05/04/2011 Part 21 (PAR)
U.S. Nuclear Regulatory Commission Operations Center Event Report Page 1 Event#
46821 Rep Org: SOR INC PROCESS INSTRUMENTATION Notification Date / Time: 05/04/2011 12:14 (EDT)
Supplier: SOR INC PROCESS INSTRUMENTATION Event Date / Time: 05/04/2011 (CDT)
Last Modification: 05/04/2011 Region: 4 Docket #:
City:
LENEXA Agreement State:
Yes County:
License #:
State:
KS NRC Notified by: COLBERT TURNEY Notifications:
DAVID PROULX R4DO HQ Ops Officer: BILL HUFFMAN PART 21 GROUP Emergency Class: NON EMERGENCY MARK RING R3DO 10 CFR Section:
21.21 UNSPECIFIED PARAGRAPH PRESSURE SWITCH WITH POSSIBLE SUB-STANDARD ELECTRICAL LEAD TERMINATIONS SOR Process Instruments has determined that certain model pressure switches it has manufactured may have leads attached to the terminal blocks that are not in conformance with good manufacturing practice. The pressure switches in question may have lead wire attached to the terminal block in which the connection between the stripped, stranded wire and a crimped terminal may not be flush with the terminal end. SOR states that there have been no known field problems associated with this issue.
This condition applies to SOR model switches with terminal block "X" options 9013-737, 9013-747, 9013-7674.
SOR has provided this information to those customers that purchased these switches. The U.S. plants that received these switches are Braidwood and Duane Arnold.
j-1-- -re-
'_j 0a
Ma 04 11?11:14a Roberta Chandler 913-312-3582 p.1 DATE May 4, 2011 TO Nuclear Regulatory Commission FROM Colbert Turney, Vice President of Quality SUBJECT No. Pages (II,,.
, i lri - L-lJ *.
Information Notice 6
There have been no known field problems associated with this attached information notice.
All customers who have received switches with this option have been or will be notified today.
Please contact me if any other information or actions are necessary.
Colbert Tumey Vice President of Quality SOR Inc.
14685 W 10 51h Street Lenexa KS 66215 Toll Free: 800-676-6794 Voice: 913-888-2630 Extension: 913-956-3160 Fax: 913-312-3582 Process Instrumentation I Pressure I Level I Temperature 1 Flow 14685 West 105th Street I Lenexa, Kansas 66215-2003 913-888-2630 800-676-6794 WE DELIVER QUALITY ON TIME Form 1497 (02.11) C 2011 SORh W.
Maý 04 11i11:15a Roberta Chandler 913-312-3582 p.2 Process Instrumentation Pressure Level. Temperature Flow sorinc.com 14685 West 105th Street Lenexa, Kansas 66215-2003 r 913-888-2630 800-676-6794 May 2, 2011 Nuclear Regulatory Commission via fax 301-816-5151 Nextera Energy, Duane Arnold Energy Center Exelon, Braidwood Generation Co. LLC Tractebel Suez, Doel Nuclear Power Station INFORMATION NOTICE Suboect:
This is an information notice regarding SOR pressure switches that have the electrical terminal block option. A condition of general good manufacturing practice has been brought to our attention in regards to the crimping of wire lugs onto lead wires in the SOR terminal block assembly. SOR allowed a switch to be shipped in which one of the three lead wires in this switch did not meet these criteria, see attached picture.
scope:
This information notice applies to SOR models with the terminal block "X" options, 9013-737, 9013-747 and 9013-764. An attachment identifies each switch by your P0 number, the SOR sales order number, SOR model number, SOR serial number and the ship date. This notice does not apply to SOR switches that have the SCR factory conduit seal "JJ" option.
