May 26, 2011 MEMORANDUM TO: John R. Jolicoeur, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:

Andrew L. Hon, Project Manager

/RA/

Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING ANNUAL INDUSTRY/U.S. NUCLEAR REGULATORY COMMISSION (NRC) MATERIALS PROGRAMS TECHNICAL INFORMATION EXCHANGE MEETING (REV-1)

DATE & TIME:

Wednesday, June 8, 2011, 8:00 a.m. 5:30 p.m.,

Thursday, June 9, 2011, 8:00 a.m. - 5:30 p.m., and Friday, June 10, 2011, 8:00 a.m. - 10:00 a.m.

LOCATION:

Legacy Hotel 1775 Rockville Pike Rockville, MD 20852 PURPOSE:

To discuss technical issues on pressurized water reactor (PWR) and boiling water reactor (BWR) Materials Initiatives with the Electric Power Research Institute (EPRI) Materials Reliability Program, EPRI BWR Vessels and Internals Project, EPRI Nondestructive Examination Center, and the PWR Owners Group Materials Initiative.

CATEGORY 2:

This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.

MEETING CONTACTS:

Andrew Hon, NRR Robert Hardies, NRR 301-415-8480 301-415-5802 andrew.hon@nrc.gov robert.hardies@nrc.gov Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

J. Jolicoeur PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR), Office of New Reactors (NRO), and the Office of Nuclear Regulatory Research (RES).

NRC INDUSTRY Timothy Lupold, NRR Chuck Wirtz, EPRI Allen Hiser, NRR Carl Latiolais, EPRI Matthew Mitchell, NRR Robin Dyle, EPRI Robert Hardies, NRR Randy Stark, EPRI Jonathan Rowley, NRR Mark Huting, EPRI Andrew Hon, NRR Greg Selby, EPRI Al Csontos, RES Jack Spanner, EPRI David Rudland, RES Jim Cirilli, Exelon David Terao, NRO Mel Arey, Duke Eric Reichelt, NRO, et al Jim Molkenthein, PWR Owners Group, et al Project Nos. 669, 689, 691, 694, 704

Enclosure:

Agenda cc w/encl: See next page

J. Jolicoeur PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR), Office of New Reactors (NRO), and the Office of Nuclear Regulatory Research (RES).

NRC INDUSTRY Timothy Lupold, NRR Chuck Wirtz, EPRI Allen Hiser, NRR Carl Latiolais, EPRI Matthew Mitchell, NRR Robin Dyle, EPRI Robert Hardies, NRR Randy Stark, EPRI Jonathan Rowley, NRR Mark Huting, EPRI Andrew Hon, NRR Greg Selby, EPRI Al Csontos, RES Jack Spanner, EPRI David Rudland, RES Jim Cirilli, Exelon David Terao, NRO Mel Arey, Duke Eric Reichelt, NRO, et al Jim Molkenthein, PWR Owners Group, et al Project Nos. 669, 689, 691, 694, 704

Enclosure:

Agenda cc w/encl: See next page DISTRIBUTION PUBLIC PLPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDprPlpb JonathanRowley AllenHiser DavidTerao MatthewMitchell RobertHardies TimothyLupold DavidRuland WilliamBurton RidsNrrLADBaxley RidsNrrDci AlCsontos RidsOpaMail PMNS RidsNrrDe RidsOgcMailCenter RidsNrrPMAHon RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN)

ADAMS ACCESSION NO.: ML1111460037, Enclosure ML111460027 NRC-001 OFFICE PLPB/PM PLPB/LA PLPB/ BC PLPB/PM NAME AHon DBaxley JJolicoeur AHon DATE 5/26/11 5/26/11 5/26/11 5/26/11 OFFICIAL RECORD COPY

BWR Owners= Group Project No. 691 cc:

Mr. Frederick (Ted) Schiffley Chair, BWR Owners Group Exelon Generation Co., LLC.

Cornerstone II at Cantera 4300 Winfield Road Warrenville, IL 60555 Frederick.schiffley@exeloncorp.com Mr. Richard Anderson BWROG, Executive Chair FPL Energy (DAEC)

Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 rich.anderson@fpl.com Mr. James F. Klapproth GE-Hitachi Nuclear Energy M/C A50 3901 Castle Hayne Road Wilmington, NC 28401 james.klapproth@ge.com Mr. Joseph E. Conen, Vice Chair Regulatory Response Group BWR Owners= Group DTE Energy-Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166 conenj@dteenergy.com Dennis Madison, Hatch Vice President Southern Nuclear Operating Co.

