MONTHYEAR05000237/LER-2024-001, Containment Cooling Service Water Valve Failure Resulted in a Condition Prohibited by Technical Specifications and Loss of Safety Function2025-01-27027 January 2025 Containment Cooling Service Water Valve Failure Resulted in a Condition Prohibited by Technical Specifications and Loss of Safety Function ML24351A1452025-01-23023 January 2025 Request to Replace Previously Submitted Documents and Withhold Information from Public Disclosure 05000249/LER-2024-002, Low Pressure Coolant Injection Pump Suction Relief Valve Inoperable as a Primary Containment Isolated Valve Resulted in a Condition Prohibited by Technical Specifications2025-01-21021 January 2025 Low Pressure Coolant Injection Pump Suction Relief Valve Inoperable as a Primary Containment Isolated Valve Resulted in a Condition Prohibited by Technical Specifications ML25017A2302025-01-17017 January 2025 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Dresden Nuclear Power Station, Units 2 & 3 ML24353A1372025-01-15015 January 2025 Proprietary Determination Constellation Energy Generation, LLC 2024 Deferred Premiums IR 05000010/20240012024-12-31031 December 2024 NRC Inspection Report No. 05000010/2024001 ML24344A2742024-12-19019 December 2024 Alternative Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case OMN-32 RS-24-135, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-12-18018 December 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24352A2072024-12-17017 December 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24331A2592024-11-27027 November 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML24324A3202024-11-19019 November 2024 Letter from R. Mangum, Achp Regarding DNPS Subsequent License Renewal Environmental Review ML24323A0792024-11-15015 November 2024 Transmittal of Dresden, Units 2 and 3, Core Operating Limits Report Cycle 29 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24303A0712024-11-0404 November 2024 Letter to K. Meshigaud, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1342024-11-0101 November 2024 Letter to T. Carnes, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0692024-11-0101 November 2024 Letter to J.A. Crawford, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0202024-11-0101 November 2024 Letter to C. Chavers, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1442024-11-0101 November 2024 Letter to V. Kitcheyna, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0132024-11-0101 November 2024 Letter to B. Barnes, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0642024-11-0101 November 2024 Letter to J. Rupnick, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1172024-11-0101 November 2024 Letter to R. Yob, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0272024-11-0101 November 2024 Letter to D. Rios, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0512024-11-0101 November 2024 Letter to J. Barrett, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1422024-11-0101 November 2024 Letter to V. Jefferson, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0472024-11-0101 November 2024 Letter to G. Cheatham, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0602024-11-0101 November 2024 Letter to J. R. Shotton, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0552024-11-0101 November 2024 Letter to J. Keys, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0492024-11-0101 November 2024 Letter G. Kakkak, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0992024-11-0101 November 2024 Lett to R. Carter, Principal Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1352024-11-0101 November 2024 Letter to T. Rhodd, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision IR 05000237/20254012024-11-0101 November 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000237/2025401 05000249/2025401 ML24291A0252024-11-0101 November 2024 Letter to R. Blanchard Tribal Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0892024-11-0101 November 2024 Letter to M. J. Wesaw, Chair Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0152024-11-0101 November 2024 Letter to C. Harper, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1462024-11-0101 November 2024 Letter to W. Gravelle, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0172024-11-0101 November 2024 Letter to B. Peters, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0432024-11-0101 November 2024 Letter to E. Elizondo, Sr. Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1102024-11-0101 November 2024 Letter to R. Gasco, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0532024-11-0101 November 2024 Letter to J. Greendeer, President Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0302024-11-0101 November 2024 Letter to D.G. Lankford, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0242024-11-0101 November 2024 Letter to D. Kaskaske, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0202024-10-31031 October 2024 NRC Letter to J. Loichinger Achp Request for Comments Concerning the Environmental Review of DNPS Units 2 and 3 Subsequent License Renewal Application RS-24-126, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4)2024-10-31031 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4) ML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 2025-01-27
[Table view] Category:Congressional Correspondence
[Table view] |
Text
K EDO Principal Correspondence Control FROM:
DUE: 08/04/11 Representative Bobby L.
Rush EDO CONTROL: G20110529 DOC DT: 07/15/11 FINAL REPLY:
TO:
Chairman Jaczko FOR SIGNATURE OF :
- PRI CRC NO: 11-0416 Chairman Jaczko DESC:
ROUTING:
Status Update on Events at Dresden Generating Station (EDATS: SECY-2011-0413)
DATE: 07/19/11 Borchardt Weber Virgilio Ash Mamish OGC/GC
- Leeds, NRR Satorius, RIII
- Burns, OGC
- Schmidt, OCA ASSIGNED TO:
EDO CONTACT:
Rihm SPECIAL INSTRUCTIONS OR REMARKS:
Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179).
NRR and Region III to provide input to Roger Rihm,
- OEDO, if required.
Roger Rihm will coordinate response with OGC and OCA.
I-7 SEG+O jý0(
EDATS Number: SECY-2011-0413 Source: SECY GeneralInfomaio Assigned To: OEDO Other Assignees:
Subject:
Status Update on Events at Dresden Generating Station
==
Description:==
CC Routing: NRR; Regionlil; OGC; OCA ADAMS Accession Numbers -
Incoming: NONE OEDO Due Date: 8/4/2011 11:00 PM SECY Due Date: 8/8/2011 11:00 PM Response/Package: NONE I te Ifraion I
I Cross Reference Number: G20110529, LTR-I 1-0416 Related Task:
File Routing: EDATS Staff Initiated: NO Recurring Item: NO Agency Lesson Learned: NO OEDO Monthly Report Item: NO Proes Infomaion Action Type: Letter Priority: Medium Sensitivity: None Signature Level: Chairman Jaczko Urgency: NO Approval Level: No Approval Required OEDO Concurrence: YES OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region Ill to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.
II Doumn Infomaion Originator Name: Representative Bobby L. Rush Originating Organization: Congress Addressee: Chairman Jaczko Incoming Task Received: Letter Date of Incoming: 7/15/2011 Document Received by SECY Date: 7/18/2011 Date Response Requested by Originator: NONE Page 1 of I
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jul 16, 2011 05:58 PAPER NUMBER:
ACTION OFFICE:
LTR-11-0416 EDO LOGGING DATE: 07/16/2011 AUTHOR:
AFFILIATION:
ADDRESSEE:
REP Bobby Rush CONG Gregory Jaczko
SUBJECT:
Request status update on the events that took place at the Dresden Generationg Station..July 15th ACTION:
DISTRIBUTION:
LETTER DATE:
ACKNOWLEDGED SPECIAL HANDLING:
Signature of Chairman RF, OCA to Ack 07/15/2011 No Chairman Correspondence NOTES:
FILE LOCATION:
DATE DUE:
ADAMS 08,/2011 DATE SIGNED:
EDO -- G20110529
ASSISIANI WHIP BOBBY L. RUSH I ST DISTimCT, ILLINOIS CO-CHAIR
_______________AFRICAN PARTNERSHI-P FOR ECONOMIC GROWTH COMMITTEE ON ENERGY AND COMMERCE CO-CHAIR S, cOEMI
CONG1RESSIONAL 13IOTECHPNOLOGY CAUCUS RANIKING MkluTR, ENERGY AND POWER CO-CHAIR COMMTERCE. MANIUFACTURINGD AT/D TRADE
~
~JOBS Now! CAUCUS CGMI.IcA.
ANDuF~c~.,
I T.HNOLOGY CONGRESS OF THE UNITED STATES STFFRIN(I ANDf POIICY COMMITTIýE HousE OF REPRE.SENTATIVES WASHINGTON, D.C. 20515 July 15, 2011 The Honorable Gregory B. Jaczko Chairman U.S. Nuclear Regulatory Comnission Washington, DC 20555-0001
Dear Chairman Jaczko:
I am writing to request a status update on the events that took place at the Dresden Generating Station earlier this morning when plant operators declared an alert at 10:16 a.m.
According to a press release, an industrial chemical was released inside a trailer that was located on the campus of the facility but apart from where the nuclear reactors are stored.
It is my understanding that a non-radiological chemical was released was froin a pipe located above ground and this discharge has, subsequently, been stopped. I also understand that, out of precaution, two employees of the Dresden plant were evacuated and taken for observation due to inhalation of the chemicals.
The press release stated that cleanup efforts are already underway and an investigation into what caused the discharge has been initiated. The statement goes on to say that at no time was public safety at risk. However, I would like further clarification from the Nuclear Regulatory Agency (NRA) explaining exactly what happened and verifying if public safety is, or ever was, in jeopardy froom this event.
Due to the serious nature of this event, I would appreciate a timely and comprehensive response. You can direct your reply to my Senior Policy Advisor, Jolhn Marshall, at (202)225-4372 or JohaM(lhniail.hotusc. ov.
Thank you in advance for your attention and prompt response and I look forward to hearing back from you.
Bobby L. Rush Ranking Member Subcommittee on Energy and Power WASHIGTON CHICAGO MIOLOTHIAN 2268 RaybIumr House Office BOiilding 700-706 East 79th Stweet 3235 West 147th Street Washington, DC 20515-1301 Chicago, IL 60619-3102 Midlothian, IL 60445.3656