ML11175A143
ML11175A143 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 04/15/2011 |
From: | Mcneil D NRC/RGN-III/DRS/OLB |
To: | Florida Power & Light Energy Point Beach |
References | |
Download: ML11175A143 (28) | |
Text
Point Beach Nuclear Plant Job Performance Measure (JPM)
SITE: Point Beach JPM TITLE: Fast Start an Emergency Diesel Generator JPM NUMBER: In-Plant JPM i REV. 3 RELATED PRA None INFORMATION:
TASK NUMBERS / PBN P000.039.AOT / Fast Start an Emergency Diesel Generator TASK TITLE(S):
K/A NUMBERS: 064 A4.01 (4.0/4.3)
APPLICABLE METHOD OF TESTING:
Discussion: Simulate/walkthrough: X Perform:
EVALUATION LOCATION: In-Plant: X Control Room:
Simulator: Other:
Lab:
Time for Completion: 20 Minutes Time Critical: No Alternate Path: Yes Page 1 of 12
Point Beach Nuclear Plant In-Plant JPM i I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- You are the Unit 2 Turbine Hall AO
- A loss of all AC power has occurred on Unit 2.
- Emergency diesel generator G-01 failed to auto start and cannot be started from the Control Room.
INITIATING CUES:
- The SRO directs you to perform ECA-0.0 Unit 2, Loss of All AC Power, Attachment A, G-01 Local Manual Start, Steps A2 through A8. Key 43 has been obtained.
Page 2 of 12
Point Beach Nuclear Plant In-Plant JPM i JPM PERFORMANCE INFORMATION Required Materials: ECA-0.0 Unit 2, Loss of All AC Power, Attachment A.
General
References:
ECA-0.0 Unit 2, Loss of All AC Power, Attachment A.
Task Standards: Emergency diesel generator G-01 is started and bus 2A-05 is energized in accordance with ECA-0.0 Unit 2, Loss of All AC Power Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number.
Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1 A2. Check Green POWER ON Light - LIT Critical N
- Panel C-64A
- Panel C-34 Standard:
- The Examinee checks panel C-64A and C-34 and determines Green Power On lights are lit.
Evaluator Cue: Green Power ON lights are lit.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 3 of 12
Point Beach Nuclear Plant In-Plant JPM i Performance Step: 2 A3. Check Overspeed Trip Alarms - CLEAR Critical N
- Panel C-64A
- Panel C-34 Standard: The Examinee checks Panels C-64A and C-34 for Overspeed Trip Alarms
- CLEAR.
Evaluator Cue: Overspeed trip alarms are CLEAR.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 3 A4. Emergency Start G-01:
Critical Y a. At C-34A, place local/remote transfer switches to LOCAL
- Transfer switch No. 1
- Transfer switch No. 2 Standard: The Examinee manipulates the local/remote switches at C-34A to the LOCAL position.
Evaluator Note: The REMOTE light goes off after a switch goes to local, the LOCAL light will come on after BOTH switches go to local.
Evaluator Cue:
- The local/remote switches at C-34A are in LOCAL.
- Local control light on C-34A is LIT, Remote Control light is off.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 4 of 12
Point Beach Nuclear Plant In-Plant JPM i Performance Step: 4 b. At C - 34A, start G-01 by depressing EMERGENCY START Critical N pushbutton.
Standard: The Examinee depresses emergency start pushbutton.
Evaluator Cue:
- The EMERGENCY START pushbutton at C-34A has been depressed.
- The emergency diesel generator G-01 tachometer reads zero.
- There is no audible noise from the emergency diesel generator G-01.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 5 b. RNO IF G-01 will NOT emergency start, then manually start G-01.
Critical Y 1) At C-64, place mode selector switch in LOCAL START.
Standard: The Examinee turns C-64 mode selector switch to Local Start.
Evaluator Cue: C-64 mode selector switch is in Local Start.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 5 of 12
Point Beach Nuclear Plant In-Plant JPM i Performance Step: 6 2) At C-64, depress and hold ENGINE START pushbutton until Critical Y engine speed rises to idle.
Standard: The Examinee depresses Engine Start pushbutton until engine starts and reaches idle speed.
Evaluator Cue:
- G-01 noise level increases dramatically.
- G-01 Tachometer is reading ~450 RPM and stable (when checked)
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 7 3) At C-64, raise engine speed to 900 rpm by depressing IDLE Critical Y RELEASE pushbutton.
Standard: The Examinee depresses the Idle release pushbutton at C-64.
Evaluator Cue:
- The IDLE RELEASE pushbutton at C-64 has been depressed.
- The emergency diesel generator G-01 tachometer reads 900 RPM and stable (if checked).
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 8 A5. At C-64, Check G-01 Speed - GREATER THAN OR EQUAL TO 900 Critical N RPM Standard: The Examinee checks engine speed at or above 900 RPM.
Evaluator Cue: Engine speed is 900 RPM and stable.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 6 of 12
Point Beach Nuclear Plant In-Plant JPM i Performance Step: 9 A6. Contact Control Room To Check G-01 Frequency - BETWEEN 59.7 Critical N AND 60.3 HZ.
Standard: The Examinee contacts Control and requests G-01 frequency.
Evaluator Cue: Control Room reports G-01 Frequency indicates 60.0 HZ and stable.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 10 A7. Contact Control Room To Check G-01 Voltage - BETWEEN 4050 Critical N AND 4300 VAC.
Standard: The Examinee contacts Control and requests G-01 Voltage.
Evaluator Cue: Control Room reports G-01 Voltage indicates 4200 VAC and stable.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 7 of 12
Point Beach Nuclear Plant In-Plant JPM i Performance Step: 11 A8. Energize Bus 2A-05 From Alternate Supply G-01:
Critical N a. Check G RUNNING Standard: The Examinee checks that G-01 is running.
Evaluator Note: The Examinee may rely on completion of previous steps (i.e. Voltage and Frequency checks from Control) to determine that G-01 is indeed running.
Evaluator Cue:
- G-01 Tachometer indicates 900 RPM locally (if checked).
- G-01 Frequency and Voltage are satisfactory (if asked).
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 12 b. In VSG room, ensure 2A-03 to 2A-05 bus tie breaker - OPEN Critical N
- 2A52-76 Evaluator Cue:
- Green light is on, red light is off for 2A52-76 Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 8 of 12
Point Beach Nuclear Plant In-Plant JPM i Performance Step: 13 c. At C-35A, ensure G-02 to 2A-05 bus tie breaker control switch -
Critical N OPEN AND IN PULL-OUT.
Evaluator Cue: 2A52-67 is in Pull Out, both lights are off (after switch is turned and pulled out).
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 14 d. At C34A, unlock and place G-01 to bus 2A-05 breaker control Critical Y switch in AUTO.
Evaluator Note: Critical action is unlocking the breaker control switch.
Evaluator Cue: 2A52-73 is unlocked and pushed in to AUTO, green light is ON, red light is OFF.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 9 of 12
Point Beach Nuclear Plant In-Plant JPM i Performance Step: 15 e. At C34A, check G-01 to bus 2A-05 breaker - CLOSED.
Critical N
Evaluator Cue: Green light on, red light off for 2A52-73.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 16 e. RNO Locally perform the following:
Critical N 1) Try to auto-close breaker by placing control switch to trip position then release.
Standard: The Examinee places breaker switch to trip, then release.
Evaluator Cue: Green light on, red light off (after taking switch to trip and release).
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 17 2) IF breaker will NOT auto-close, THEN manually close breaker Critical Y control switch.
Standard: The Examinee places 2A52-73 switch to close.
Evaluator Cue: Red light on, green light off (after taking switch to close and release).
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 10 of 12
Point Beach Nuclear Plant In-Plant JPM i Performance Step: 18 Inform the Control Room that ECA-0.0 Unit 2, Loss of All AC Power, Critical N Attachment A, G-01 Local Manual Start, Steps A2 through A8 have been completed and emergency diesel generator G-01 is running and the output breaker is closed on to bus 2A-05.
Standard: The Examinee informs the Control Room that ECA-0.0 Unit 2, Loss of All AC Power, Attachment A, G-01 Local Manual Start, Steps A2 through A8 have been completed and emergency diesel generator G-01 is running and the output breaker is closed on to bus 2A-05.
Evaluator Cue: The Control Room acknowledges your report.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues: The evolution is complete.
Stop Time:
Page 11 of 12
Point Beach Nuclear Plant In-Plant JPM i TURNOVER SHEET INITIAL CONDITIONS:
- You are the Unit 2 Turbine Hall AO
- A loss of all AC power has occurred on Unit 2.
- Emergency diesel generator G-01 failed to auto start and cannot be started from the Control Room.
INITIATING CUES:
- The SRO directs you to perform ECA-0.0 Unit 2, Loss of All AC Power, Attachment A, G-01 Local Manual Start, Steps A2 through A8. Key 43 has been obtained.
Page 12 of 12
Point Beach Nuclear Plant Job Performance Measure (JPM)
SITE: Point Beach JPM TITLE: Lineup for Transfer to Containment Sump Post-Accident Recirculation JPM NUMBER: IP JPM j. REV. 0 RELATED PRA HEP-RHR-EOP 13-23, Operator Fails to Align for Low Head Recirc INFORMATION:
TASK NUMBERS / PBN P000.042.AOT / Lineup for Transfer to Containment Sump Post-TASK TITLE(S): Accident Recirculation K/A NUMBERS: 011.EK3.08 (3.9/4.1) 011.EA1.11 (4.2/4.2)
APPLICABLE METHOD OF TESTING:
Discussion: Simulate/walkthrough: X Perform:
Time for Completion: 20 Minutes Time Critical: NO Alternate Path: YES Page 1 of 7
Point Beach Nuclear Plant In-Plant JPM j I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- A Loss of Reactor Coolant (LOCA) accident has occurred on Unit 2 and RWST level is less than 60%.
- You are assisting the Unit 2 Control Operator to transfer to containment sump recirculation.
INITIATING CUES:
- The Unit 2 Control Operator directs you to perform EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", ATTACHMENT A, "Local Alignment of Component Cooling Water".
Instructor Note:
The normal flow of this alternate path JPM is that the student will determine the abnormal CCW system alignment during the JPM when cued at step A1 or A3.
IF the student asks for the CCW alignment now, that information is earned and can be given at this time:
- CCW Heat Exchanger status:
- HX-12C OOS / isolated (danger tagged) for tube cleaning
- HX-12B and 1HX-12A are aligned to Unit 1 Page 2 of 7
Point Beach Nuclear Plant In-Plant JPM j JPM PERFORMANCE INFORMATION Required Materials: EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection" General
References:
EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection" Task Standards: Local actions for establishing containment sump recirculation in accordance with EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", are completed.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number.
Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1 A1 Verify Unit 2 Component Cooling Heat Exchanger Alignment:
Critical N a. ENSURE component cooling heat exchangers - AT LEAST ONE ALIGNED TO UNIT 2
- HX-12C
- HX-12C
- 2HX-12D and goes to Step A3 Evaluator Note: If the CCW HX status was provided at student request during the turnover, then it may not be necessary to provide it at this time.
Evaluator Cue:
- HX-12C OOS / isolated (danger tagged) for tube cleaning
- HX-12B and 1HX-12A aligned to Unit 1 Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 3 of 7
Point Beach Nuclear Plant In-Plant JPM j Performance Step: 2 A3 Adjust Service Water Flow:
Critical Y a. Check component cooling heat exchangers - AT LEAST TWO ALIGNED
- a. RNO IF only one component cooling heat exchanger is aligned to Unit 2, THEN perform the following:
- 1) Establish 3 psid service water to aligned heat exchanger o 2SW-307, 2DPIS-4445 for 2HX-12D
- 2) Go to Step A4 Standard: Examinee throttles 2SW-307 to establish 3 psid service water as read on 2DPIS-4445 for 2HX-12D and goes to Step A4 Evaluator Note: 2HX-12D is the only heat exchanger aligned to Unit 2. HX-12C is OOS.
Evaluator Cue: 2SW-307 is throttled open. 3 psid service water is indicated on 2DPIS-4445 for 2HX-12D Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 3 A4 Check and Record Waste Holdup Tank Level Critical N
- T-19 Standard: Examinee records Waste Holdup Tank Level Evaluator Cue: Use normal level indication (as shown on LI-1001, WHUT Level)
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 4 of 7
Point Beach Nuclear Plant In-Plant JPM j Performance Step: 4 A5 At 8 elevation outside Unit 2 MDAFW Pump Area:
Critical Y a. Shut bypass loop inlet stop valve.
- b. Shut bypass test line inlet valve
- 2CC-748A Standard: Examinee shuts 2CC-744A and 2CC-748A Evaluator Cue: a. 2CC-744A valve handwheel is rotated fully clockwise and the valve stem is fully inserted
- b. 2CC-748A valve handwheel is rotated fully clockwise and the valve stem is fully inserted Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 5 A6 At 8' Elevation In Walkway To Pipeway #3, Locally Shut Non-Regen Critical Y Heat Exchanger Shell Side Inlet
- 2CC-740A Standard: Examinee Shuts 2CC-740A, Non-Regen Heat Exchanger Shell Side Inlet Evaluator Cue: Valve handwheel is rotated fully clockwise and the valve stem is fully inserted Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 5 of 7
Point Beach Nuclear Plant In-Plant JPM j Performance Step: 6 A7 At 8' Elevation In Seal Water Return Filter Cubicle, Locally Shut HX-5 Critical Y Seal Water Return HX Shell Side Inlet Valve
- 2CC-750A Standard: Examinee Shuts 2CC-750A, HX-5 Seal Water Return HX Shell Side Inlet Valve Evaluator Note: 2CC-750A is in a HRA, DO NOT ENTER. Have examinee locate valve on survey map for unit 2 Seal Water Return Filter Cubicle Evaluator Cue: Valve handwheel is rotated fully clockwise and the valve stem is fully inserted Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 7 A8 Notify Control Room Of Component Cooling Water Alignment Critical N Standard: Examinee notifies Control Room of CCW alignment Evaluator Cue: The Control Room acknowledges your report Performance: SATISFACTORY _____ UNSATISFACTORY ______
Comments:
Terminating Cues: THIS COMPLETES THIS JPM.
Stop Time:
Page 6 of 7
Point Beach Nuclear Plant In-Plant JPM j TURNOVER SHEET INITIAL CONDITIONS:
- A Loss of Reactor Coolant (LOCA) accident has occurred on Unit 2 and RWST level is less than 60%.
- You are assisting the Unit 2 Control Operator to transfer to containment sump recirculation.
INITIATING CUES:
- The Unit 2 Control Operator directs you to perform EOP 1.3, Unit 2, "Transfer to Containment Sump Recirculation Low Head Injection", ATTACHMENT A, "Local Alignment of Component Cooling Water".
Page 7 of 7
Point Beach Nuclear Plant Job Performance Measure (JPM)
SITE: Point Beach JPM TITLE: Provide Bearing Cooling to TDAFWP During a Loss of All AC Power JPM NUMBER: In-Plant JPM k REV. 5 RELATED PRA None INFORMATION:
TASK NUMBERS / PBN P000.022.AOT / Provide Bearing Cooling To TDAFWP During a Loss TASK TITLE(S): of All AC Power K/A NUMBERS: 2.4.34 (4.2/4.1)
APPLICABLE METHOD OF TESTING:
Discussion: Simulate/walkthrough: X Perform:
EVALUATION LOCATION: In-Plant: X Control Room:
Simulator: Other:
Lab:
Time for Completion: 30 Minutes Time Critical: No Alternate Path: Yes Page 1 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
In-Plant JPM k I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- You are the Unit 1 Control Operator.
- A fire has occurred in PAB 26 Central which has caused loss of plant control from the control room.
- AOP-10C, Safe Shutdown Following Fire at PAB 26, is in progress. Attachment C has been completed through step C10.
INITIATING CUES:
- You are to continue with the performance of Attachment C, Step C11 Page 2 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
In-Plant JPM k JPM PERFORMANCE INFORMATION Required Materials: 1. AOP-10C, Safe Shutdown Following Fire at PAB 26 Central, Attachment C
- 2. Diesel Fire Pump Local operator aid.
General
References:
- 1. AOP-10C, Safe Shutdown Following Fire at PAB 26 Central, Attachment C
- 2. Diesel Fire Pump Local operator aid.
Task Standards: 1. The Examinee properly starts diesel driven fire pump to provide bearing cooling to the Steam Driven AFW pumps.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number.
Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1 C11. In AFW Room, Place Turbine-Driven AFW Pumps in Service:
Critical Y a. Open the associated service water suction.
- 2AF-4006 for 2P-29 Standard: Examinee declutches and opens 1AF-4006 and 2AF-4006 Evaluator Cue: 1AF-4006 handwheel stops turning, stem is extended.
2AF-4006 handwheel stops turning, stem is extended.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 3 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
In-Plant JPM k Performance Step: 2 b. Check BOTH turbine-driven AFW pump suction pressures -
Critical N GREATER THAN 7.5 PSIG
- 2PI-4013-B Standard: Examinee checks adequate suction pressure Evaluator Cue: 1PI-4013-B reads 9 PSIG.
2PI-4013-B reads 9 PSIG.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 3 c. Check service water pressure to turbine-driven AFW pumps -
Critical Y GREATER THAN 10 PSIG.