11028 Hatch Parkway North Baxley, GA 31515-2010 drmadiso@southernco.com Frederick Emerson BWROG, Project Manager Frederick.emerson@ge.com Mr. Ken A. McCall, Program Manager GE-Hitachi Nuclear Energy M/C F12 3901 Castle Hayne Road Wilmington, NC 28401 kenneth.mccall@ge.com Oscar Limpias Entergy Nuclear Northeast 1340 Echelon Parkway.

Jackson, MS 39213-8202 olimpia@entergy.com Joe Donahue Progress Energy Inc.

410 S. Wilmington St.

PEB 6A Raleigh, NC 27601-1849 joe.w.donahue@pgnmail.com Paul J. Davison Hope Creek Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 paul.davison@pseg.com Mr. Ted Schiffley Vice Chairman, BWROG Exelon Generation Co., LLC.

Cornerstone II at Cantera 4300 Winfield Road Warrenville, IL 60555 frederick.schiffley@exeloncorp.com Mr. Randy C. Bunt, Chair Regulatory Response Group Southern Nuclear Operating Company 40 Inverness Center Parkway/Bin B057 Birmingham, AL 35242 rcbunt@southernco.com

BWRVIP Project No. 704 cc:

Randy Stark, EPRI BWRVIP Integration Manager Raj Pathania, EPRI BWRVIP Mitigation Manager Ken Wolfe, EPRI BWRVIP Repair Manager Larry Steinert, EPRI BWRVIP Electric Power Research Institute 3420 Hillview Ave.

Palo Alto, CA 94304 rstark@epri.com rpathani@epri.com kwolfe@contractor.epri.com ldsteine@contractor.epri.com Randal J. Schmidt, Technical Chairman BWRVIP Assessment Committee PSEG Nuclear, LLC PO BOX 236 (M/S H06)

Hancocks Bridge, NJ 08038-0236 randal.schmidt@pseg.com Andrew D. Odell, Technical Chairman BWRVIP Mitigation Committee Exelon Corporation 200 Exelon Wy (M/S KSA-N-3)

Kennett Square, PA 19348 andrew.odell@exeloncorp.com Paul J. Davison, Executive Chairman BWRVIP Assessment Committee PSEG Nuclear, LLC Salem/Hope Creek Nuclear Station 11 Yubas Ave.

Burlington, NJ 08016 paul.davison@pseg.com Denver Atwood, Chairman BWRVIP Repair Focus Group Southern Nuclear Operating Co.

Post Office Box 1295 40 Inverness Center Parkway (M/S B031)

Birmingham, AL 35242-4809 dgatwood@southernco.com Rich Ciemiewicz, Chairman BWRVIP Inspection Focus Group Exelon Corporation 200 Exelon Way, Suite 210 (M/S KSA 2-N)

Kennett Square, PA 19349 richard.ciemiewicz@exeloncorp.com Charles J. Wirtz, Technical Chairman BWRVIP Integration Committee FirstEnergy Corp.

Perry Nuclear Power Plant (M/S A250) 10 Center Road Perry, OH 44081 cjwirtz@firstenergycorp.com Oscar Limpias, Chairman BWROG Entergy Nuclear Operations, Inc.

Echelon One 1340 Echelon Parkway.

Jackson, MS 39213-8202 olimpia@entergy.com Robert Carter, EPRI BWRVIP Assessment Manager Jeff Landrum, EPRI BWRVIP Inspection Manager EPRI NDE Center P.O. Box 217097 1300 W. T. Harris Blvd.

Charlotte, NC 28221 bcarter@epri.com jlandrum@epri.com Dennis Madison, BWRVIP Vice Chairman Site Vice President Southern Nuclear Operating Co.

Edwin I. Hatch Nuclear Plant US Hwy 1 N Baxley, GA 31515-2010 drmadiso@southernco.com Robert Joseph Whalen, Executive Chairman BWRVIP Mitigation Committee Tennessee Valley Authority (TVA) 1101 Market St Chattanooga, TN 37402-2801 rjwhalen@tva.gov David M. Czufin, Chairman BWRVIP Exelon Corporation.

Cornerstone II at Cantera 4300 Winfield Rd Warrenville, IL 0555 david.czufin@exeloncorp.com

Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:

Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, Director Security Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Acting Vice President for Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. John Butler, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mike Melton, Senior Project Manager 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 man@nei.org Mr. Chris Larsen Vice President and Chief Nuclear Officer EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 cblarsen@epri.com Mr. David J. Modeen Director, External Affairs EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Dr. Sean Bushart EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 sbushart@epri.com Mr. Kurt Edsinger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 kedsinge@epri.com

Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dsteinin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com Robin Dyle EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 rdyle@epri.com

PWR Owners Group Project No. 694 cc:

Mr. James A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Mr. Anthony Nowinowski, Manager Owners Group Program Management Office Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 nowinowa@westinghouse.com