ML11153A124
| ML11153A124 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/01/2011 |
| From: | Hironori Peterson Operations Branch III |
| To: | Meyer L Point Beach |
| References | |
| Download: ML11153A124 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1, 2011 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
Dear Mr. Meyer:
We have received your letter dated July 20, 2010 (NRC 2010-0115). In that letter, you requested the initial operator licensing examinations scheduled for May of 2012 and May 2013 be cancelled. You also requested scheduling of initial operator licensing examinations for December 2012, November 2013, and for October 2014.
In response, we have cancelled the May 2012 and May 2013 initial operator licensing examinations. We have also scheduled an initial operator licensing examination for the weeks of December 3 and 10, 2012, with an onsite validation date of November 12, 2012. We have scheduled an initial operator licensing examination for the weeks of November 18 and 25, 2013, with an onsite validation date of October 28, 2013. Additionally, we have scheduled an initial operator licensing examination for the weeks of November 3 and November 10, 2014, with an onsite validation date of the week of October 13, 2014.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of applicants decline below ten for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.
L. Meyer In accordance with 10 CFR 2.930 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by D. McNeil for/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc:
Distribution via ListServ
L. Meyer In accordance with 10 CFR 2.930 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by D. McNeil for/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc:
Distribution via ListServ DISTRIBUTION:
Daniel Merzke RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Steven West Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak Document Name: G:\\DRSIII\\DRS\\Work in Progress\\OL Exam Confirmation Letters\\POI 060111 DRS OL Re Confirmation of Exam.docx 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII N
NAME RKWalton:co HPeterson DM for DATE 05/13/11 06/01/11 OFFICIAL RECORD COPY