ML111680195

From kanterella
Jump to navigation Jump to search
2011 Point Beach Nuclear Plant Initial Examination Administrative Files
ML111680195
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/25/2011
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Florida Power & Light Energy Point Beach
Shared Package
ML11105A149 List:
References
NRC 2011-0053
Download: ML111680195 (12)


Text

201I POINT BEACH NUCLEAR PLANT INITIAL EXAMINATION ADMINISTRATIVE FILES

Point Beach Nuclear Plant Master Security Agreement The Master Security Agreement is used for those personnel having both knowledge of Exam Sensitive Material and unrestricted access to Primary and Secondary Containment.

1. Pre-Examination (Review FP-T-SAT-71, Attachment 1 for pre-job briefing requirements)

I acknowledge that I have acquired specialized knowledge about the PBNP 201 1 ILT NRC examination(s) scheduled for the date(s) of 4/25/2011 - 5/5/2011 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by an Operations Training Supervisor. I understand that I am not to instruct or provide performance feedback to those individuals scheduled to be administered these examinations from this date until completion of examination administration. I also understand that I am not to evaluate individuals scheduled to be administered these examinations from this date until the date of administration. Acting as a simulator booth operator or communicator is acceptable if I do not select the training content or provide direct or indirect feedback to an examinee. Furthermore, I am aware of the physical security measures and requirements (as documented in procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations andlor an enforcement action against my facility or me. I will immediately report to the Exam Project Manager any indications or suggestions that examination security may have been compromised.

2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the examinations administered during the date(s) of __4/25/2011- 5/5/2011 . From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those individuals who were administered these examinations.

Retention: Life of Plant Retain in: Exam File QF- 107 1-0I

-\

Revision I 05/12/08 Page 1 o f 2

Reference:

FP-T-SAT-71

Point Beach Nuclear Plant Master Security Agreement The Master Security Agreement is used for those personnel having both knowledge of Exam Sensitive Material and unrestricted access to Primary and Secondary Containment.

JOB TITLE /

PRINTED NAME DATE NOTE QF- 107 1-01 Revision I 05/12/08 Page 2 of 2

Reference:

FP-T-SAT-7 1

Point Beach Nuclear Plant Master Security Agreement The Master Security Agreement is used for those personnel having both knowledge of Exam Sensitive Material and unrestricted access to Primary and Secondary Containment.

PRINTED NAME v2$' JOB TITLE /

I b a.

176. IY, I ,"-.-

I g;l.

17 $

9.

10.

11.

12.

13.

14.

15.

NOTES:

Retention: Life of Plant Retain in: Exam File QF- I07 1-0 1 Revision I 05/12/08 Page 2 of 2

Reference:

FP-T-SAT-71

l5 Point Beach Nuclear Plant Limited Security Agreement The Limited Security Agreement is used for those personnel having limited knowledge of Exam Sensitive Material but do not have unrestricted access to Primary and Secondary Containment.

Pre-Examination (Review FP-T-SAT-71,Attachment A for pre-job briefing requirements)

I acknowledge that I have acquired specialized knowledge about the PBNP 201 1 ILT NRC examination scheduled for the date(s) of 4/25/2011 -

5/5/2011 as of the date of my signature. I agree that I will not knowingly divulge any information about this examination to any persons who have not been authorized by an Operations Training Supervisor. I understand that I am not to instruct or provide performance feedback to those individuals scheduled to be administered these examinations from this date until completion of examination administration. I also understand that I am not to evaluate individuals scheduled to be administered these examinations from this date until the date of administration. Acting as a simulator booth operator or communicator is acceptable if I do not select the training content or provide direct or indirect feedback to an examinee. Furthermore, I am aware of the physical security measures and requirements (as documented in procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examination and/or an enforcement action against my facility or me. I will inmediately report to the Exam Project Manager any indications or suggestions that examination security may have been compromised.

Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the examination administered during the date(s) of 4/25/2011 - 5/5/2011 . From the date that I entered into this security agreement until the completion of this examination administration, I did not instruct, evaluate, or provide performance feedback to those individuals who were administered this examination.

Furthermore, I agree to NOT discuss any aspects associated with the contents of this examination with ANY examinee until the completion of their examination administration. I further understand that violation of the conditions of this agreement may result in cancellation of the examination and/or enforcement action against the facility licensee or me.

JOB TITLE / RESPONSIBILITY SIGNATUFEJ 1) DATE SIGNATURE (2) DATE NOTE Retention: Life of plant I file a f k U Retain in: Exam Form retained in accordance with record retention schedule identified in NP 1.3.1 QF- I07 1-02 Revision 2 05/12/08 Page 1 of 2

Reference:

FP-T-SAT-7I

c I

Point Beach Nuclear Plant Limited Security Agreement The Limited Security Agreement is used for those personnel having limited knowledge of Exam Sensitive Material but do not have unrestricted access to Primary and Secondary Containment.