- PI-4364 Standard: Examinee checks SW pressure to AFW pumps and performs RNO actions Evaluator Note: Examinee should realize that SW pressure is inadequate to supply bearing cooling to TDAFW pumps and perform RNO of step 11.c.
Evaluator Cue: PI-4364 reads 8 PSIG.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 4 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
In-Plant JPM k Performance Step: 4 c. RNO Locally start P35B diesel fire pump per local instructions.
Critical N Standard: Examinee proceeds to CW pump house to start P35B.
Evaluator Note: Bearing cooling is aligned earlier in Attachment C and is completed with the start of P35B diesel fire pump.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 5 Manually override the fuel shut off valve - turn knurled knob fully Critical Y clockwise.
Standard: The Examinee overrides the fuel shut off valve for the diesel driven fire pump, P-35B by turning the knurled knob fully clockwise (as viewed from the knob end of the valve).
Evaluator Note:
- The knurled knob is part of the fuel shut off valve assembly, located on the east side of the diesel and is painted orange.
- If the Examinee indicates that he is overriding the fuel shut off valve by turning the black fluted knob (engine rpm adjust),
provide the following cue:
- The knob does not turn.
Evaluator Cue: The knurled knob is rotated fully clockwise for the diesel driven fire pump, P-35B fuel shut off valve.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 5 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
In-Plant JPM k Performance Step: 6 Manually operate either starter solenoid joystick and start the diesel Critical Y driven fire pump, P-35B.
Standard: The Examinee positions either starter solenoid joystick to start the diesel driven fire pump, P-35B.
Evaluator Note:
- If the Examinee had repositioned the engine rpm adjust (rather than the fuel shutoff valve override), then provide the following cue:
- The diesel driven fire pump, P-35B turns over but does not start.
Evaluator Cue:
- One or the other starter solenoid joysticks is position to the left to start the diesel driven fire pump, P-35B.
- The diesel driven fire pump, P-35B turns over and starts.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 7 Inform the Control Room that the diesel driven fire pump, P-35B has Critical N been started using the emergency start plaque , the fuel shut off valve is mechanically maintained in the open position.
Standard: The Examinee informs the Control Room that the diesel driven fire pump, P-35B has been started using the emergency start plaque, the fuel shut off valve is mechanically maintained in the open position.
Evaluator Cue: The Control Room acknowledges your report.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 6 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
In-Plant JPM k Performance Step: 8 C11 Critical N d. Ensure 1P-29 discharge to B S/G - 10% OPEN
Evaluator Note: Examinee may check cooling water supply pressure on gauge 1PI-4458. If checked, pressure is 15 PSIG. (Service water pressure on PI-4364 still reads 8 PSIG.)
Evaluator Cue: * (prior to closing down on valve) Indicator on 1AF-4000 reads as recorded on wall plaque.
- (after examinee declutches valve and turns handwheel clockwise)
Indicator on 1AF-4000 reads 10%.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 9 e. Shut 1P-29 discharge to A S/G Critical N
- 1AF-4001 Standard: Examinee shuts 1AF-4001 Evaluator Cue: 1AF-4001 handwheel stops turning, indicator reads 0%
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 7 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
In-Plant JPM k Performance Step: 10 f. Ensure 2P-29 discharge to B S/G - 10% OPEN Critical N
Evaluator Note: Examinee may check cooling water supply pressure on gauge 2PI-4458. If checked, pressure is 15 PSIG. (Service water pressure on PI-4364 still reads 8 PSIG.)
Evaluator Cue: * (prior to closing down on valve) Indicator on 2AF-4000 reads as recorded on wall plaque.
- (after examinee declutches valve and turns handwheel clockwise)
Indicator on 2AF-4000 reads 10%.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 11 g. Shut 2P-29 discharge to A S/G Critical N
- 2AF-4001 Standard: Examinee shuts 2AF-4001 Evaluator Cue: 2AF-4001 handwheel stops turning, indicator reads 0%
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Terminating Cues:
Stop Time:
Page 8 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
In-Plant JPM k TURNOVER SHEET INITIAL CONDITIONS:
- You are the Unit 1 Control Operator.
- A fire has occurred in PAB 26 Central which has caused loss of plant control from the control room.
- AOP-10C, Safe Shutdown Following Fire at PAB 26, is in progress. Attachment C has been completed through step C10.
INITIATING CUES (IF APPLICABLE):
- You are to continue with the performance of Attachment C, Step C11 Page 9 of 9