2011 Point Beach Nuclear Power Plant Initial License Examination Admin JPMs
ML11143A130
Person / Time
Site: Point Beach  
Issue date: 04/25/2011
From: Mcneil D
Operations Branch III
To:
Florida Power & Light Energy Point Beach
References
Download: ML11143A130 (75)


Text

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 1 of 7 SITE:

Point Beach JPM TITLE:

Perform Control Room Reactor Startup Checklist JPM NUMBER:

Admin JPM a RO REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

PBN P001.001.COT / Perform Mode Change Checklist for Reactor Startup K/A NUMBERS:

2.1.31 (4.6/4.3)

APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

NO Alternate Path:

YES

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 2 of 7 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 BOP.
  • A Reactor Startup is about to be commenced on Unit 1.
  • CL-2E, Mode 3 to Mode 2 checklist has been completed.
  • Unit 1 Letdown Gas stripper is offline.
  • You have been assigned to perform Control Room Portion of Section 1.0 of PBF-2140, Control Room Reactor Startup Checklist.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 3 of 7 JPM PERFORMANCE INFORMATION Required Materials:

Form PBF-2140, Control Room Reactor Startup Checklist Blender 4.0 U1 General

References:

OP-1B, Reactor Startup PBF-2140 Control Room Reactor Startup Checklist Blender Book Task Standards:

The three safety related critical items out of the five items, which are out of required position, are identified and recorded on PBF-2140, Control Room Reactor Startup Checklist.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Critical Y Identify discrepancy between RX Makeup Water Flow controller setting and Boric Acid Flow controller setting.

Standard:

Identify that the settings of the RMUW flow controller and Boric Acid flow controller are not correct when compared with one another. Per Blender 4.0 U1, the expected settings ratio would be 40 / 11 (RX Makeup / Boric Acid).

Evaluator Note:

Per the NOTE at the top of PBF-2140, the checklist does NOT allow repositioning of equipment without authorization.

As left settings: __________ GPM Water, _________GPM Boric Acid For a RX Makeup setting of 40 GPM, Boric Acid should be set at ~10.86 GPM. (10-11.5 GPM acceptable)

Evaluator Cue:

If examinee notifies supervision of the settings, direct examinee to establish required controller settings for auto-makeup.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 4 of 7 Performance Step: 2 Critical Y Identify discrepancy with HC-624 HX-11A RHR HX Outlet Flow Controller.

Standard:

Examinee identifies controller set for 16% instead of the required 0%.

Evaluator Note:

Per the NOTE at the top of PBF-2140, the checklist does NOT allow repositioning of equipment without authorization.

Controller set to wrong position and status lights indicate valve out of position as well.

Reference AR#01180107, actual event that happened in the plant.

Evaluator Cue:

If examinee notifies supervision of the settings, direct examinee to establish required controller settings per checklist.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical N Identify discrepancy for HC-133 RHR to Letdown Flow Controller.

Standard:

Examinee identifies controller set for 25% instead of the required 0%.

Evaluator Note:

Per the NOTE at the top of PBF-2140, the checklist does NOT allow repositioning of equipment without authorization.

Reference AR#00144877, actual event that happened in the plant.

Evaluator Cue:

If examinee notifies supervision of the settings, direct examinee to establish required controller settings per checklist.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 5 of 7 Performance Step: 4 Critical Y Identify HC-466, SG A Main Feed Reg Valve controller in AUTO and set wrong.

Standard:

Identify HC-466 is in AUTO vice MANUAL and set for 40.

Evaluator Note:

Per the NOTE at the top of PBF-2140, the checklist does NOT allow repositioning of equipment without authorization.

Reference AR#00460396, actual event that happened in the plant.

Evaluator Cue:

If examinee notifies supervision of controller in AUTO and set for 40, direct examinee to place controller in MANUAL and set for 0 as requested.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical N Identify PC-2273 LP FWH Bypass Controller, set in MANUAL and too low of a setting.

Standard:

Identify that PC-2273 is set in MANUAL vice AUTO and too low of a setting.

Evaluator Note:

Per the NOTE at the top of PBF-2140, the checklist does NOT allow repositioning of equipment without authorization.

Evaluator Cue:

If examinee notifies supervision of incorrect setting, direct examinee to place PC-2273 LP FWH bypass controller, in AUTO and proper setting as requested.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 6 of 7 Performance Step: 6 Critical N When Control Room portion of Section 1.0 is completed, JPM may be terminated after local check of AF-4000 and AF-4001, Turbine Driven Aux Feed Pump discharge throttle valves, is requested.

Standard:

Request AO to check local valve position for AF-4000 and AF-4001.

Evaluator Cue:

This completes the JPM.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

This completes the JPM.

Stop Time:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 7 of 7 TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 BOP.
  • A Reactor Startup is about to be commenced on Unit 1.
  • CL-2E, Mode 3 to Mode 2 checklist has been completed.
  • Unit 1 Letdown Gas stripper is offline.
  • You have been assigned to perform Control Room Portion of Section 1.0 of PBF-2140, Control Room Reactor Startup Checklist.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 1 of 9 SITE:

Point Beach JPM TITLE:

Review Control Room Reactor Startup Checklist JPM NUMBER:

Admin JPM a SRO REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

PBN P119.210.SRO Review Operating Logs for Trends and Out-of-Specification Conditions K/A NUMBERS:

2.1.18 (3.6/3.8)

APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION: In-Plant:

Control Room:

Simulator:

Other:

X Lab:

Time for Completion:

20 Minutes Time Critical:

NO Alternate Path:

YES

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 2 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 OS.
  • A Reactor Startup is about to be commenced on Unit 1.
  • CL-2E, Mode 3 to Mode 2 checklist has been completed.
  • The Unit 1 BOP has just completed PBF-2140, Control Room Reactor Startup Checklist.
  • 1P-2A Charging Pump is running in AUTO.
  • 1P-2B Charging Pump is running in MANUAL.