Discussion:
Good manufacturing practice for creating a connection between a stripped, stranded wire and a crimped terminal suggests that the stranded wire be visible inside the lug after crimping. The wire may be flush with the end of the terminal or protruding out no more than 1/16". In one instance, one of the three wires on a terminal block did not have bare wires that were flush with the terminal end. We believe this was a random occurrence, however, we decided to bring this to your attention. In addition, all switches at SOR must pass a number of tests before they are released for shipment. All of these tests are documented by Production personnel and witnessed by Quality Control personnel. All pressure switches that are in your possession now have passed these tests. There have been no known field problems associated with this issue.
Customer Action:
At our customer's option, the subject products may be visually inspected and any wire connections that do not meet the noted criteria may be returned to SOR for rework. To return a switch, contact SOR for a Returned Material Authorization (RMA) number. SOR will pay freight and replace the terminal free of charge. If you decide to inspect the switches, SOR will send replacement cover gaskets. Please notify us if you wish to have gaskets shipped to you.
Preventative Action:
We have instituted improved procedures and training for Fabrication, Assembly and Inspection personnel to prevent future incidences.
I apologize for the inconvenience this may cause you.
ColbertTurney Vice President o %ality c: B Benton, J Fortino, J Modig, L Coutts, J Jursich FAXES 913-894-1538 :01l3-888-91 38.,0l3-888-7563 9 c13-599-0278: 091 3-888-0767 913-888-81 50, 913-8e8-4837 913-3-i2-3582 ACCOUNTING EN!NE.=- RING DECU.JTt',i
-R INS DE. SALES MARKETING PUrZC?.-ASING OJAI.IFY WE DELIVER QUALITY ON TIME Form 1486,(02.11) c 20 I S1ORI Ic.
M ay 04 1i i 11: 15a Information Notice May 2, 2011 Page 2 of 2 Roberta Chandler 913-312-3582 p.3 FAXES 913-894-1538 '913-888-9138 1 913-888-7563 I 913-599-0278 I 913-888-0767 913-ea8-8150 913-888-4837 F 913-312-3582 ACCOUi*NNG ENGINEERING ECUEtlE HR INSIDE SA.ES MARKETINO PURCHASI*N3G GU WE.DEUVER duALITY ON TIME Fornm 1486 (02.11) C:2011 SOR Inc.
May 04 11 11:15a Roberta Chandler 913-312-3582 p.4 sorinc.com Process Instrumentation Pressure Level Temperature Flow 14685 West 105-h Street Lenexa, Kenses 66215-2003
-1 3-888-2630 800-676-6794 Nextera Energy Duane Arnold Energy Center 3277 Daec Road Palo IA 52324
Subject:
Evaluation of Deviation for Defect Report: Wire Conductor Crimping To whom it may concern:
This letter is sent to address an Evaluation of Deviation for Defect performed by SOR in response to a customer's incoming inspection concern on one switch received February 9, 2011. Please refer to the Information Notice dated May 2, 2011, attached.
PO K132576 02259125 02261223 02261223 SOR SO 517742*1 521918*1 525222*1 529060*1 Model No.
9013737 9013737 9013737 9013737 Serial No.
100405784 100606117 100901789 101201120 Ship Date 05/2812010 07/20/2010 09/2912010 12103/2010 Best regards, Colbert Turney Vice President of Engineering c: $0 File, Quality File.
FAXES g13-894-1538 913-888-9138 913-888-7563:913-599-0278 :913-888-0767. 913-888-8153 913-888-4837 913-312-3582 ACC,.JNTING ENGINEERING EzXECUTIVE=
HR INSID*- SALES MARKET*NG P'RC--IASINC OUAL'Ar-WE DELIVER QUALITY ON TIME Forr, 148a (02.11; c201 SORInc.
