ML11187A327

From kanterella
Jump to navigation Jump to search
Watch Reply to Entergy'S July 5, 2011 Response and Objection to Pilgrim Watch Memorandum-Submerged Cables
ML11187A327
Person / Time
Site: Pilgrim
Issue date: 07/06/2011
From: Lampert M
Pilgrim Watch
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 20575, 50-293-LR, ASLBP 06-848-02-LR
Download: ML11187A327 (1)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket # 50-293-LR Entergy Corporation Pilgrim Nuclear Power Station License Renewal Application July 6, 2011 PILGRIM WATCH REPLY TO ENTERGYS JULY 5, 2011 RESPONSE AND OBJECTION TO PILGRIM WATCH MEMORANDUM- SUBMERGED CABLES Entergy yesterday objected to Pilgrim Watch Memorandum - Submerged Cables filed June 23, 2011. In doing so, Entergy mischaracterized Pilgrim Watchs filing. Pilgrim Watchs Memorandum simply called the Boards attention to new and significant facts. It did not argue the merits of its contention.

Respectfully submitted, (Signed Electronically)

Mary Lampert Pilgrim Watch, pro se 148 Washington Street Duxbury MA 02332 Tel 781-934-0389 Email: mary.lampert@comcast.net July 6, 2011