INITIATING CUES:

  • You have been assigned by the Shift Manager to review the attached PBF-2140, Control Room Reactor Startup Checklist, prior to startup.
  • Inform the Shift Manager if any actions are required prior to continuing Unit 1 startup.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 3 of 9 JPM PERFORMANCE INFORMATION Required Materials:

Form PBF-2140, Control Room Reactor Startup Checklist filled out with errors.

General

References:

OP-1B, Reactor Startup PBF-2140 Control Room Reactor Startup Checklist Task Standards:

Explain how to disposition the 2 documented discrepancies noticed by the Control Operator as well as discovering 3 discrepancies not properly noted by the Control Operator.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Critical N HC-431H Loop B PZR Spray Controller in MANUAL and SHUT.

Standard:

Examinee reviews the out-of-position component identified by the RO, circled and noted in the remarks section. The Spray Controller can be returned to AUTO once I&C troubleshooting is completed.

Evaluator Cue:

Ask examinee what is required to rectify the abnormal condition.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 4 of 9 Performance Step: 2 Critical Y HC-624 HX-11A RHR HX Outlet Flow Controller set to 25%

Standard:

Examinee reviews logs and identifies HC-624 not set for zero (0) and the RO failed to document the abnormal condition. The abnormal position should be documented in the remarks section and HC-624 should be changed to zero (0).

Evaluator Cue:

Ask examinee what is required to rectify the abnormal condition.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical Y HC-466 SG A Feed Reg Valve Controller is in AUTO set for 40.

Standard:

Examinee reviews logs and identifies HC-466 not in MANUAL set for 0 and the RO failed to document the abnormal condition. The abnormal position should be documented in the remarks section and HC-466 should be placed in MANUAL and shut.

Evaluator Cue:

Ask examinee what is required to rectify the abnormal condition.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical N P-29 AFP SGBD Isolation Defeat Switch is ON.

Standard:

Examinee reviews logs and identifies P-29 AFP SGBD Isolation Defeat Switch is ON and the RO documented the abnormal condition. AFP SGBD Isolation Switch can be placed back to OFF.

Evaluator Cue:

Ask examinee what is required to rectify the abnormal condition.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 5 of 9 Performance Step: 6 Critical Y PC-4019 P-38B AFP Disch Press Controller set for 1000.

Standard:

Examinee reviews logs and identifies PC-4019 is incorrectly set for 1000 and the RO failed to document the abnormal condition. PC-4019 should be adjusted to 1200.

Evaluator Cue:

Ask examinee what is required to rectify the abnormal condition.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical N Examinee informs Shift Manager review of Control Room Reactor Startup Checklist is complete.

Standard:

Examinee gives the Shift Manager the review results and any actions taken.

Evaluator Cue:

Acknowledge the report and this completes the JPM.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

This completes the JPM.

Stop Time:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 6 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 7 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 8 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 9 of 9 TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 OS.
  • A Reactor Startup is about to be commenced on Unit 1.
  • CL-2E, Mode 3 to Mode 2 checklist has been completed.
  • The Unit 1 BOP has just completed PBF-2140, Control Room Reactor Startup Checklist.
  • 1P-2A Charging Pump is running in AUTO.
  • 1P-2B Charging Pump is running in MANUAL.

INITIATING CUES:

  • You have been assigned by the Shift Manager to review the attached PBF-2140, Control Room Reactor Startup Checklist, prior to startup.
  • Inform the Shift Manager if any actions are required prior to continuing Unit 1 startup.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 1 of 10 SITE:

Point Beach JPM TITLE:

Respond to Quadrant Power Tilt in excess of Technical Specifications JPM NUMBER:

Admin JPM b RO REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS / TASK TITLE(S):

PBN P015.008.COT / Respond to Quadrant Power Tilt in excess of Technical Specifications K/A NUMBERS:

015 K5.12 (3.2/3.6)

APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

NO Alternate Path:

NO

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 2 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Unit 1 is operating at 92% and stable following a dropped rod.

The PPCS Excore Tilt calculations were declared inoperable in accordance with CP 312, PPCS Operability Determination, due to PPCS being out of service.

Annunciator POWER RANGE CHANNEL DEVIATION (1C04 1A 3-3) is LIT.

The crew has completed the first four steps of AOP 6H, Quadrant Power Tilt.

INITIATING CUES:

The SRO directs you to perform PBF-2512, Quadrant Power Tilt Manual Calculation, in accordance with AOP-6H, Quadrant Power Tilt, Step 5.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 3 of 10 JPM PERFORMANCE INFORMATION Required Materials:

1.

PBF 2512, Quadrant Power Tilt Manual Calculation

2.

Reactor Operating Data (ROD) Book, ROD 14, Power Range Detector Calibration Currents at 100% power

3.

Calculator General

References:

1.

AOP-6H, Quadrant Power Tilt

2.

CP 312, PPCS Operability Determination

3.

PBF 2512, Quadrant Power Tilt Manual Calculation

4.

Reactor Operating Data (ROD) Book, ROD 14, Power Range Detector Calibration Currents at 100% power Task Standards:

The Examinee determines a Quadrant Power Tilt Ratio in accordance with PBF-2512, Quadrant Power Tilt Manual Calculation Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT:

Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Critical Y Column 1 Record Power Range meter readings from the 0-500 microamp scale.

(Check range set at 0.5 milliamps)

Standard:

Examinee records the power range meter readings from the 0-500 microamp scale (Channels 41A, 42A, 43A, 41B, 42B, 43B, and 44B) into the DATA blocks for Column 1. Tolerance noted on attached KEY.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 4 of 10 Performance Step: 2 Critical Y Column 2 Transfer channel calibration current from ROD 14.

Standard:

The Examinee transfers the channel calibration current from ROD 14 (Channels 41A, 42A, 43A, 41B, 42B, 43B, and 44B) into the DATA blocks for Column 2.

Evaluator Note:

The Evaluator ensures ROD 14 data is entered and available for use.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical Y Column 3 Calculate power for each channel (Column 1 ÷ Column 2).

Standard:

The Examinee calculates power for each channel (Channels 41A, 42A, 43A, 41B, 42B, 43B, and 44B) by dividing the Power Range meter reading values recorded in Column 1 by the channel calibration currents from ROD 14 recorded in Column 2 and Enters the calculated power for each channel into the DATA blocks for Column 3. Tolerance noted on attached KEY.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical Y Column 4 Calculate average power [(sum of Column 3) ÷ 4]

Standard:

The Examinee calculates average power (Upper and Lower) by totaling the values recorded in Column 3 and then dividing by the number 4 and Enters the calculated average power values into the DATA blocks for Column

4. Tolerance noted on attached KEY.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 5 of 10 Performance Step: 5 Critical Y QPTR Calculate upper and lower tilt ratio (Column 3 ÷ Column 4)

Standard:

The Examinee calculates upper and lower tilt ratio by dividing the calculated power for each channel value recorded in Column 3 by the calculated average power recorded in Column 4 and Enters the calculated upper and lower tilt ratio values into the DATA blocks for QPTR. Tolerance noted on attached KEY.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical N PPCS NTILTxU for N41A through N44A, NTILTxL for N41B through N44B.

Standard:

The Examinee may:

Leave the PPCS Column blank, or N/A the PPCS Column and add remarks annotating that PPCS excore tilt calculations were declared inoperable, or Record the values from PPCS.

Evaluator Note:

PPCS Excore Tilt calculations were declared inoperable in accordance with CP 312, PPCS Operability Determination, is one of the initial conditions.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 6 of 10 Performance Step: 7 Critical N Complete the Date/Time and Performed By Standard:

The Examinee signifies completion of the Quadrant Power Tilt Manual Calculation By:

Ensuring the Unit designator is filled in, Completes the Date/Time and Performed By blocks and Returns the completed form to the Evaluator Evaluator Note:

Upon completion of PBF-2512, provide the following cue:

Evaluator Cue:

The OS directs you to continue with AOP 6H, Quadrant Power Tilt, Step 5.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical Y Check Quadrant Power Tilt - Greater than 1.02 Standard:

The Examinee determines that Quadrant Power Tilt is greater than 1.02 and proceeds to Step 6 to reduce thermal power.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

This completes the JPM Stop Time:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 7 of 10 TURNOVER SHEET INITIAL CONDITIONS:

Unit 1 is operating at 92% and stable following a dropped rod.

The PPCS Excore Tilt calculations were declared inoperable in accordance with CP 312, PPCS Operability Determination, due to PPCS being out of service.

Annunciator POWER RANGE CHANNEL DEVIATION (1C04 1A 3-3) is LIT.

The crew has completed the first four steps of AOP 6H, Quadrant Power Tilt.

INITIATING CUES:

The SRO directs you to perform PBF-2512, Quadrant Power Tilt Manual Calculation, in accordance with AOP-6H, Quadrant Power Tilt, Step 5.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 8 of 10 QUADRANT POWER TILT MANUAL CALCULATION Unit 1

SM Review KEY NOTE: If available, then PPCS data should be recorded.

The calculation should be independently checked.

Care should be used to accurately transfer meter readings and data from ROD 14.

Detector Channel 1

2 3

4 QPTR PPCS Upper 41A 237 226 1.049 0.943 1.112

/

42A 226 282 0.801 0.849 Date / Time 43A 270 281 0.961 1.018 44A 285 296 0.963 1.021 Lower 41B 242 250 0.968 0.905 1.069 Performed By 42B 230 279 0.824 0.911 43B 264 289 0.913 1.009 44B 271 296 0.916 1.011 IV Detector Channel 1

2 3

4 QPTR PPCS Upper 41A 234-240 226 1.035-1.062 0.932-0.955

+/-.001 for numbers used

/

42A 223-229 282 0.791-0.812

+/-.001 for numbers used Date / Time 43A 267-273 281 0.950-0.972

+/-.001 for numbers used 44A 282-288 296 0.953-0.973

+/-.001 for numbers used Lower 41B 239-245 250 0.956-0.980 0.895-0.916

+/-.001 for numbers used Performed By 42B 227-233 279 0.814-0.835

+/-.001 for numbers used 43B 261-267 289 0.903-0.924

+/-.001 for numbers used 44B 268-274 296 0.905-0.926

+/-.001 for numbers used IV

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 9 of 10 Note: This is a SOMS form and SOMS must also be revised when this form is revised.

Column Instruction/Source

1.

Record Power Range meter readings from the 0-500 microamp scale. (check range set at 0.5 milliamps)

2.

Transfer channel calibration current from ROD 14.

3.

Calculate power for each channel (column 1 ÷ column 2)

Note: With input from one Power Range channel inoperable AND Thermal Power 75% RTP, the remaining three channels can be used for calculating QPTR in column 4 as [(sum of column 3) ÷ 3]

4.

