MONTHYEARML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) ML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer ML21096A1332021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Dominion Energy Exemptions for the Magnastor Storage Cask ML20015A3002020-01-14014 January 2020 KPS: CY2020 Master Inspection Plan ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19072A0652019-03-0606 March 2019 Conversation Record with T. Szymanski/Dominion Energy Response to 10 CFR 72.30(c)(3) in Triennial Update for Kewaunee ML19070A2642019-03-0505 March 2019 Email Conversation with T. Szymanski/Dominion Energy Decommissioning Funding Plan (Dfp): Kewaunee ML18351A2742018-12-17017 December 2018 KPS: CY2019 Master Inspection Plan ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML17156A0032017-06-0202 June 2017 NRR E-mail Capture - Acceptance for Review of Revision 24 to the Dominion Nuclear Facility Quality Assurance Program Description (QAPD) Topical Report (CAC Nos. MF9732-MF9739) ML17040A0222016-10-18018 October 2016 Wisconsin State Notification (LAR259-L53082) ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A2732016-02-10010 February 2016 Final RAIs Regarding LAR 259 ML16054A2382015-10-14014 October 2015 E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (Areva) for Kewaunee Power Station ML15090A4872015-03-26026 March 2015 OEDO-15-00251 - Michael Mulligan, Citizen Ltr 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15071A2752015-03-12012 March 2015 NRR E-mail Capture - Request for Additional Information on Kewaunee 50.54(p) Changes to Physical Security Plan - TAC MF5779 ML15057A2192015-02-25025 February 2015 NRR E-mail Capture - Acceptance Review: Dominion Fleet-Request for Approval of Cyber Security Plan (CSP) Revised Implementation Schedule ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14251A0972014-08-22022 August 2014 NRR E-mail Capture - Draft RAI to Kewaunee Power Station on Control Room Staffing Issue ML14164A0742014-06-0202 June 2014 NRR E-mail Capture - Draft Request for Additional Information Concerning Dek'S Request for Exemption from Conducting Annual Force-on-Force Exercises at Kewaunee Power Station ML14132A2062014-04-27027 April 2014 NRR E-mail Capture - Kewaunee Amendment Request for Emergency Plan Changes MF3411 - Draft RAIs ML14155A0402014-04-0707 April 2014 NRR E-mail Capture - Summarry of Kewaunee Mitigation Strategy Phone Call Last Week ML14134A5872014-04-0707 April 2014 NRR E-mail Capture - Minor Editorial/Typographical Changes to License Condition TAC MF1771) ML14097A5112014-04-0101 April 2014 NRR E-mail Capture - Draft RAI Related to Kewaunee Proposed Deletion of License Condition on Mitigation Strategy ML14069A3832014-03-0606 March 2014 NRR E-mail Capture - Draft RAI on Kewaunee Permanently Defueled Technical Specifications ML13312A2422013-11-0707 November 2013 NRR E-mail Capture - MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information ML13297A0482013-10-23023 October 2013 NRR E-mail Capture - MF2567 - Kewaunee Eplan RAI #1 and Comparable Wording from Other Eplans ML13295A5672013-10-22022 October 2013 NRR E-mail Capture - MF2567 Kewaunee Exemption Nlar 102 (50.47 and 10 CFR Appendix E) Includes Kewaunee EP Briefing - 19 June 2013 Handout ML13275A0772013-10-0101 October 2013 NRR E-mail Capture - MF2743-RAII-AHPB-Keefe-001-2013-10-01 Request for Additional Information ML13275A0722013-10-0101 October 2013 NRR E-mail Capture - FW: MF1771-MF1952 RAI 9-27-2013.docx ML13275A0622013-09-27027 September 2013 NRR E-mail Capture - FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) Training - (Corrected) Request for Additional Information (RAI) ML13246A0032013-08-30030 August 2013 NRR E-mail Capture - Record of Docketing of Certifications Pertaining to Decommissioning of Kewaunee Power Station (KPS) ML13218B3722013-08-0606 August 2013 NRR E-mail Capture - MF1952 KPS Permanently Defueled License and TS - Request for Additional Information - MF1952-RAII-SCVB-Heida-001-2013-08-06 ML13186A0212013-07-0303 July 2013 NRR E-mail Capture - MF1771 - Correction to Stated Date Due for Request for Information Dated 6/26/2013 (ML13178A011) ML13178A0112013-06-26026 June 2013 NRR E-mail Capture - MF1771 (and Part of MF1952) - KPS - Record of Clarification Call and Associated Request for Additional Information (RAI) Deletion of License Condition 2.C.(15) ML13151A2452013-05-29029 May 2013 NRR E-mail Capture - Kewaunee Correspondence - Dispositioning Flawed Document, Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML13149A0412013-05-28028 May 2013 NRR E-mail Capture - MF1771 - Kewaunee LAR 255 Deletion of Licensing Condition 2.C.(15) - LIC-109 Acceptance Review Results ML13144A1002013-05-23023 May 2013 NRR E-mail Capture - Record of Docketing of Outgoing NRC Correspondence Serial No. 13-293: Certification of Permanent Removal of Fuel -- Confirming Successful EIE Docketing ML13134A5272013-05-14014 May 2013 NRR E-mail Capture - ML13133A086 = MF1438 - KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13133A0862013-05-10010 May 2013 NRR E-mail Capture - FW: MF1438 KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13128A3612013-05-0707 May 2013 NRR E-mail Capture - MD7112 - Record of Permanent Cessation of Operations 10CFR50.4(b)(8), 10CFR50.82, and the Scheduling of Certain Future Decommissioning Events 2024-01-26
[Table view] |
Text
NRR-PMDAPEm Resource From: Craig D Sly [craig.d.sly@dom.com]
Sent: Friday, July 01, 2011 3:06 PM To: Feintuch, Karl
Subject:
RE: NFPA 805 Commitment Letter from Kewaunee Attachments: 08-0451.pdf; ML082710001.pdf
- Karl, Heres the story for Kewaunee.
Kewaunee submitted its Letter of Intent in July 2008 (attached) and our NRC enforcement discretion expires end of July 2011 (not end of June like most other plants) (see attached ML082710001).
Our internal project schedule indicates we will submit by July 29, 2011, but there is absolutely no float in the schedule and its going to be very tight. We have known that we have a tight schedule to meet July 29, and some weeks ago I developed a letter that would change our current commitment from July 29 to August or September. This letter has been reviewed and approved and is currently sitting on the desk of my VP-Engineering for final signature (its considered a contingency at this point).
Senior management is pushing the project to meet the July 29 date, but they also realize that we may need some extra time for internal review and approval of this large document.
Now, as to your e-mail. It sounds like Staff is expecting a commitment letter from everyone who is not going to submit before July 1, 2011. If this is so, then I have mis-interpreted the SECY 11-061 document. I read the document to mean submit before your enforcement discretion runs out.
Maybe I was overly focused on the underlined sentence below and the fact that Kewaunee enforcement discretion expires end of July 2011. I have led my management to the conclusion that either we will submit the LAR by the end of July or we will send in a commitment letter sometime near the middle of July stating that we will submit the 805 LAR at the end of August or September (depending on how much additional time we will need).
If I have not met the intention of SECY, please let me know. If I need to submit the commitment letter on my VPs desk ASAP, let me know that too.
- Regards, Craig Sly Dominion Resources Services, Inc.
Nuclear Licensing and Operations Support W: 8042732784 C: 8042412473 SECY 11-0061 Cover doc: Pg. 3 para 4.
An industry working group is currently generating a list of transitioning licensees with suggested corresponding LAR submittal dates necessary to support this staggered submittal approach.
Once the working group completes this list, the staff will review and decide whether to approve it. The approved sequencing will also include submittal dates for licensees who are currently 1
scheduled to submit sometime after June 29, 2011. Each licensee will be required to submit a letter to the NRC acknowledging the agreed-upon commitment date with the exception of the first group of licensees that are scheduled to submit around July 1, 2011. The NRC expects that all commitment letters will be submitted before the current enforcement discretion expires on June 29, 2011. Enforcement discretion will continue while the staff processes and responds to the commitment letters.
Enclosure Pg 4: bottom pg. 4/pg. 5 top An industry working group is currently generating a list of transitioning licensees with suggested corresponding LAR submittal dates necessary to support this staggered submittal approach. Once the working group completes the list, the staff will review and decide whether to approve it. The NRC expects the sequencing of the submittals to result in approximately 7 LARs by July 1, 2011; 10 additional LARs by July 1, 2012; another 10 LARs by July 1, 2013; and the remainder by July 1, 2014. The NRC will require licensees, with the exception of the first group of licensees scheduled to submit around July 1, 2011, to submit a letter by June 29, 2011, that acknowledges their new commitment date. Enforcement discretion will continue while the staff is processing and responding to the commitment letters.
From: Feintuch, Karl [1]
Sent: Friday, July 01, 2011 1:34 PM To: Craig D Sly (Generation - 6)
Subject:
NFPA 805 Commitment Letter from Kewaunee
- Craig, Doug Pickett contacted me concerning a commitment letter pertaining to NFPA-805. Currently, the NRC staff expects a submittal by July 29 and is concerned that Dominion Energy Kewaunee (DEK) may be under the impression that it does not need to submit a commitment letter. However, since DEK did not meet the June 29 date, NRC staff was expecting a commitment letter.
Over the past few days I noted some increased submittal traffic (the commitment letter not among them), and you and I encountered one EIE submittal problem at our end. Please let me know the status of the NFPA commitment letter.
Karl Feintuch 301-415-3079 CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.
2
Hearing Identifier: NRR_PMDA Email Number: 92 Mail Envelope Properties (DECB54B0BB23DC4E8E8C1B7C4741C45023EB0AAEF2)
Subject:
RE: NFPA 805 Commitment Letter from Kewaunee Sent Date: 7/1/2011 3:05:30 PM Received Date: 7/1/2011 3:05:37 PM From: Craig D Sly Created By: craig.d.sly@dom.com Recipients:
"Feintuch, Karl" <Karl.Feintuch@nrc.gov>