ML11129A109

From kanterella
Jump to navigation Jump to search
Update to Technical Specification Bases and Technical Requirements Manual
ML11129A109
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/27/2011
From: O'Connor T
Xcel Energy, Northern States Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-11-022
Download: ML11129A109 (2)


Text

Monticello Nuclear Generating Plant XcelEnergy 2807 W County Road 75 Monticello, MN 55362 April 27, 2011 L-MT-1 1-022 10 CFR 50.71(e)

Technical Specification 5.5.9 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Update to Technical Specification Bases and Technical Requirements Manual This letter provides the Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, updates to the Technical Specification (TS) Bases and Technical Requirements Manual (TRM) for the Monticello Nuclear Generating Plant (MNGP). The TS Bases are being provided in accordance with Specification 5.5.9, "Technical Specification (TS) Bases Control Program," on a frequency consistent with 10 CFR 50.71(e). The Technical Requirements Manual (TRM) is being provided in accordance with 10 CFR 50.71(e). The enclosed compact disc (CD) provides current copies of the entire MNGP TS Bases (Revision 16) and MNGP TRM (Revision 7).

A description of changes to the TS Bases is provided in Table 2, "Technical Specification Bases Record of Revisions," located near the beginning of File 001 (see below) on the enclosed CD. A description of changes to the TRM is provided in Table 2, "TRM Record of Revisions," located near the beginning of File 002 (see below) also on the enclosed CD.

Both files are provided in their entirety electronically on CD in accordance with U.S. NRC, "Guidance for Electronic Submissions to the NRC," Revision 5, dated June 25, 2009.

001 Monticello TS Bases Rev 16.pdf 002 Monticello TRM Rev 7.pdf Summary of Commitments No new commitments or changes to any existing commitments are proposed by this letter.

Document Control Desk L-MT-1 1-022 Page 2 of 2 5n presented herein accurately presents changes since the last iruary 18, 2011, to the date of this letter.

sident, Monticello Nuclear Generating Plant es Power Company - Minnesota

Enclosure:

Compact Disc cc:

Administrator, Region III, USNRC Resident Inspector, Monticello, USNRC Project Manager, Monticello, USNRC Minnesota Department of Commerce