ML111680253

From kanterella
Jump to navigation Jump to search
2011 Point Beach Nuclear Plant Initial Examination Outline Submittal
ML111680253
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/25/2011
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML11105A144 List:
References
Download: ML111680253 (2)


Text

2011 POINT BEACH NUCLEAR PLANT INITIAL EXAMINATION OUTLINE SUBMITTAL

ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Point Beach Nuclear Power Plant Date of Examination: 04/25/2011 Initials Item Task Description a I b

  • I c#
1. a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401.

W R

I

b. Assess whether the outline was systematically and randomly prepared in accordance with Section D.l of ES-401 and whether all WA categories are appropriately sampled. w-T c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics. tL563Ik T

E N

2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of S

normal evolutions, instrument and component failures, technical specifications, and major transients.

I% Fa I

b. Assess whether there are enough scenario sets (and spares) to test the projected number and M mix of applicants in accordance with the expected crew composition and rotation schedule U

L without compromising exam integrity, and ensure that each applicant can be tested using at &p ed!

least one new or significantly modified scenario, that no scenarios are duplicated from the A

applicants audit test(s), and that scenarios will not be repeated on subsequent days.

T 0

R Pi-

3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks W distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants audit test@)

(4) the number of new or modified tasks meets or exceeds the minimums specified on the form

( 5 ) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:

(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.

4.

w G

E N

E R

A L

Printed NarnelSianature Date

a. Author
b. Facility Reviewer (*)
c. NRC Chief Examiner (#)
d. d. NRCSupervisor

~ ~~~~~ ~

Note # Independent NRC reviewer initial items in Column c, chief examiner concurrence required