ML11126A308
| ML11126A308 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom (DPR-044, DPR-056) |
| Issue date: | 04/15/2011 |
| From: | David Helker Exelon Generation Co, Exelon Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML11126A308 (1) | |
Text
Exekrn.
Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com Nuclear TS 5.5.10.d April 15, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
Subject:
Submittal of Changes to Technical Specifications Bases In accordance with the requirement of Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Technical Specification 5.5.10.d, Exelon Generation Company, LLC, hereby submits a complete updated copy of the Unit 2 and Unit 3 Technical Specifications Bases. The enclosed Bases include changes through the date of this letter.
If you have any questions or require further information, please contact Tom Loomis (610-765-5510).
Sincerely, David P. Helker Manager, Licensing & Regulatory Affairs Exelon Generation Company, LLC
Enclosures:
- 1) PBAPS Unit 2 Bases
- 2) PBAPS Unit 3 Bases cc USNRC Region I, Regional Administrator USNRC Senior Resident Inspector, PBAPS USNRC Project Manager, PBAPS R. R. Janati, Bureau of Radiation Protection S. T. Gray, State of Maryland (w/o encl.)
(w/o encl.)
(w/encl.)
(w/o encl.)
(w/o encl.)
A-bQL