Requalification Program Inspection - Salem Nuclear Generating Station, Units 1 and 2
ML111790523
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/25/2011
From: Hansell S
Operations Branch I
To: Joyce T
Public Service Enterprise Group
Shared Package
ML110030668 List:
References
Download: ML111790523 (4)


Text

UNITED STATES N UGLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KlNG OF PRUSSIA. PA 19406-1415 June 25, 2011 Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

REQUAL]FICATION PROGRAM INSPECTION - SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2

Dear Mr. Joyce:

In a telephone conversation on June 22,2011, Mr. Todd Fish, Sr. Operations Engineer, and Mr. Jack Carney, Operations Training Manager, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Sal-em tacitity. The inspection is planned for the week of August 22,2011, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by August 15,2011.

Mr. Carnly has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1gg5 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018' The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these inforrhation collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),

U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mailto INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.20503.

T. Joyce 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://vrnvw.nrc.oov/readinq-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. lf you have any questions regarding this inspection, please contact Mr. Fish at (610) 337-5369.

Sincerely, Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-272, 50-31 1 License Nos.: DPR-70, DPR-75 cc: Distribution via ListServ

T. Joyce 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readino-rm/adams.html(The Public Electronic Reading Room).

Thank you for your cooperation in this matter. lf you have any questions regarding this inspection, please contact Mr. Fish at (610) 337-5369.

Sincerely,

/RN Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-272,50-311 License Nos.: DPR-70, DPR-75 cc: Distribution via ListServ Distribution: See next page SUNSI Review Complete: SLH (Reviewer's Initials)

ADAMS PKG: ML110030668 ADAMS ACC #MLl11790523 DOCUMENT NAME: G:\DRS\Operations Branch\FlSH\Requal ,FISH\Requal FY1 1 -SAL Augl 1 \60dayrpi.doc

\60dayrp After declaring this document "An Official Agency Record" it w will be released to the Public.

OFFICE RI/DRS/OB RI/DRS/OB NAME TFish/SLH for SHansell/SLH DATE 06125111 06125111 OFFICIAL RECORD COPY

T. Joyce 3 DISTRIBUTION: (Via E-mail)

W. Dean, RA (RIORAMAIL Resource)

D. Lew, DRA (RIORAMAIL Resource)

D. Roberts, DRP (RIDRPMAIL Resource)

J. Clifford, DRP (RIDRPMAlL Resource)

C. Miller, DRS (RlDRSMail Resource)

P. Wilson, DRS (RlDRSMail Resource)

A. Burritt, DRP L. Cline, DRP A. Turilin, DRP C. Douglas, DRP D. Schroeder, DRP, SRI P. McKenna, DRP, Rl K. McKenzie, DRP, OA S. Bush-Goddard, Rl OEDO D. Bearde, DRS RidsNrrPMSalem Resource Rid sN rrDorlLpll -2 Resou rce T. Fish, DRS Examiner, DRS L. Vick, N RRiADRO/Dl RS/IOLB DRS Operations Branch Chief C. Bixler, DRS (OL Facility File)