MONTHYEARML23271A0612023-09-26026 September 2023 NPS, Units 1 and 2, Reference for ISFSI from Zion Solutions ML23233A1502023-08-11011 August 2023 Extent of Condition Request for 2023 Confirmatory Survey ML23116A0072023-04-21021 April 2023 April 21, 2023, Zion Solutions Clarification Regarding Its LTP and DRP Strategy ML23116A0082023-04-0404 April 2023 Units. 1 and 2: April 4, 2023 Zion Solutions Clarification Regarding Its LTP and DRP Strategy ML23057A0162023-02-27027 February 2023 Email La Crosse Boiling Water Reactor Request for Information East Portion of Survey Unit L1-010-102 ML23055A0282023-02-24024 February 2023 Completion of License Termination Activities and Release of Remaining Class 1 Survey Units from Possession Only License No. DPR-45 ML22319A0142022-11-15015 November 2022 Emails Transmitting EA for Proposed Renewal of GEH Morris Operation ISFSI License SNM-2500 ML22321A0152022-11-0303 November 2022 Email La Crosse RCI Response Follow-Up ML22277A4962022-09-0707 September 2022 (External) Discussion of La Crosse Class 1 Survey Unit Review - WTB Specifics and Other Open Items ML22277A4632022-08-22022 August 2022 (External) Additional Question for Es About WTB Sample Judgmental 16 ML22277A4222022-08-16016 August 2022 Additional Question for Es About WTB Sample Judgmental 16 ML22222A0522022-08-0909 August 2022 Email to Illinois State Agencies Request for Review of Draft Environmental Assessment - Proposed License Renewal for the Morris Operation Independent Spent Fuel Storage Installation ML22277A4382022-08-0909 August 2022 NRC Call on Isocs Geometry at LACBWR ML22277A3512022-07-0505 July 2022 Additional Clarification Questions on the La Crosse Class 1 Survey Units ML22277A4752022-05-31031 May 2022 (External) La Crosse Class 1 Review Questions ML22117A1552022-04-20020 April 2022 Attachment - Agenda for NRC Meeting May 10, 2022 ML22117A1542022-04-20020 April 2022 E-Mail - May 10, 2022 Meeting with Dairyland Power on La Crosse ISFSI Management ML22116A0992022-04-19019 April 2022 4-19-2022 E-Mail Request for Clarification on GEH Responses to RAIs on Morris License Renewal Application ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22040A1162022-02-0808 February 2022 Email to G. Van Noordennen Zion and La Crosse Review Schedule Changes ML22027A3712022-01-26026 January 2022 Znps: CY2022 Inspection Plan, Docket Nos.: 05000295 and 05000304, License Nos.: DPR-39; DPR-48 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML22063B1752021-08-30030 August 2021 Email and Letter from D. Hunter of Miami Tribe NRC Preliminary Determination Under Section 106 of the NHPA for Proposed GE-Hitachi Morris Operation ISFSI License Renewal ML21340A2522021-08-18018 August 2021 Email from Il Shpo Determination of No Potential to Cause Effects - Proposed Renewal of NRC License for GE Hitachi Morris Operation ISFSI ML22063B1742021-08-10010 August 2021 Email from S. Thomas-Bear of Winnebago Tribe NRC Preliminary Determination Under Section 106 of the NHPA for Proposed GE-Hitachi Morris Operation ISFSI License Renewal ML21167A3322021-06-15015 June 2021 Request for Additional Information on Morris Operation Decommissioning Funding Plans ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21134A1442021-05-13013 May 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Emergency Plan ML21118A2282021-04-27027 April 2021 E-Mail to Gerry Van Noordennen, Zion Solutions, from John Hickman, NRC, Forwarding Acceptance Review of Request for Extension of Order Approving Transfer of Licenses for Zion Nuclear Power Station, Units 1&2 from Zionsolutions to Exelon Gen ML21096A1662021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Zionsolutions Exemptions for the Magnastor Storage Cask ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21085A8592021-03-22022 March 2021 3/22/2021 E-mail Request for Clarification of 2/26/2021 Rsi Response for GEH-Morris License Renewal Application ML21032A2122021-02-0101 February 2021 LACBWR: CY2021 Inspection Plan ML20213C3252020-07-31031 July 2020 7-31-2020 Email Acknowledgement of NRC Receipt of GEH Morris Operation LRA and Start of Acceptance Review.Pdf ML20195A5642020-07-12012 July 2020 Acceptance Review for the LACBWR License Transfer Order