ML11180A057

From kanterella
Jump to navigation Jump to search
R. E. Ginna - Response to RIS 2011-08, Preparation and Scheduling of Operator License Examination
ML11180A057
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/24/2011
From: Geckle M
Constellation Energy Nuclear Group, EDF Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2011-08
Download: ML11180A057 (4)


Text

Mark Geckle R.E. Ginna Nuclear Power Plant, LLC Manager, Nuclear Training Department 1503 Lake Road Ontario, New York 14519-9364 585.771.5214 Mark.Geckle@cengllc.com CENG a joint venture of onstltlaeon eDF June 24, 2011 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk

SUBJECT:

R.E. Ginna Nuclear Power Plant Docket No. 50-244 Response to RIS 2011-08, Preparation and Scheduling of Operator License Examinations Attached you will find NRC Form 536 providing R.E. Ginna's expected license examination schedule information.

Should you have any questions, please contact Mr. Kyle Garnish, General Supervisor, Operations Training, at 585-771-5321.

Very trulyAours, Mark Geckle

Enclosure:

Operator Licensing Examination Data, Form 536 cc (w/enc): W. M. Dean, NRC D. V. Pickett, NRC Resident Inspector, NRC

&JPLAJRC- lob,243-7

Document Control Desk June 24, 2011 Page 2 bcc: C.W. Fleming, Esquire T.L. Harding M.A. Geckle COMMITMENTS IDENTIFIED IN THIS CORRESPONDENCE:

  • None

ENCLOSURE Operator Licensing Examination Data, Form 536

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION R. E. Ginna Nuclear Power Plant 1503 Lake Rd., Ontario, NY 14519 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2013 Cy 2014 CY 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 Cy 2014 CY 2015 CY 2016 NUMBER OF REACTOR 0 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 0 4 4 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 2 2 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 03/24/2014 10/05/2015 ALTERNATE DATE 03/31/2014 10/12/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 10 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER