ML111751681

From kanterella
Jump to navigation Jump to search
Operator Examination Data
ML111751681
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 06/24/2011
From: Patricia Anderson
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-XE-11-009, RIS 2011-08
Download: ML111751681 (4)


Text

@ Xcel Energy June 24,201 1 414 Nicollet Mall - MP4 Minneapolis, MN 55401 L-XE-11-009 RIS 201 1-08 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant, Monticello Nuclear Generating Plant Units 1 and 2 Docket 50-263 Dockets 50-282, 50-306 Renewed License No. DPR-22 License Nos. DPR-42 and DPR-60 Operator Examination Data As requested by NRC Regulatory Issue Summary 201 1-08, "Preparation and Scheduling of Operator Licensing Examinations", dated May 25, 201 1, Northern States Power Company, a Minnesota corporation, hereby submits the operator licensing examination data for calendar years 2013 through 2016 for the Monticello Nuclear Generating Plant and Prairie lsland Nuclear Generating Plant. Enclosed are the corresponding NRC Form 536s for each site which provide the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

Requlatorv Commitments akes no new commitments or changes to any existing commitments.

Paula K. Anderson Director, Nuclear Licensing and Regulatory Affairs Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Prairie lsland Nuclear Generating Plant, USNRC, NRR Resident Inspector, Prairie lsland Nuclear Generating Plant, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC, NRR Resident Inspector, Monticello Nuclear Generating Plant, USNRC

ENCLOSURE Operator Licensing Examination Data for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 2 pages follow

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch IT-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-000, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Monticello Nuclear Generating Plant 3

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 Cy 2014 Cy 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 1

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS

8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY2014 CY 2015 Cy2016 NUMBER OF REACTOR OPERATORS 6

6 6

NUMBER OF SENIOR REACTOR 6

7 5

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 1

1 1

OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 0111312013 1110912014 11107/2016 ALTERNATE DATE 01106/2013 11/0212014 10/3112016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2013 CY 2014 PROPOSED

~~-

~~-

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currenHy valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Prairie Island Nuclear Generating Plant Unit 1 and 2 3

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 Cy 2014 CY 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 Cy2014 CY2015 Cy2016 NUMBER OF REACTOR OPERATORS 6

6 NUMBER OF SENIOR REACTOR 4

4 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/05/2014 12/05/2016 ALTERNATE DATE 08112/2014 12/12/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2013 Cy 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER