NOC-AE-11002676, Submittal of Supplemental Corrected Pages of License Amendment for Approval of Cyber Security Plan

From kanterella
(Redirected from ML11144A149)
Jump to navigation Jump to search

Submittal of Supplemental Corrected Pages of License Amendment for Approval of Cyber Security Plan
ML11144A149
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/18/2011
From: Harrison A
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-11002676, STI: 32869482, TAC ME4461, TAC ME4462
Download: ML11144A149 (5)


Text

Nuclear Operating Company South Texas Pro/ed ElectricGeneratingStation PO.Bot 289 Wadsworth, Texas 77483 v May 18, 2011 NOC-AE-1 1002676 10CFR50.90 STI: 32869482 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Amended Pages for Submittal of Supplement to License Amendment Request for Approval of Cyber Security Plan (TAC ME4461 and ME4462)

Reference:

Letter from STP Nuclear Operating Company to the NRC Document Control Desk, "Submittal of Supplement to License Amendment Request for Approval of Cyber Security Plan," dated April 28, 2011 (ML11123A216)

Attached are corrected operating license (OL) pages for insertion into STP Nuclear Operating Company's previously submitted response to the U. S. Nuclear Regulatory Commission. Please replace pages 1, 2 and 3 of attachment 1 to the referenced correspondence with the enclosed Attachment 1, pages 1, 2 and 3. The pages are being replaced to add the date of the referenced April 28, 2011 submittal, and correct minor discrepancies in the unchanged portion of the pages for consistency with the existing OL pages.

There are no other changes.

There are no commitments in this letter.

Ifthere are questions, please contact Marilyn Kistler at (361) 972-8385 or me at (361) 972-7298.

Wayne Harrisonsn Manager, Licensing

Attachment:

Replacement Operating License Pages (Do(

1

NOC-AE-1 1002676 Page 2 of 2 cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 612 East Lamar Blvd, Suite 400 Arlington, Texas 76011-4125 Balwant K. Singal U. S. Nuclear Regulatory Commission Balwant K. Singal John Ragan Senior Project Manager Catherine Callaway U.S. Nuclear Regulatory Commission Jim von Suskil One White Flint North (MS 8B1) NRG South Texas LP 11555 Rockville Pike Rockville, MD 20852 Ed Alarcon Senior Resident Inspector Kevin Polio U. S. Nuclear Regulatory Commission Richard Pena P. 0. Box 289, Mail Code: MNl 16 City Public Service Wadsworth, TX 77483 C. M. Canady Peter Nemeth City of Austin Crain Caton & James, P.C.

Electric Utility Department 721 Barton Springs Road C. Mele Austin, TX 78704 City of Austin Richard A. Ratliff Texas Department of State Health Services Alice Rogers Texas Department of State Health Services

NOC-AE-1 1002664 Attachment 1 Page 1 of 3 SOUTH TEXAS LICENSE (4) The facility has been granted a schedular exemption from Section 50.71(e)(3)(i) of 10 CFR 50 to extend the date for submittal of the updated Final Safety Analysis Report to no later than one year after the date of issuance of a low power license for the South Texas Project, Unit 2. This exemption is effective until August 1990. The staffs environmental assessment was published on December 16, 1987 (52 FR 47805).

E. Fire Protection STPNOC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report through Amendment No. 55 and the Fire Hazards Analysis Report through Amendment No. 19, and submittals dated April 29, May 7, 8 and 29, June 11, 25 and 26, 1987; February 3, March 3, and November 20, 2009; January 20, 2010; and as approved in the SER (NUREG-0781) dated April 1986 and its Supplements, subject to the following provision:

STPNOC may make changes to the approved fire protection program without prior approval of the Commission, only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

F. Physical Security STPNOC shall fully implement and maintain in effect all provisions of the physical security, training and qualification, and safeguards contingency plans previously approved by the Commission and all amendments and revisions to such plans made pursuant to the authority under 10 CFR 50.90 and 10 CFR 50.54(p).

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "South Texas Project Electric Generating Station Security, Training and Qualification, and Safeguards Contingency Plan, Revision 2" submitted by letters dated May 17 and 18, 2006.

STPNOC shall fully implement and maintain in effect all provisions of the Commission-approved STPNOC Cyber Security Plan submitted by letter dated April 28, 2011.

Amendment No. 493

NOC-AE-1 1002664 Attachment 1 Page 2 of 3 SOUTH TEXAS LICENSE G. Not Used H. Financial Protection The Owners shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

1. Effective Date and Expiration This license is effective as of the date of issuance and shall expire at midnight on August 20, 2027.

FOR THE NUCLEAR REGULATORY COMMISSION original signed by Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosures:

1. Appendix A, Technical Specifications (NUREG-1305)
2. Appendix B, Environmental Protection Plan Date of Issuance: March 22, 1988 Amendment No. 486

NOC-AE-1 1002664 Attachment 1 Page 3 of 3 (2) The facility was previously granted exemption from the criticality monitoring requirements of 10 CFR 70.24 (See Materials License No.

SNM-1983 dated August 30, 1988 and Section III.E. of the SER dated August 30, 1988). The South Texas Project Unit 2 is hereby exempted from the criticality monitoring provisions of 10 CFR 70.24 as applied to fuel assemblies held under this license.

(3) The facility requires a temporary exemption from the scheduler requirements of the decommissioning planning rule, 10 CFR 50.33(k) and 10 CFR 50.75. The justification for this exemption is contained in Section 22.2 of Supplement 6 to the Safety Evaluation Report. The staff's environmental assessment was published on December 16, 1988 (53 FR 50604). Therefore, pursuant to 10 CFR 50.12(a)(1), 50.12(a)(2)(ii) and 50.12(a)(2)(v), the South Texas Project, Unit 2 is hereby granted a temporary exemption from the schedular requirements of 10 CFR 50.33(k) and 10 CFR 50.75 and is required to submit the decommissioning plan for both South Texas Project, Units 1 and 2 on or before July 26, 1990.

E. Fire Protection STPNOC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report through Amendment No. 62 and the Fire Hazards Analysis Report through Amendment No. 19, and submittals dated April 29, May 7, 8 and 29, June 11, 25, and 26, 1987; February 3, March 3, and November 20, 2009; January 20, 2010; and as approved in the SER (NUREG-0781) dated April 1986 and its Supplements, subject to the following provisions:

STPNOC may make changes to the approved fire protection program without prior approval of the Commission, only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

F. Physical Security The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73 .21, is entitled: "South Texas Project Electric Generating Station Security, Training and Qualification, and Safeguards Contingency Plan, Revision 2" submitted by letters dated May 17 and 18, 2006.

STPNOC shall fully implement and maintain in effect all provisions of the Commission-approved STPNOC Cyber Security Plan submitted by letter dated April 28, 2011.

G. Not Used Amendment No. 84-