ML11153A108
| ML11153A108 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 06/01/2011 |
| From: | Hironori Peterson Operations Branch III |
| To: | Schimmel M Northern States Power Co |
| References | |
| Download: ML11153A108 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1, 2011 Mr. Mark A. Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2
Dear Mr. Schimmel:
We have received a letter from Xcel Energy dated July 26, 2010 (L-XE-10-008). In that letter, Xcel Energy requested an initial operator licensing examination be scheduled for Prairie Island Nuclear Generating Plant for August of 2014.
In response, we have scheduled an initial operator licensing examination for the weeks of August 4 and 11, 2014, with an onsite validation date the week of July 14, 2014, for Prairie Island Nuclear Generating Plant. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of applicants decline below ten for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
We note that you were previously scheduled for an initial operator licensing examination for the weeks of May 14 and 21, 2012. This examination will be written by the NRC in accordance with NUREG 1021, Revision 9, Supplement 1. However, to prevent a schedule conflict, the onsite validation week has been changed from April 23, 2012, to April 16, 2012.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.
M. Schimmel In accordance with 10 CFR 2.930 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by D. McNeil for/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos; 50-282; 50-306; License Nos; DPR-42; DPR-60; cc:
Distribution via ListServ
M. Schimmel In accordance with 10 CFR 2.930 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by D. McNeil for/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos; 50-282; 50-306; License Nos; DPR-42; DPR-60; cc:
Distribution via ListServ DISTRIBUTION:
Daniel Merzke RidsNrrPMPrairieIsland RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Steven West Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak Document Name: G:\\DRSIII\\DRS\\Work in Progress\\OL Exam Confirmation Letters\\PRA 060111 DRS OL Re Confirmation of Exam.docx 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII N
NAME RKWalton:co HPeterson DM for DATE 05/13/11 06/01/11 OFFICIAL RECORD COPY