Request for Additional Information, Report of Status of Decommissioning Funding
ML11179A197
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/29/2011
From: Martin R
Plant Licensing Branch II
To: Gatlin T
South Carolina Electric & Gas Co
Martin R, NRR/DORL/LPL2-1, 415-1493
References
Download: ML11179A197 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 29, 2011 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88 Jenkinsville, SC 29065

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 - REQUEST FOR ADDITIONAL INFORMATION (RAI)

Dear Mr. Gatlin:

By letter dated March 31, 2011 (Agencywide Documents Access and Management System Accession No. ML110940029), South Carolina Electric & Gas Company submitted its Report of Status of Decommissioning Funding for the Virgil C. Summer Nuclear Station, Unit No.1. We have determined that additional information is required as addressed in the enclosure.

We request that a response be provided within 30 days of the date of this letter.

Sincerely, 17

~R~Martin, d/71l~ Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395

Enclosure:

RAI cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE 2011 DECOMMISSIONING FUNDING STATUS REPORT FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 The request for additional information (RAI) provided is in response to the South Carolina Electric & Gas Company's (SCE&G) 2011 Decommissioning Funding Status (DFS) report. On March 31, 2011, SCE&G submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2011 DFS report for the Virgil C. Summer Nuclear Station (VCSNS), as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) (Agencywide Documents Access and Management System (ADAMS), Accession No. ML110940029). SCE&G is requested to provide a response within 30 days from the date of this letter.

RAI #1: Citation for real rate of return:

Provide the citation (e.g., an Order by the rate-regulatory authority) by the regulatory entity that allows for the assumptions used regarding rates of escalation in decommissioning costs, rate of earnings on decommissioning funds and rates of other factors assumed as stated within the DFS report.

On March 31, 2011, SCE&G reported a 2-percent real rate of return for its share of VCSNS.

As stated in 10 CFR 50.75(f)(1):

[T]he information in this [DFS] report must include [...] the assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections ...

RAI #2: After-tax decommissioning funds as of December 31,2010:

Indicate if the amount of decommissioning funds identified within the DFS report for VCSNS, are the after-tax amounts of decommissioning funds accumulated through December 31, 2010. If not, provide the after-tax amounts of decommissioning funds accumulated through December 31,2010.

On March 31, 2011, SCE&G reported the amount of decommissioning funds accumulated as of December 31,2010, for VCSNS but did not indicate if the amounts stated were the before or after-tax balances.

The provisions of 10 CFR 50. 75(f)(1) and (2) require the licensee to report the amount of funds accumulated to the end of the calendar year preceding the report.

RAI #3: Citation for site-specific study:

Provide the site-specific cost estimate for VCSNS, unless it was previously submitted to NRC. If the cost estimate was previously submitted to NRC, then provide a reference to its submittal.

Enclosure

- 2 The site-specific cost estimate should include a summary schedule of annual expenses, projected earnings, and end-of-year fund balances, expressed in 2010 dollars.

On March 31, 2011, SCE&G provided a site-specific cost estimate for the amount of decommissioning funds estimated to be required in 2006 dollars, but did not include the cost escalation factor(s} that would be used to escalate the site-specific cost estimate to 2010 dollars.

Per 10 CFR 50.75(e)(1}(i) and (ii), the licensee must specifically describe the safe storage period in order to take credit for projected future earnings when it uses a site-specific estimate as the basis for using the prepayment or external sinking fund methods of financial assurance.

RAI 4: Decommissioning scenario inconsistency:

Clarify the inconsistency of decommissioning scenarios presented by SCE&G and Santee Cooper.

On March 31,2011, SCE&G provided a site-specific cost estimate for a safe storage (SAFSTOR) decommissioning scenario. SCE&G stated in its DFS report that it " ... currently intends to utilize a deferred decommissioning (SAFSTOR) scenario." However, in Santee Cooper's DFS report submitted on March 29, 2011 (ADAMS Accession No. ML110900185),

Santee Cooper intends to utilize an immediate decommissioning scenario (DECON). Santee Cooper stated, "the plant will be immediately decommissioned upon license expiration."

Per 10 CFR 50.75(e)(1)(i) and (ii), the licensee must specifically describe the safe storage period in order to take credit for prOjected future earnings when it uses a site-specific estimate as the basis for using the prepayment or external sinking fund methods of financial assurance.

June 29, 2011 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88 Jenkinsville, SC 29065 SUB~IECT: VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 - REQUEST FOR ADDITIONAL INFORMATION (RAI)

Dear Mr. Gatlin:

By letter dated March 31, 2011 (Agencywide Documents Access and Management System Accession No. ML110940029), South Carolina Electric & Gas Company submitted its Report of Status of Decommissioning Funding for the Virgil C. Summer Nuclear Station, Unit NO.1. We have determined that additional information is required as addressed in the enclosure.

We request that a response be provided within 30 days of the date of this letter.

Sincerely, IRA!

Robert E. Martin, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395

Enclosure:

RAI cc w/encl: Distribution via Listserv DISTRIBUTION PUBLIC LPL2-1 R1F RidsAcrsAcnw_MailCTR Resource RidsNrrDoriDpr Resource RidsNrrDorlLpl2-1 Resource RidsRgn2MailCenter Resource RidsNrrLAMOBrienResource RidsOgcRp Resource jSimpson. NRR MPurdie, NRR RidsNrrPMSummer Resource ADAMS Accesslon Number: ML11179A197 *b)y memo daet d 5/11/11 OFFICE LPL2-1/PM LPL2-1/LA NRRlDPRlPFIB/BC LPL2-1/BC GKulesa NAME RMartin MO'Brien CRegan

  • I (JThompson for)

DATE 06/29/11 06/29/11 05/11/11 06129111 OFFICIAL RECORD COPY