ML11187A327
| ML11187A327 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/06/2011 |
| From: | Lampert M Pilgrim Watch |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| References | |
| RAS 20575, 50-293-LR, ASLBP 06-848-02-LR | |
| Download: ML11187A327 (1) | |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket # 50-293-LR Entergy Corporation Pilgrim Nuclear Power Station License Renewal Application July 6, 2011 PILGRIM WATCH REPLY TO ENTERGYS JULY 5, 2011 RESPONSE AND OBJECTION TO PILGRIM WATCH MEMORANDUM-SUBMERGED CABLES Entergy yesterday objected to Pilgrim Watch Memorandum - Submerged Cables filed June 23, 2011. In doing so, Entergy mischaracterized Pilgrim Watchs filing. Pilgrim Watchs Memorandum simply called the Boards attention to new and significant facts. It did not argue the merits of its contention.
Respectfully submitted, (Signed Electronically)
Mary Lampert Pilgrim Watch, pro se 148 Washington Street Duxbury MA 02332 Tel 781-934-0389 Email: mary.lampert@comcast.net July 6, 2011