Retention: Life of plant Retain in: Exam file Form retained in accordance with record retention schedule identified in NP 1.3.I .

QF-1071-02 Revision 2 05/12/08 Page 2 of 2

Reference:

FP-T-SAT-7 1

. 1

.. Point Beach Nuclear Plant Limited Security Agreement The Limited Security Agreement is used for those personnel having limited knowledge of Exam Sensitive Material but do not have unrestricted access to Primary and Secondary Containment.

JOB TITLE / RESPONSIBILITY NOTE PO 11.

/ I 2 4A 'Id/

12.

13.

14.

15.

Retention: Life of plant Retain in: Exam file Form retained in accordance with record retention schedule identified in NP 1.3.1 QF- I07 1-02 Revision 2 05/12/08 Page 2 of 2

Reference:

FP-T-SAT-7I

Point Beach Nuclear Plant Limited Security Agreement The Limited Security Agreement is used for those personnel having limited knowledge of Exam Sensitive Material but do not have unrestricted access to Primary and Secondary Containment.

1. Pre-Examination (Review FP-T-SAT-71,Attachment A for pre-job briefing requirements) 1 acknowledge that I have acquired specialized knowledge about the PBNP 201 1 ILT NRC examination scheduled for the date(s) of 4/25/2011 -

5/5/2011 as of the date of my signature. I agree that I will not knowingly divulge any information about this examination to any persons who have not been authorized by an Operations Training Supervisor. I understand that I am not to instruct or provide performance feedback to those individuals scheduled to be administered these examinations from this date until completion of examination administration. I also understand that I am not to evaluate individuals scheduled to be administered these examinations from this date until the date of administration. Acting as a simulator booth operator or communicator is acceptable if I do not select the training content or provide direct or indirect feedback to an examinee. Furthermore, I am aware of the physical security measures and requirements (as documented in procedures) and understand that violation of the conditions of this agreement may result i n cancellation of the examination andor an enforcement action against my facility or me. I will immediately report to the Exam Project Manager any indications or suggestions that examination security may have been compromised.

2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the examination administered during the date(s) of 4/25/2011 - 5/5/2011 . From the date that I entered into this security agreement until the completion of this examination administration, I did not instruct, evaluate, or provide performance feedback to those individuals who were administered this examination.

Furthermore, I agree to NOT discuss any aspects associated with the contents of this examination with ANY examinee until the completion of their examination administration. I further understand that violation of the conditions of this agreement may result in cancellation of the examination andor enforcement action against the facility licensee or me.

1.

2.

3.

4.

5.

file Retention: Life of plant 4 & j s;,.,,,cbetain in. E x a m QF- 107 1-02 Revision 2 05/12/08

Reference:

FP-T-SAT-7I

ES-403 Written Examination Grading Form ES-403-1 Quality Checklist Facility: Date of Exam: 5/4/11 Exam Level: RO X SRO X Initials Item Description

1. Clean answer sheets copied before grading
2. Answer key changes and question deletions justified and documented
3. Applicants' scores checked for addition errors (reviewers spot check > 25% of examinations)

I V I

4. Grading for all borderline cases (80 & O h overall and 70 or 80, as applicable, &4% on the SRO-only) reviewed in detail
5. All other failing examinations checked to ensure that grades are justified
6. Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants Printed Name/Signature Date
c. NRC Chief Examiner (*
d. NRC Supervisor (*)

(*) The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.

POINT BEACH 10 CFR 55.40 NRC 201 1-0053 May IO, 201 1 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Initial Operator and Senior Operator License Examinations Written Examination Results Operator and Senior Operator License written examinations were conducted at Point Beach Nuclear Plant (PBNP) on May 4, 201 1.

Enclosed are the following examination-related materials:

One (1) form ES-403-1 Written Examination Grading Quality Checklist Student seating chart Two (2) forms ES-401-7 site-specific Reactor Operator written examination cover sheets Two (2) RO exam original answer forms, clean photocopies and graded photocopies Eight (8) forms ES-401-8 site-specific Senior Reactor Operator written examination cover sheets Eight (8) RO exam original answer forms, clean photocopies and graded photocopies Eight (8) SRO exam original answer forms, clean photocopies and graded photocopies Candidate questions during written exam administration and proctor responses Exam score statistics Question analysis for questions with 550% pass rate Significant question changes based on post-exam review with candidates, with references Copies of procedure change requests and Conditi6n Report CROl645119, which was discussed at exit meeting on May 3, 201 1 One (1) Completed Examination Security Agreement

" g NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 542d1 MAY 1 ft 2011

Regional Administrator, Region Ill Page 2 NextEra is submitting post-exam comments on Questions #84 and #89. It is our recommendation that Question #84 be corrected to accept both B and D as correct answers; and that Question #89 be corrected to accept both C and D as the correct answers.

Very truly yours, NextEra Energy Point Beach, LLC Larry Meyer Site Vice President Enclosures

f . -. ..