Calculate average power [(sum of column 3) ÷ 4]

QPTR Calculate upper and lower tilt ratio (column 3 ÷ column 4)

PPCS NTILTxU for N41A through N44A, NTILTxL for N41B through N44B

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 10 of 10 POINT BEACH NUCLEAR PLANT POWER RANGE DETECTOR CALIBRATION CURRENTS AT 100% POWER UNIT 1 100% CALIBRATION CURRENTS (µA)

DATE INITIALS NE-41 NE-42 NE-43 NE-44 A

B A

B A

B A

B 223 245 281 277 280 288 290 283 2 weeks ago DDD 222 242 282 278 281 290 295 280 1 week ago AKZ 226 250 282 279 281 289 296 296 y-day RCB

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 1 of 11 SITE:

Point Beach JPM TITLE:

Review Quadrant Power Tilt Manual Calculation JPM NUMBER:

PBN JPM P119.223a.SRO REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

P119.223.SRO Review Completed Procedures K/A NUMBERS:

APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION: In-Plant:

Control Room:

Simulator:

X Other:

X Lab:

Time for Completion:

20 Minutes Time Critical:

NO Alternate Path:

YES

Page 2 of 11 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is operating at 92% and stable following a dropped rod.
  • Annunciator POWER RANGE CHANNEL DEVIATION (1C04 1A 3-3) is LIT.
  • The crew has completed the first four steps of AOP 6H, Quadrant Power Tilt.
  • The 4th License has completed PBF-2512, Quadrant Power Tilt Manual Calculation, in accordance with AOP-6H, Quadrant Power Tilt, Step 5.

INITIATING CUES:

  • The Shift Manager directs you, OS2, to perform an independent review of the completed PBF-2512, Quadrant Power Tilt Manual Calculation.

Page 3 of 11 JPM PERFORMANCE INFORMATION Required Materials:

1.

PBF 2512, Quadrant Power Tilt Manual Calculation (attached)

2.

Reactor Operating Data (ROD) Book, ROD 14, Power Range Detector Calibration Currents at 100% power (attached)

3.

Calculator General

References:

1.

AOP-6H, Quadrant Power Tilt

2.

CP 312, PPCS Operability Determination

3.

PBF 2512, Quadrant Power Tilt Manual Calculation

4.

Reactor Operating Data (ROD) Book, ROD 14, Power Range Detector Calibration Currents at 100% power Task Standards:

The Examinee determines there are errors with PBF-2512, Quadrant Power Tilt Manual Calculation.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Critical N Verify column 1 Record Power Range meter readings from the 0-500 microamp scale.

Standard:

Examinee verifies recorded power range meter readings from the 0-500 microamp scale (Channels 41A, 42A, 43A, 41B, 42B, 43B, and 44B) into the DATA blocks for Column 1.

Evaluator Note:

This JPM will not require the simulator.

Evaluator Cue:

If asked, inform the examinee the RO correctly filled in data for Column 1.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 11 Performance Step: 2 Critical N Verify column 2 channel calibration current data transferred from ROD

14.

Standard:

The Examinee verifies transferred channel calibration current from ROD 14 (Channels 41A, 42A, 43A, 41B, 42B, 43B, and 44B) into the DATA blocks for Column 2.

Evaluator Note:

Data was transferred incorrectly for 44B.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical N Verify column 3 calculate power for each channel (Column 1 ÷ Column 2).

Standard:

  • The Examinee calculates power for each channel (Channels 41A, 42A, 43A, 41B, 42B, 43B, and 44B) by dividing the Power Range meter reading values recorded in Column 1 by the channel calibration currents from ROD 14 recorded in Column 2 and
  • Verifies the calculated power for each channel for Column 3.

Evaluator Note:

Calculation for channel 44B incorrect from wrong data recorded in column 2.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical N Verify column 4 calculate average power [(sum of Column 3) ÷ 4]

Standard:

  • The Examinee calculates average power (Upper and Lower) by totaling the values recorded in Column 3 and then dividing by the number 4 and
  • Verifies the calculated average power values in column 4.

Evaluator Note:

Lower average power incorrect due to previous incorrect data being recorded.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Page 5 of 11 Performance Step: 5 Critical Y Verify QPTR Calculate upper and lower tilt ratio (Column 3 ÷ Column 4)

Standard:

  • The Examinee calculates upper and lower tilt ratio by dividing the calculated power for each channel value recorded in Column 3 by the calculated average power recorded in Column 4 and
  • Verifies the calculated upper and lower tilt ratio values for QPTR.

Evaluator Note:

All lower QPTR values incorrect and 41A upper recorded incorrectly.

Evaluator Cue:

If examinee reports there are errors associated with the completed QPTR calculation acknowledge the report.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical N PPCS NTILTxU for N41A through N44A, NTILTxL for N41B through N44B.

Standard:

The Examinee may:

  • Leave the PPCS Column blank, or
  • N/A the PPCS Column and add remarks annotating that PPCS excore tilt calculations were declared inoperable.

Evaluator Note:

PPCS Excore Tilt calculations were declared inoperable per initial conditions.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Page 6 of 11 Performance Step: 7 Critical N Verify the Date/Time and Performed By/IV and sign for Shift Management Review Standard:

The Examinee signifies completion of the Quadrant Power Tilt Manual Calculation By:

  • Verifying the Unit designator is filled in,
  • Verifying the Date/Time and Performed By blocks and
  • Returning the completed form to the Evaluator Evaluator Cue:

Upon completion of PBF-2512 review the examinee may report errors associated with the calculations and not sign the PBF.

Acknowledge the report and inform the examinee the SM directs you to continue with AOP 6H, Quadrant Power Tilt, Step 5 using the corrected calculations.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical Y Check Quadrant Power Tilt - Greater than 1.02 Standard:

The Examinee determines that Quadrant Power Tilt is greater than 1.02 (12%) and proceeds to Step 6 to reduce thermal power.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Critical Y Reduce Thermal Power at least 3% from Rated Thermal Power for every 1% Indicated Power Tilt.

Standard:

The Examinee determines that Reactor Thermal Power needs to be reduces 36% from RTP which means an additional 28% minimum load reduction is needed based on initial conditions.

