July 18, 2011 MEMORANDUM TO:
John R. Jolicoeur, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:
Andrew L. Hon, Project Manager
/RA/
Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF JUNE 21, 2011, ANNUAL INDUSTRY/U.S. NUCLEAR REGULATORY COMMISSION MATERIALS PROGRAMS TECHNICAL INFORMATION EXCHANGE MEETING - EXECUTIVE SESSION On June 21, 2011, a Category 2 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) management and executives from industry at U.S. Nuclear Regulatory Commission (NRC) at NRCs Church Street Building, 21 Church Street Rockville, MD 20850.
The purpose of the annual meeting is to discuss Office of Nuclear Reactor Regulation (NRR) management issues related to pressurized water reactor (PWR) and boiling water reactor (BWR) Materials Initiatives with the Electric Power Research Institute (EPRI) Materials Reliability Program (MRP), EPRI BWR Vessels and Internals Project (BWRVIP), EPRI Nondestructive Examination (NDE) Center, and the PWR Owners Group (PWROG) Materials Subcommittee.
The industry presented a description of the EPRI Action Plan Committee on Materials and presented strategic plans for the NDE, BWRVIP, Welding Research, Steam Generator Management (SGMP) and MRPs, and the PWROG Materials Program. A representative from the Nuclear Energy Institute (NEI) also attended the meeting. The NRC staff highlighted its materials program strategic issues related to reactor coolant pressure boundary materials degradation issues. The following highlights/action items were noted:
Quarterly technical and semi-annual executive level interactions between NRC and Industry Materials Programs have been valuable and should continue.
The NRC staff will provide the industry executives feedback related to licensee letters that provide notification of deviations from NEI 03-08 mandatory items.
The SGMP will provide a description of its fouling evaluation program and will provide a discussion of the ratio of SGMP effort devoted to original versus replacement steam generators.
The SGMP will propose a schedule for interacting with the NRC staff to define performance objectives and milestones for resolution of the SGMP open issues.
The SGMP executive and cognizant NRC manager will continue periodic (approximately monthly) teleconferences on the H* alternate repair criteria for steam generator tubes.
The MRP intends to issue MRP-227-A on December 31, 2011. The NRC staff will confirm that this date meets schedule objectives.
The MRP will provide a schedule for its future plans regarding primary water stress corrosion cracking of nickel-based alloy reactor vessel head penetrations in cold-head plants.
The MRP will provide a schedule for its plans to provide to the staff information related to peening and a roadmap for development and application of peening on dissimilar metal welds or Alloy 600 components.
In future meetings the industry will provide information that shows the effectiveness and the successes of the NEI 03-08 program in preventing materials degradation challenges to safe plant operation.
The MRP will provide to the NRC staff a listing and schedule for re-inspection of cold-head plants that have B&W tubular product materials installed. The schedule and the MRPs action and plans will be discussed during a conference call of the executives by the end of July 2011.
During quarterly technical coordination teleconferences, the NRC staff and industry will consider whether the duration and scope of this meeting needs to be increased in the future, and whether a discussion by the Institute of Nuclear Power Operations should be added to the agenda.
Industry will provide NRC management a listing of materials program organizational contacts.
NRC will define issues with respect to welding Alloy 52 and will follow progress on the issue via the quarterly technical coordination telephone calls.
Presentations are available electronically in the NRCs Agencywide Documents Access and Management System (ADAMS) under accession number ML111750580. The meeting notice and agenda are also available in ADAMS under accession number ML111290708. The attendance list is enclosed. Members of the public were not in attendance.
Please direct any inquiries to Robert Hardies at 301-415-5802 or Robert.Hardies@nrc.gov.
Project Nos. 669, 689, 691, 694, and 704
Enclosure:
List of Attendees cc w/encl: See next pages
cc:
Randy Stark, EPRI BWRVIP Integration Manager Raj Pathania, EPRI BWRVIP Mitigation Manager Ken Wolfe, EPRI BWRVIP Repair Manager Electric Power Research Institute 3420 Hillview Ave.
Palo Alto, CA 94304 rstark@epri.com rpathani@epri.com kwolfe@contractor.epri.com Randal J. Schmidt, Technical Chairman BWRVIP Assessment Committee PSEG Nuclear, LLC PO BOX 236 (M/S H06)
Hancocks Bridge, NJ 08038-0236 randal.schmidt@pseg.com Andrew D. Odell, Technical Chairman BWRVIP Mitigation Committee Exelon Corporation 200 Exelon Wy (M/S KSA-N-3)
Kennett Square, PA 19348 andrew.odell@exeloncorp.com Paul J. Davison, Executive Chairman BWRVIP Assessment Committee PSEG Nuclear, LLC Salem/Hope Creek Nuclear Station 11 Yubas Ave.
Burlington, NJ 08016 paul.davison@pseg.com Denver Atwood, Chairman BWRVIP Repair Focus Group Southern Nuclear Operating Co.
Post Office Box 1295 40 Inverness Center Parkway (M/S B031)
Birmingham, AL 35242-4809 dgatwood@southernco.com Rich Ciemiewicz, Chairman BWRVIP Inspection Focus Group Exelon Corporation 200 Exelon Way, Suite 210 (M/S KSA 2-N)
Kennett Square, PA 19349 richard.ciemiewicz@exeloncorp.com Charles J. Wirtz, Technical Chairman BWRVIP Integration Committee FirstEnergy Corp.
Perry Nuclear Power Plant (M/S A250) 10 Center Road Perry, OH 44081 cjwirtz@firstenergycorp.com Oscar Limpias, Chairman BWROG Entergy Nuclear Operations, Inc.
Echelon One 1340 Echelon Parkway.
Jackson, MS 39213-8202 olimpia@entergy.com Robert Carter, EPRI BWRVIP Assessment Manager Jeff Landrum, EPRI BWRVIP Inspection Manager EPRI NDE Center P.O. Box 217097 1300 W. T. Harris Blvd.
Charlotte, NC 28221 bcarter@epri.com jlandrum@epri.com Dennis Madison, BWRVIP Vice Chairman Site Vice President Southern Nuclear Operating Co.
Edwin I. Hatch Nuclear Plant US Hwy 1 N Baxley, GA 31515-2010 drmadiso@southernco.com
Robert Joseph Whalen, Executive Chairman BWRVIP Mitigation Committee Tennessee Valley Authority (TVA) 1101 Market St Chattanooga, TN 37402-2801 rjwhalen@tva.gov David M. Czufin, Chairman BWRVIP Exelon Corporation.
6500 North Dresden Road Morris, IL 60450 david.czufin@exeloncorp.com Robin Dyle EPRI 2577 Oakleaf Circle Helena, AL 35022 rdyle@epri.com Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mr. Neil Wilmshurst Vice President and Chief Nuclear Officer EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com Mr. David J. Modeen Director, External Affairs EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Dr. Sean Bushart EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 sbushart@epri.com Mr. Kurt Edsinger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 kedsinge@epri.com Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dsteinin@epri.com James P. Molkenthin Project Manager 20 International Dr Windsor, CT, USA 06095 molkenjp@westinghouse.com Jim Cirilli Exelon Nuclear Corporate Engineering Programs, Asset Management Mail Code KSA2-N 200 Exelon Way Kennett Square, PA 19348 James.Cirilli@exeloncorp.com James P. Molkenthin Project Manager 20 International Dr Windsor, CT, USA 06095 molkenjp@westinghouse.com
Jim Cirilli Exelon Nuclear Corporate Engineering Programs, Asset Management Mail Code KSA2-N 200 Exelon Way Kennett Square, PA 19348 James.Cirilli@exeloncorp.com
2011 Annual Industry/U.S. Nuclear Regulatory Commission Materials Programs Technical Information Exchange Meeting Executive Session Attendees List ENCLOSURE
Presentations are available electronically in the NRCs Agencywide Documents Access and Management System (ADAMS) under accession number ML111750580. The meeting notice and agenda are also available in ADAMS under accession number ML111290708. The attendance list is enclosed. Members of the public were not in attendance.
Please direct any inquiries to Robert Hardies at 301-415-5802 or Robert.Hardies@nrc.gov.
Project Nos. 669, 689, 691, 694, and 704
Enclosure:
List of Attendees cc w/encl: See next pages DISTRIBUTION PUBLIC PLPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDci RidsNrrDprPlpb RidsNrrDe MichelleEvans JohnLubinski AlCsontos MatthewMitchell RobertHardies WilliamBurton RidsNrrLADBaxley RidsOpaMail PMNS RidsNrrPMAHon RidsOgcMailCenter RidsAcrsAcnwMailCenter ADAMS ACCESSION NO.: ML111930110 Memo, ML111930105Package NRC-001 OFFICE PLPB/PM DCI/SLA PLPB/LA PLPB/ BC PLPB/PM NAME AHon JLubinski for RHardies DBaxley JJolicoeur AHon DATE 7/12/2011 7/18/11 7/18/11 7/18/11 7/18/11