ML11153A003
| ML11153A003 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 06/16/2011 |
| From: | Martin R Plant Licensing Branch II |
| To: | Gatlin T South Carolina Electric & Gas Co |
| Martin R, DORL/LPLII-1, 415-1493 | |
| Shared Package | |
| ML11153A002 | List: |
| References | |
| Download: ML11153A003 (2) | |
Text
OFFICIAL USE ONLY SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 16, 2011 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88 Jenkinsville, SC 29065 SUB..IECT:
VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 - DAM SAFETY INSPECTION REPORT
Dear Mr. Gatlin:
Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission. The enclosure contains the results of an inspection on April 6, 2011, of the service water pond dams at the Virgil C. Summer Nuclear Station, Unit No.1.
At FERC's request, the enclosure is not being made publicly available since it contains critical energy infrastructure information.
Sincerely,
.:2'.f& 1)7 )O-~
.. "V ~
V Robert E. Martin, Senior Project Manager Plant licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395
Enclosure:
Dam Safety and Operation Inspection Report cc wlo encl: Distribution via Listserv The enclosure transmitted herewith contains Security-Related information.
When separated from enclosure, this document is decontrolled.
OFFICIAL USE ONLY SECURITY RELATED INFORMATION
OFFICIAL USE ONLY SECURITY RELATED INFORMATION June 16,2011 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88 Jenkinsville, SC 29065
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 - DAM SAFETY INSPECTION REPORT
Dear Mr. Gatlin:
Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission. The enclosure contains the results of an inspection on April 6, 2011, of the service water pond dams at the Virgil C. Summer Nuclear Station, Unit No.1.
At FERC's request, the enclosure is not being made publicly available since it contains critical energy infrastructure information.
Sincerely, IRA!
Robert E. Martin, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395
Enclosure:
Dam Safety and Operation Inspection Report cc wlo enc!: Distribution via Listserv The enclosure transmitted herewith contains Security-Related information.
When separated from enclosure, this document is decontrolled.
DISTRIBUTION:
PUBLIC RidsNrrPMSummer Resource RidsOgcRp Resource LPL2-1 R/F RidsNrrLAMOBrien Resource RidsAcrsAcnw_MailCTR RidsNrrDorlLpl2-1 Resource RidsRgn2MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDeEmcb Resource DHoang. NRR ECoffman, RII CFletcher, RII ADAMS Accession No.: PKG: ML11153A002 Nonpublic: ML11153AOO1 PUBLIC L TR' ML11153A003 REPORT' ML111440365 OFFICE NRRILPL2-/PM NRR/LPL2-11LA NRRlEMCB/BC NRRILPL2-1IBC NRRlLPL2-1/PM NAME RMartin MOBrien MKhanna GKulesa RMartin DATE 06/13111 06113/11 06/9/11 06/16/11 06/16/11 OFFICIAL RECORD COpy OFFICIAL USE ONLY SECURITY RELATED INFORMATION