Evaluator Cue:

Ask examinee the minimum power reduction required.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Page 7 of 11 Terminating Cues:

This completes the JPM.

Stop Time:

Page 8 of 11 TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is operating at 92% and stable following a dropped rod.
  • Annunciator POWER RANGE CHANNEL DEVIATION (1C04 1A 3-3) is LIT.
  • The crew has completed the first four steps of AOP 6H, Quadrant Power Tilt.
  • The 4th License has completed PBF-2512, Quadrant Power Tilt Manual Calculation, in accordance with AOP-6H, Quadrant Power Tilt, Step 5.

INITIATING CUES:

  • The Shift Manager directs you, OS2, to perform an independent review of the completed PBF-2512, Quadrant Power Tilt Manual Calculation.

Page 9 of 11 ANSWER KEY DO NOT HAND OUT Detector Channel 1

2 3

4 QPTR PPCS Upper 41A 237 226 1.049 0.943 1.112+/-.001

/

42A 226 282 0.801 0.849+/-.001 Date / Time 43A 270 281 0.961 1.018+/-.001 44A 285 296 0.963 1.021+/-.001 Lower 41B 242 250 0.968 0.905 1.069+/-.001 Performed By 42B 230 279 0.824 0.911+/-.001 43B 264 289 0.913 1.009+/-.001 44B 271 296 0.916 1.011+/-.001 IV HIGHLITED ARAS ARE WHERE ERRORS WERE INSERTED Detector Channel 1

2 3

4 QPTR PPCS Upper 41A 237 226 1.049 0.943 1.049 Today/20 min ago 42A 226 282 0.801 0.849 Date / Time 43A 270 281 0.961 1.018 44A 285 296 0.963 1.021 Lower 41B 242 250 0.968 0.918 1.054 Performed By 42B 230 279 0.824 0.898 43B 264 289 0.913 0.995 44B 271 280 0.968 1.054 IV

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 10 of 11 QUADRANT POWER TILT MANUAL CALCULATION Unit 1

Shift Management Review NOTE: If available, then PPCS data should be recorded.

The calculation should be independently checked.

Care should be used to accurately transfer meter readings and data from ROD 14.

Detector Channel 1

2 3

4 QPTR PPCS Upper 41A 237 226 1.049 0.943 1.049 OOS Today/20 min ago 42A 226 282 0.801 0.849 OOS Date / Time 43A 270 281 0.961 1.018 OOS 44A 285 296 0.963 1.021 OOS AKZ Lower 41B 242 250 0.968 0.918 1.054 OOS Performed By 42B 230 279 0.824 0.898 OOS 43B 264 289 0.913 0.995 OOS 44B 271 280 0.968 1.054 OOS IV Detector Channel 1

2 3

4 QPTR PPCS Upper 41A

/

42A Date / Time 43A 44A Lower 41B Performed By 42B 43B 44B IV Detector Channel 1

2 3

4 QPTR PPCS Upper 41A

/

42A Date / Time 43A 44A Lower 41B Performed By 42B 43B 44B IV Note: This is a SOMS form and SOMS must also be revised when this form is revised.

Column Instruction/Source

1.

Record Power Range meter readings from the 0-500 microamp scale. (check range set at 0.5 milliamps)

2.

Transfer channel calibration current from ROD 14.

3.

Calculate power for each channel (column 1 ÷ column 2)

Note: With input from one Power Range channel inoperable AND Thermal Power 75% RTP, the remaining three channels can be used for calculating QPTR in column 4 as [(sum of column 3) ÷ 3]

4.

Calculate average power [(sum of column 3) ÷ 4]

QPTR Calculate upper and lower tilt ratio (column 3 ÷ column 4)

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 11 of 11 PPCS NTILTxU for N41A through N44A, NTILTxL for N41B through N44B POINT BEACH NUCLEAR PLANT POWER RANGE DETECTOR CALIBRATION CURRENTS AT 100% POWER UNIT 1 100% CALIBRATION CURRENTS (µA)

DATE INITIALS NE-41 NE-42 NE-43 NE-44 A

B A

B A

B A

B 223 245 281 277 280 288 290 283 2 weeks ago DDD 222 242 282 278 281 290 295 280 1 week ago AKZ 226 250 282 279 281 289 296 296 y-day RCB

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 1 of 9 SITE:

Point Beach JPM TITLE:

Review a Clearance Order for Accuracy JPM NUMBER:

Admin JPM c RO REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

NUC TAG 103 Clearance Hanger K/A NUMBERS:

2.2.13 (4.1/4.3)

APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

X Lab:

Time for Completion:

20 Minutes Time Critical:

NO Alternate Path:

YES

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 2 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are an RO assigned to the Work Control Center. 1P-2C Charging Pump needs to be isolated due to excessive seal leakage per OI-50, Charging Pump Isolation, and then danger tagged.
  • A Clearance Order has been pulled from the Master database to use as a guide in preparing the Clearance Order.

INITIATING CUES:

  • You are to review the Master Clearance provided for adequacy.
  • If the Clearance is adequate, then inform the WCC Supervisor.
  • If the Tag Series is NOT adequate, then you are to inform the WCC Supervisor of the changes needed to correct ALL deficiencies.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 3 of 9 JPM PERFORMANCE INFORMATION Required Materials:

1P-2C Charging Pump Clearance as provided from eSOMS OP-AA-101 Clearance and Tagging OI-50, Charging Pump Isolation P & ID 684J174 Sh. 2 Unit 1 CVCS Master Data Books WEST 499B466 Sh. 316A 1P-2C Charging Pump General

References:

OP-AA-101 Clearance and Tagging OI-50, Charging Pump Isolation P & ID 684J174 Sh. 2 Unit 1 CVCS Master Data Books WEST 499B466 Sh. 316A 1P-2C Charging Pump Task Standards:

Clearance is reviewed and the three errors noted in this JPM are identified.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Critical N Obtain and review references as needed to determine tag series adequacy.

Standard:

References (as indicated on tag series tag list) are obtained and reviewed as needed.

Evaluator Note:

The examiner should keep the examinee focused on the tag series review using references in the simulator (i.e. plant walk-down, review of specific tags, etc. is not necessary).

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 4 of 9 Performance Step: 2 Critical Y Determine if specified tag series boundaries are adequate for worker safety and scope of work.

Standard:

Disconnect for 1P-2C determined to be incorrect, disconnect should be 1B29-P-2C.

Evaluator Note:

Disconnect listed on tag series, (1B29-P-2A) is for charging pump 1P-2A.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical Y Determine if specified clearance order boundaries are adequate for worker safety and scope of work.

Standard:

CV-399, P-2C Charging Pump Suction has the wrong unit designator. 2CV-399 is selected vice 1CV-399.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical Y Determine if specified tag series boundaries are adequate for worker safety and scope of work.

Standard:

Drain valve 1CV-262C, 1P-2C Charging Pump discharge header drain first off isolation, is identified as being SHUT on the tag series. 1CV-262C should be listed as open.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When examinee indicates that all deficiencies have been identified OR indicates the Tag Series is adequate, the JPM may be terminated.

Stop Time:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 5 of 9 TURNOVER SHEET INITIAL CONDITIONS:

  • You are an RO assigned to the Work Control Center. 1P-2C Charging Pump needs to be isolated due to excessive seal leakage per OI-50, Charging Pump Isolation, and then danger tagged.
  • A Clearance Order has been pulled from the Master database to use as a guide in preparing the Clearance Order.

INITIATING CUES:

  • You are to review the Master Clearance provided for adequacy.
  • If the Clearance is adequate, then inform the WCC Supervisor.
  • If the Tag Series is NOT adequate, then you are to inform the WCC Supervisor of the changes needed to correct ALL deficiencies.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 6 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 7 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 8 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 9 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 1 of 9 SITE:

Point Beach JPM TITLE:

Approve a Clearance Order JPM NUMBER:

Admin JPM c SRO REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

NUC TAG 104 Clearance Authorizer K/A NUMBERS:

2.2.13 (4.1/4.3)

APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION: In-Plant:

Control Room:

Simulator:

X Other:

X Lab:

Time for Completion:

20 Minutes Time Critical:

NO Alternate Path:

YES

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 2 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the relief crew SRO assigned to the Work Control Center. 1P-2C, Unit 1 Charging Pump, needs to be isolated per OI-50, Charging Pump Isolation and danger tagged for maintenance activities.

INITIATING CUES:

  • You are to review the Clearance Order provided for adequacy.
  • If the Clearance Order is adequate, then approve the Clearance Order.
  • If the Clearance Order in NOT adequate, then identify changes that need to be made prior to approval.
  • Attachment 1 of OP-AA-101, Clearance Development and Implementation does not need to be completed at this time.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 3 of 9 JPM PERFORMANCE INFORMATION Required Materials:

1P-2C Charging Pump Clearance as provided from eSOMS OP-AA-101 Clearance and Tagging OI-50, Charging Pump Isolation P & ID 684J174 Sh. 2 Unit 1 CVCS Master Data Books WEST 499B466 Sh. 316A 1P-2C Charging Pump General

References:

OP-AA-101 Clearance and Tagging OI-50, Charging Pump Isolation P & ID 684J174 Sh. 2 Unit 1 CVCS Master Data Books WEST 499B466 Sh. 316A 1P-2C Charging Pump Task Standards:

Clearance is reviewed and the three errors noted in this JPM are identified.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Critical N Obtain and review references as needed to determine tag series adequacy.

Standard:

References (as indicated on clearance order coversheet) are obtained and reviewed as needed.

Evaluator Note:

The examiner should keep the examinee focused on the tag series review using available references (i.e. plant walk-down, review of requesting individual documentation and review of specific tags is not necessary, etc.)

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 4 of 9 Performance Step: 2 Critical Y Determine if specified tag series boundaries are adequate for worker safety and scope of work.

Standard:

Disconnect for 1P-2C determined to be incorrect, disconnect should be 1B29-P-2C.

Evaluator Note:

Disconnect listed on tag series, (1B29-P-2A) is for charging pump 1P-2A.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical Y Determine if specified clearance order boundaries are adequate for worker safety and scope of work.

Standard:

CV-399, P-2C Charging Pump Suction has the wrong unit designator.

2CV-399 is selected vice 1CV-399.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical Y Determine if clearance order boundaries are adequate for worker safety and scope of work.

Standard:

Drain valve 1CV-262C, 2P-2C Chg Pump Discharge Header Drain First Off Isol, is identified as being SHUT on the clearance order checklist. 1CV-262C should be listed as OPEN.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When examinee indicates that all deficiencies have been identified OR indicates the Clearance Order is adequate, the JPM may be terminated.

Stop Time:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 5 of 9 TURNOVER SHEET INITIAL CONDITIONS:

  • You are the relief crew SRO assigned to the Work Control Center. 1P-2C, Unit 1 Charging Pump, needs to be isolated per OI-50, Charging Pump Isolation and danger tagged for maintenance activities.

INITIATING CUES:

  • You are to review the Clearance Order provided for adequacy.
  • If the Clearance Order is adequate, then approve the Clearance Order.
  • If the Clearance Order in NOT adequate, then identify changes that need to be made prior to approval.
  • Attachment 1 of OP-AA-101, Clearance Development and Implementation does not need to be completed at this time.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 6 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 7 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 8 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 9 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 1 of 11 SITE:

Point Beach JPM TITLE:

Prepare for Entry into Locked High Radiation Area JPM NUMBER:

Admin JPM d.

REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

P162.008.AOT Enter/exit various radiologically controlled areas K/A NUMBERS:

GEN 2.3.13 (3.4/3.8)

APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION: In-Plant:

X Control Room:

Simulator:

Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

NO Alternate Path:

NO

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 2 of 11 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Both units are at full power.
  • A contractor told an RP Technician he saw water leaking from a valve and he believed it to be a packing leak.
  • The contractor was able to identify the valve number only as 2CV-303D and gave no additional clarifying information.

INITIATING CUES:

  • The Relief Crew Supervisor has directed you to locate valve 2CV-303D, 2F-39A RCP Seal Injection Filter Inlet Valve, and quantify the leakage so that recommendations can be made concerning repairs.
  • You are to prepare a Jump Ticket (PBF-4245) in preparation to determine entry requirements into Unit 2 Seal Water Injection Filter Cubicle.
  • The leak quantification is expected to take approximately 3 minutes.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 3 of 11 JPM PERFORMANCE INFORMATION Required Materials:

PBF-4021 Area 6-3 Radiological survey map of U2 Seal Filter Cubical Operations Routine RWP PBF-4245 Jump Ticket General

References:

PBF-4021 Area 6-3 Radiological survey map of U2 Seal Filter Cubical Operations Routine RWP PBF-4245 Jump Ticket HP 2.6 Locked and Very High Radiation Area Key Control Task Standards:

Prepare a Jump Ticket (PBF-4245) to determine entry requirements into Unit 2 RCP Seal Water Injection Filter Cubical.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Critical N Examinee reviews given survey map and OPS RWP to determine information needed for Jump Ticket.

Standard:

Reviews survey map to determine the seal filter cubicle is a LHRA and requires the use of Task #3 on the OPS Routine RWP.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical N Examinee fills out Jump Ticket for the following:

(1) Name: ___________________

Standard:

Examinee fills in their name.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 4 of 11 Performance Step: 3 Critical N Examinee fills out Jump Ticket for the following:

(2) WO#: ___________________.

Standard:

Examinee fills in given WO number.

Evaluator Cue:

WO 34567 was generated for this task.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical N Examinee fills out Jump Ticket for the following:

(3) RWP#: ___________________.

Standard:

Examinee fills out 11-003.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical N Examinee fills out Jump Ticket for the following:

(4) PB0 PB1 PB2 (circle one)

Standard:

Examinee circles PB2.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 5 of 11 Performance Step: 6 Critical Y Examinee fills out Jump Ticket for the following:

(5) Specific component location or area: ____________________.

Standard:

Examinee fills out Unit 2 Seal Injection Filter Cubicle or similar wording.

Evaluator Cue:

Have examinee locate 2CV-303D on the survey map.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical N Examinee fills out Jump Ticket for the following:

(6) Work to be performed: ____________________.

Standard:

Examinee fills out quantifying packing leakage on 2CV-303D or similar wording.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical N Examinee fills out Jump Ticket for the following:

(7) Dose goal: ____________________.

Standard:

Examinee calculates potential dose for the job.

Evaluator Note:

3 minutes times 55 mRem/hr = about 3 mr dose.

55 mRem comes from the survey map near the leaky valve. A higher dose rate may be used depending on where the examinee thinks they will have to work.

Evaluator Cue:

The time to quantify the leak is expected to take 3 minutes (given).

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 6 of 11 Performance Step: 9 Critical Y Examinee fills out Jump Ticket for the following:

(8) Dose Alarm: _________.

(9) Dose Rate Alarm: _________.

Standard:

Examinee determines Alarm and Rate Alarm to be 152 mRem and 1,000 mRem/hr from Task #3 within the OPS RWP for LHRA.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Critical N Examinee fills out Jump Ticket for the following:

(10) Expected Dose Rate Range: __________ mRem/hr Standard:

Examinee determines range to be from background to an area they think they will enter.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Critical Y Examinee fills out Jump Ticket for the following:

(11) Expected Contamination Levels: Clean CA HCA (Circle Choice)

Standard:

Examinee circles HCA based on survey map.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 7 of 11 Performance Step: 12 Critical Y Examinee fills out Jump Ticket for the following:

(12) Protective Clothing Req. Class: None 1 2 3 Standard:

Examinee circles 2 based on task #3 OPS RWP.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Critical Y Examinee fills out Jump Ticket for the following:

(13) Entering a HRA or LHRA? YES NO (Circle Choice)

A High Radiation Area Briefing by Radiation Protection is Required prior to entering the area.

Standard:

Examinee circles YES based on survey map.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 Critical N Examinee fills out Jump Ticket for the following:

(14) Is RP Coverage Required? YES NO (Circle Choice)

Standard:

Examinee circles YES based on task#3 in the OPS RWP.

Evaluator Note:

Jump ticket states this is obtained from RP so this may not be circled Performance:

SATISFACTORY UNSATISFACTORY Comments:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 8 of 11 Performance Step: 15 Critical N What actions are required to exit the Locked High Rad area?

Standard:

Examinee determines the following actions are required:

  • Remove protective clothing
  • Ensure gate is locked
  • Whole body frisk at nearest station Evaluator Cue:

Ask examinee what actions are required to exit the Locked High Radiation Area.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

This completes the JPM Stop Time:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 9 of 11 ANSWER KEY

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 10 of 11

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 11 of 11 TURNOVER SHEET INITIAL CONDITIONS:

  • Both units are at full power.
  • A contractor told an RP Technician he saw water leaking from a valve and he believed it to be a packing leak.
  • The contractor was able to identify the valve number only as 2CV-303D and gave no additional clarifying information.

INITIATING CUES:

  • The Relief Crew Supervisor has directed you to locate valve 2CV-303D, 2F-39A RCP Seal Injection Filter Inlet Valve, and quantify the leakage so that recommendations can be made concerning repairs.
  • You are to prepare a Jump Ticket (PBF-4245) in preparation to determine entry requirements into Unit 2 Seal Water Injection Filter Cubicle.
  • The leak quantification is expected to take approximately 3 minutes.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 1 of 9 SITE:

Point Beach JPM TITLE:

CLASSIFY AN EMERGENCY EVENT IN ACCORDANCE WITH EPIP 1.2 JPM NUMBER:

Admin JPM e SRO REV.

0 RELATED PRA INFORMATION:

None TASK NUMBERS /

TASK TITLE(S):

P028.001.EMR / Classify an emergency event in accordance with EPIP 1.2.

K/A NUMBERS:

2.4.40 (4.5) 2.4.41 (4.6)

APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION: In-Plant:

Control Room:

Simulator:

X Other:

X Lab:

Time for Completion:

20 Minutes Time Critical:

YES Alternate Path:

NO

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 2 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

  • You are the Shift Manager
  • Both Units were operating at 100% power with a severe thunderstorm warning in effect.

Unit 2 had indications of a small Steam Generator Tube Leak (A SG) with leakage estimated at 50 gallons per day.

  • Electrical perturbations from multiple lightning strikes caused a total loss of off-site power to Unit 2 and Unit 2 reactor tripped due to a unit lockout.
  • 2A05 and 2A06 are powered from their respective emergency diesels.
  • The loss of off-site power occurred 10 minutes ago and has not been restored.
  • OS1 has completed a NARS form for an UNUSUAL EVENT.
  • Wind Direction is 130 degrees
  • Wind Speed is 10 mph with Stability Class D INITIATING CUES:
  • Based on the initial conditions given above and using the guidance of EPIP 1.2, you are to review the initial recommendation made by OS1 and either approve the classification, or if necessary re-classify the event.

SUBSEQUENT CUES (provide after initiating cue is understood but prior to starting time critical clock):

  • The Unit 2 CO reports to you that Unit 2 Safety Injection has actuated and the A Steam Generator tube leakage has increased to 450 gpm.
  • Offsite Power has not been restored.

Based on this additional information, re-classify the event if necessary, in accordance with EPIP 1.2.

THIS IS A TIME CRITICAL JPM

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 3 of 9 JPM PERFORMANCE INFORMATION Required Materials:

EPIP 1.2, Emergency Classification EPIP 1.2.1, Emergency Action Level Technical Basis Filled out NARS form for SU 1.1 from EPIP 1.1 General

References:

EPIP 1.2, Emergency Classification EPIP 1.2.1, Emergency Action Level Technical Basis EPIP 1.1 Course Of Actions Task Standards:

Verify emergency plan classification of initial event in progress with subsequent re-classification.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number.

Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 4 of 9 Performance Step: 1 Critical Y Verify/Re-classify the event using EPIP 1.2 based only on the initial conditions given Standard:

Examinee researches initial conditions and references EPIP 1.2 and 1.2.1 as necessary and determines that the OS was correct in his assessment and initial recommendation.

An Unusual Event exists on SU1.1, Loss of power to or from the 2X04 transformer that results in a loss of all offsite power to both 2A05 and 2A06 for greater than 15 minutes AND Both safety-related 4160 VAC buses 2A05 and 2A06 power from emergency generators.

Evaluator Note:

RECORD START TIME OF TIME CRITICAL PORTION OF JPM:___________.

Time clock does not start until subsequent cue is given and understood by examinee.

To meet the standard the examinee must determine initial classification within 5 minutes of start time.

Evaluator Cue:

If examinee starts to fill out a NARS form for the re-classification, inform them they only need to classify the event at this time.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical Y Using EPIP 1.2, and additional conditions given, reclassify the event.

Standard:

Examinee must recognize a SITE AREA EMERGENCY is now required to be declared per FS1 based on RCS Barrier Loss EAL #3 AND Containment Barrier Loss EAL #4.

The classification must be completed within 15 minutes of completion of the reading of the evaluator cue in JPM step 1.

Evaluator Note:

When examinee indicates his answer, the JPM is complete.

To meet the standard the examinee must determine subsequent classification within 15 minutes of start time.

Performance:

SATISFACTORY UNSATISFACTORY

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 5 of 9 Terminating Cues:

JPM may be terminated.

Stop Time:

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 6 of 9 TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Shift Manager
  • Both Units were operating at 100% power with a severe thunderstorm warning in effect.

Unit 2 had indications of a small Steam Generator Tube Leak (A SG) with leakage estimated at 50 gallons per day.

  • Electrical perturbations from multiple lightning strikes caused a total loss of off-site power to Unit 2 and Unit 2 reactor tripped due to a unit lockout.
  • 2A05 and 2A06 are powered from their respective emergency diesels.
  • The loss of off-site power occurred 10 minutes ago and has not been restored.
  • OS1 has completed a NARS form for an UNUSUAL EVENT.
  • Wind Direction is 130 degrees
  • Wind Speed is 10 mph with Stability Class D INITIATING CUES:
  • Based on the initial conditions given above and using the guidance of EPIP 1.2, you are to review the initial recommendation made by OS1 and either approve the classification, or if necessary re-classify the event.

THIS IS A TIME CRITICAL JPM

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 7 of 9 SUBSEQUENT CUES

  • The Unit 2 CO reports to you that Unit 2 Safety Injection has actuated and the A Steam Generator tube leakage has increased to 450 gpm.
  • Offsite Power has not been restored.

Based on this additional information, re-classify the event if necessary, in accordance with EPIP 1.2.

THIS IS A TIME CRITICAL JPM

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 8 of 9

Point Beach Nuclear Plant Job Performance Measure (JPM)

Page 9 of 9