Extension ML20115E5372020-04-24024 April 2020 Acceptance Review for the LACBWR Partial Site Release ML20015A2922020-01-14014 January 2020 LACBWR: CY2020 Master Inspection Plan ML20015A2982020-01-14014 January 2020 Znps: CY2020 Master Inspection Plan ML19210D1152019-07-24024 July 2019 (E-Mail 07-24-19) Exelon LAR Demonstration Drills ML19189A0662019-05-20020 May 2019 Response from St. John, Lower Sioux Indian Community Regarding LACBWR Ltp ML19105A0192019-04-0303 April 2019 Ho-Chunk Nation, Mr. Quackenbush, Response Regarding LACBWR Ltp ML19121A5932019-04-0202 April 2019 Response from St. John, Lower Sioux Indian Community Regarding LACBWR Ltp ML19105A0202019-04-0101 April 2019 Santee Sioux Nation Nebraska, Mr. Whipple, Response LACBWR Ltp ML19099A1202019-04-0101 April 2019 Boiling Water Reactor - Occupational Radiation Exposure Annual Report for 2018 ML19105A0182019-04-0101 April 2019 Forest County Potawatomi, Mr. Laronge, Response LACBWR Ltp ML19064B3282019-03-0505 March 2019 Next Steps for Addressing the Wisconsin Shpo Comments on the LACBWR Ltp ML19031B1592019-01-29029 January 2019 Wdhs Comments on LACBWR Ltp EA 2023-09-26
[Table view] |
Text
Benner, Eric From: Ordaz, Vonna Sent: Tuesday, April 05, 2011 10:07 AM To: Weaver, Doug; Benner, Eric
Subject:
RE: Course of action for inspections at stand alone spent fuel pools Doug - stop by when you get a chance. I need to fill you in on what evolved on this yesterday.
From: Weaver, Doug Sent: Tuesday, April 05, 2011 10:03 AM To: Benner, Eric Cc: Ordaz, Vonna
Subject:
FW: Course of action for inspections at stand alone spent fuel pools
- Eric, Does this sound right?
We owe a response back to Cathy on what we are doing, so if this is good, I will use it to answer the mail.
Doug From: Louden, Patrick Sent: Tuesday, April 05, 2011 8:26 AM To: Weaver, Doug
Subject:
FW: Course of action for inspections at stand alone spent fuel pools From: Lipa, Christine Sent: Monday, April 04, 2011 3:49 PM To: Camper, Larry; Louden, Patrick; McConnell, Keith; Watson, Bruce; Ordaz, Vonna; Benner, Eric; Boland, Anne Cc: Slawinski, Wayne; Edwards, Rhex; Learn, Matthew; Rodriguez, Lionel
Subject:
FW: Course of action for inspections at stand alone spent fuel pools As discussed on today's call between reps from Region Ill, FSME, and NMSS, we have determined a course of action to provide us with additional assurance that the stand alone spent fuel pools have adequate measures in place to ensure adequate protection of public health and safety. We also plan to discuss this plan with Region I to ensure alignment.
Specifically, we discussed that Region III would conduct an inspection at each of our 3 stand alone spent fuel pools (Zion, LaCrosse, and GE Morris) by the date of April 29, 2011. The scope of the inspection would be to ensure site specific coping strategies for the loss of fuel pool cooling and water supply are developed and maintained in a state of readiness. We would use the existing IP 60801 ("Spent Fuel Pool Safety at Shutdown Reactors") and expand the scope to include the applicable elements of TI 2515/183. By using TI 2515/183 as our guide, the focus will be to evaluate and verify the licensee's capability to mitigate conditions that result from station black out (SBO) conditions, seismic, flooding, fires, and beyond design basis events. These include an assessment of licensee procedures, capabilities and actions to ensure:
SBO
(1) Materials/equipment (for pool cooling/makeup water DC power) are available and maintained (2) Procedures for SBO response are developed (3) Personnel are trained and procedures are executable Seismic, flooding and fires and Beyond Design Basis Events (1) Strategies (ad-hoc or otherwise) are developed to mitigate the impact of fire, flood and seismic events from adversely affecting the spent fuel (2) Materials/equipment are adequate and staged (i.e., barriers such as curbing/walls/doors, penetration seals, fire protection equipment)
(3) Procedures to implement the mitigating strategies are developed (4) Personnel are trained and procedures are executable Christine A. Lipa Chief, Materials Control, ISFSI, and Decommissioning Branch U.S. Nuclear Regulatory Commission, Region III 630-829-9834 2