufnagel, Jr., Exelon Senior License Renewal Licensing Lead Ali A. Fakhar, PSEG Nuclear Salem License Renewal Site Lead 1.

James M. Stavely, PSEG Nuclear Hope Creek License Renewal Site Lead I am attaching two files. One contains the handout for tomorrow's call. The other was used in March 2009 by the PSEG and Exelon Salem/Hope Creek teams to brief the NRC staff about the Salem and Hope Creek License Renewal projects.

This latter briefing occurred at a public meeting, so the presentation is probably already available in ADAMS.

Call-in information for tomorrow's conference call is located above the greeting in this message.

Please feel free to call me or John Hufnagel (610-765-5829) if there are questions.

Thanks.

Nancy L. Ranek License Renewal Environmental Lead Exelon Nuclear, LLC 200 Exelon Way, KSA/2-E Kennett Square, PA 19348 Phone: 610-765-5369 Fax: 610-765-5658 Email: nancy.ranlelk@exel.oncorp.cjom This e-mail and any of its attachments may contain Exelon Corporation proprietary information, which is privileged, confidential, or subject to copyright belonging to the Exelon Corporation family of Companies. This e-mail is intended solely for the use of the individual or entity to which it is addressed. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, distribution, copying, or action taken in relation to the contents of and attachments to this e-mail is strictly prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender immediately and permanently delete the original and any copy of this e-mail and any printout. Thank You. **************************************************

2

Salem & Hope Creek Generating Stations License Renewal Environmental Review PSEG Nuclear/N RC Telecon October 29, 2009

PSEG / Exelon Project Roles For Salem/HCGS Environmental Review e PSEG Nuclear = Applicant

  • Exelon = PSEG's Agent for Lic Renewal e Environmental Interface Roles 10/29/2009 2

714I 10'

~

I "Ale i V.;

10/29/2009 Salem & Hope Creek Generating Stations -- Setting 3

Contents of License Renewal ERs

  • More than 60% of information is identical for both plant ERs including:

Location and Features Demography Land Use Planning Social Services and Public Facilities Meteorology and Air Quality Historic and Archaeological Resources Housing Impacts Public Water Supply Impacts Offsite Land Use Impacts Historic & Cultural Resources Impacts o

Differences between the reports are due primarily to the following:

Different cooling water systems Ownership Ongoing groundwater tritium remediation Transmission Lines Severe Accident Mitigation Alternatives 10/29/2009 4

Summary of Applicability of Issues in 10 CFR 51, Appendix B, Table B-1 e 23 of 90 categorized issues apply to neither plant

. 59 of 90 categorized issues apply to both plants

  • 8 of 90 categorized issues apply to one plant but not the other (all due to different cooling systems)
  • 2 uncategorized issues 10/29/2009 5

Applicability of Category 2 Issues 4.1 Water Use Conflicts (Plants with Cooling Ponds or Cooling Towers Using Makeup Water from a Small River with Low Flow) 4.2 Entrainment of Fish and Shelfish in Ea ;v SIt, ag s 4.3 ! pi~miet of Fish and Shellfish 4.4 Heat Shock 4.5 C rowtd,,dwtati Use Conflicts (Plants Usiiiu >100 glpi of Groundwater) 4.6 Groundwater Use Conflicts (Plants Using Cooling Towers Withdrawing Makeup Water From a Small River)

4. 7 Groundwater Use Conflicts (Plants Using Ranney Wells) 4.8 Degradation of Groundwater Quality (Plants Using Cooling Ponds) 4.9 Impacts of Refurbishment on Terrestrial Resources 4.10 Threatened and Endangered Species 4.11 Air Quality During Refurbishment (Non-Attainment or Maintenance Areas) 4.12 Microbiological Organisms (Plants Using Cooling Pond, Lake, or Canal With Discharge to Small River) 4.13 Electric Shock from Transmission Line Induced Currents 4.14 Housing Impacts 4.15 Public Water Supply 4.16 Education Impacts from Refurbishment 4.17.1 Offsite Land Use (Refurbishment) 4.17.2 Offsite Land Use (Renewal term) 4.18 TranIsportation 4.19 Historic and Archaeological Resources 4.20 Severe Accident Mitigation Alternatives (SAMA)

Italic bold = Not Applicable to Either Regular bold = Applicable to Both Underline bold = Applicable to Salem only 10/29/2009 6

Site-Specific Topics

  • Status of Coastal Zone Management Act Consistency Determination by New Jersey
  • Endangered Species Consultations
  • New plant ESP 10/29/2009 7

Emerging Issues

  • Cumulative Impacts
  • Others 10/29/2009 8

Wrap Up

" Questions?

  • Action items, if any 10/29/2009 9

X ý Aý

ý ;

ý:

! ýý,ý:1
1

Welcome - Carl Fricker Introductions - Carl Fricker Purpose of the Meeting - Carl Fricker Overview of Salem & Hope Creek License Renewal Applications

.(LRA's) Preparation - Greg Sosson Environmental Reports - Christine Neely Closing Comments - Carl Fricker 2

Review the status and schedule of the Salem and Hope Creek License Renewal Applications preparations Discuss potential options for the NRC reviews that can take advantage of the many common programs and common elements of the Applications 0L PSEG P% uI3,.I.C

Provide assurance that Salem and Hope Creek can continue safe operation for an additional 20 years Applications will be highly consistent with the Generic Aging Lessons Learned (GALL) Guidance Applications will incorporate recent industry lessons learned 0 cSEG Nudleae.- L1,C4

Salem and Hope Creek License Renewal Applications (LRA's) 7/1/07 Project Kick-Off 8/18/09 SHC LRA's Submitted To NIRC 4/9/08 Scoping and Screening Completed 3/30/09 Environmental Reports ready to include in LRA's To NR 1 *0' f

I I

I I

I I

I I

I I II I

J1 l Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Jul 2007

/

q 2009 LRA 4/1/09 - 8/18/09 Assembly and Review LRA Reviews (Safety & Environmental):

" Industry Peer Reviews

" Focused Area Self-Assessment

" Plant Operations Review Committee (PORC)

" Nuclear Safety Review Board (NSRB)

" Senior Management Challenge 3/25/09 Aging Mgt. Program Reviews Completed PE 5

Site Organizations Procedures Programs Environment 0 PSEG

'U fern U.Li 6

I, F

L~i)

'is b~

j

~mA T-1 Sr ix Ii F,

i a,.

