ML11181A039
| ML11181A039 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/17/2011 |
| From: | Cortez J Ameren Missouri |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ULNRC 5799 | |
| Download: ML11181A039 (2) | |
Text
WAmeren MISSOURI Callaway Plant June 17, 2011 ULNRC 5799 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
OPERATOR LICENSING EXAMINATION DATA Enclosed is a NRC Form 536 for the Callaway Nuclear Plant, NRC Region IV.
If you need any additional information, please contact Mr. Juan J. Cortez at (314) 225-4642.
JJC/mrw Enclosure AmerenMissouri.corn PO Box 620 Fulton, MO 65251
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or b internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Callaway Nuclear Plant Region IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 Cy 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 20 1 4 Cy 2015 Cy 2016 NUMBER OF REACTOR 6
2 0
2 OPERATORS NUMBER OF SENIOR REACTOR 5
6 0
3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3
4 0
3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 03/18/2013 09/01/2014 03/21/2016 ALTERNATE DATE 03/25/2013 09/08/2014 03/28/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I
NRC FORM 536 010-2008)
PRINTED ON RECYCLED PAPER