3,;

-mum

I Station VP Salem Bob Braun Director Engineering Manager Training Manager Regulatory Assurance Manager Nuclear Projects Plant Manager-Salem Assistant Plant Manage Director Operations Director Maintenance Director Work Mg-t Manager Radiation Protectio Manager Chemistry Radwaste and Environmental

-Manager Nuclear Oversight Station VP Hope Creek George Barnes Director Engineering Manager Training Manager Regulatory Assurance Manager Nuclear Projects Plant Manager-ope.

Creek

]

Assistant Plant Managei

]

Director Operations Director Maintenance 7irector Work Mgmt Manager Radiation Protection Manager Chemistry Radwaste and Environmental Manager Nuclear 1

Oversight Power President, COO Bill Levis President & CNO (1)

Tom Joyce VP Operations Support Carl Fricker Director Engineering Services Greg Sosson F License Renewal Ll Project Director Performance Improvment Director Nuclear Fuels Director Security r

Manager Outage Services Manager Maintenance Services Fire Department Supt I

Director Nuclear Director Regulatory Oversight Affairs Paul Davison Christine Neely Manager Salem NOS Manager Licensing Manager Hope Creek Manager Emergency NOS Preparedness Manager Employee Environmental CFAM Concerns Manager Audit Manager NOS Programs 2/27/09 IIIEG 8

Policies, Department Descriptions and Higher Level (above Operating) Procedures are common Common License Renewal Application Development Process 1, Scoping and Screening Methodology Aging Management Reviews Aging Management Programs PSEG 9

The majority of Programs are common (37 of the 58 Programs)

One Program Basis Document (PBD) is generated for each common program Common PBD's are prepared by one individual on the Project Team l

PSEG NufIcar 2".1,-,

10

  • ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD One-Time Inspection 0 Fire Water System 0 Bolting Integrity 0 Compressed Air Monitoring

° Selective Leaching of Materials 0 External Surfaces Monitoring 0 Inspection of Internal Surface~s in Miscellaneous Piping

-and Ducting Components

, 'Open-Cycle Cooling Water System Closed-Cycle Cooling Water System Fire Protection 0 Flow-Accelerated Corrosion 0 ýBuried Piping Inspection Buried Non-Steel Piping Inspection

  • Water Chemistry Fuel Oil.Chemistry Lubricating Oil Analysis 0

Reactor Head Closure Studs a

10 CFR Part 50, Appendix J Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems Periodic Inspection

  • Aboveground Steel Tanks
  • Aboveground Non-Steel Tanks

° ASME Section XI, Subsection IWF Protective Coating Monitoring and Maintenance Program RO 1.127, Inspection of Water-Control Structures Masonry Wall Structures Monitoring Program Boral Monitoring Program Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Electrical Cables and Connections Not Subject to 10 CFR50.49 Environmental Qualification Requirements Used in Instrumentation Circuits Inaccessible Medium Voltage Cables Not Subjectto 10 CFR 50.49 Environmental Qualification Requirements Metal-Enclosed Bus Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Environmental Qualification (EQ) of Electrical Components High Voltage Insulators p~ PSEG 11

Salem Hope Creek

" One-Time Inspection of ASME Code Class 1 Small-Bore Piping

" Metal Fatigue of Reactor Coolant Pressure Boundary (PWR)

Boric Acid Corrosion Nickel-Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors

  • Thermal Aging Embrittlement of CASS

" Periodic Inspection of ASME Code Class 1 Small-Bore Piping

" Metal Fatigue of Reactor Coolant Pressure Boundary (BWR)

" BWR Vessel ID Attachment Welds

" BWR Control Rod Drive Return Line Nozzle

" BWR Stress Corrosion Cracking

" BWR Penetrations

" BWR Vessel Internals BWR Feedwater Nozzle Reactor Vessel Surveillance

  • Thermal Aging and Neutron Embrittlement of CASS PSEG 12

V

~

'a I*I....

AMP'-

I-

~i.

i~2

Part of License Renewal Applications (Appendix E)

Both Salem and Hope Creek Environmental Reports have been prepared by Tetra-Tech NUS Tetra-Tech NUS has prepared more than 70% of the industry License Renewal Environmental Reports filed PSEG hIf 15

More than 60% of the report is identical for both plants including:

Location and Features Demography Land Use Planning

" Social Services and Public Facilities

  • Meteorology and Air Quality Historic and Archaeological Resources Housing Impacts Public Water Supply Impacts Offsite Land Use Impacts
  • Historic & Cultural Resources Impacts Differences between the reports are due primarily to the following:

" Different cooling water systems Ownership

  • Ongoing groundwater tritium remediation
  • Transmission Lines Severe Accident Mitigation Alternatives PSEG I,

cl,'ar 1i...:

16

Common Approach Experienced Project Team Incorporating Industry Experience Review Efficiency can be gained due to common programs on a single site Both Applications will be submitted on August 18, 2009

,,V*,Ir*+P ft 17