May 04 11 11:15a Roberta Chandler 913-312-3582 p.5 sorinc.com Process Instrumentation Pressure Level Temperature Flow 14E85 West 105th Street
-enexa, Kansas 66215-2003 913-888-2630 800-676-6794 Exelon Braidwood Generation Co. LLC Braidwood Warehouse East of IL Rt 53, 1-1/2 MiJes South of Rt 113 Braidwood IL 60408
Subject:
Evaluation of Deviation for Defect Report: Wire Conductor Crimping To whom it may concern:
This letter is sent to address an Evaluation of Deviation for Defect performed by SOR in response to a customer's incoming inspection concern on one switch received February 9, 2011. Please refer to the Information Notice dated May 2, 2011, attached.
PO 00468909 Rev 002 00468909 Rev 002 00468909 Rev 002 00468909 Rev 002 00468909 Rev 002 00468909 Rev 002 00468909 Rev 002 00468909 Rev 002 SOR SO 530094*1 530094*1 530094*1 530094*1 530094*1 530094*1 530094*1 530094*1 Model No.
20XRX-BX 125-U9-C7A-TTNQ 20XRX-BX125-U9-C7A-TTNQ 20XRX-BX125-U9-C7A-TTNQ 20XRX-BX1 25-U9-C7A-TTNQ 20XRX-BX1 25-U9-C7A-TTNQ 20XRX-BX1 25-U9-C7A-TTNQ 20XRX-BX1 25-U9-C7A-TTNQ 20XRX-BX1 25-U9-CTA-TTNQ 20XRX-BX125-U9-C7A-TTNQ 20XRX-BX 125-U 9-C7A-TTN Q Serial No.
101210699 101210700 101210701 101210702 101210703 101210704 101210705 101210706 101210744 101210745 Ship Date 01/12/2011 01/1212011 01/12!2011 01/1212011 01/12/2011 01/12/2011 01/12/2011 01/12/20t 1 02/14/2011 02/14!2011 00468909 Rev 002 530112*1 00468909 Rev 002 530112*1 Best regards, Colbert Turney'4 Vice President of Engineering c: SO File, Quality File.
FAXES 913-294-1538: 913-8,88-9138 :913-888-7563.
1-5J9--278 :913-828-0767 913-888-8150 913-888-4837 913-312-3582 ACCOJNTING ENGINEERING EXECUTIV,-
HR INSIDE SALES MARKETING PURC,-ASINC QUAt-Ir-T' WE DELIVER QUALITY ON TIME Fomrrt48'802.tAE cQ 20 SORpItc.
MaV 04 11 11:15a Roberta Chandler 913-312-3582 p.6 sorinc.com Process Instrumentation Pressure Level Temperature Flow 14685 West 105th Street - Lenexa, Kansas 66215-2003 913-888-2630 800-676-6794 Mr. Frangois LeFebvre Tractebel Suez Doel Nuclear Power Station Industrial & Nuclear Process Control Energy & Industrial Solutions Avenue Ariane 7-1200 Brussels Be[gium
Subject:
Evaluation of Deviation for Defect Report: Wire Conductor Crimping To whom it may concern:
This letter is sent to address an Evaluation of Deviation for Defect performed by SOR in response to a customer's incoming inspection concern on one switch received February 9, 2011. Please refer to the Information Notice dated May 2, 2011, attached.
PO P004 9900077799 P004 9900077799 P004 9900077799 P004 9900077799 P004 9900077799 P004 9900077799 P004 9900077799 SOR SO 519607*1 519607*2 519607*3 519607*4 519607*5 519607*6 519607*12 Qty 20 5
5 5
5 9
2 Model No.
6RX-WX5-U8-C2A-TFNQX 5RX-WX5-U8-C2A-TTNQX 9 RX-WX5-U8-C2A-1-INQX 54RX-WX1 18-M4-C2A-T-FNQX 12RX-WX5-UB-C2A-TTNQX 4RX-WX5-U8-C2A-TTNOX 5RX-WX5-U8-C2A-TTNQX Serial No.
100607174-100607193 100607194 - 100607198 100607199 -100607203 100607204 -100607208 100607209 -100607213 100607214 -100607222 100607223 -100607224 Ship Date 10/14/2010 10/1412010 10/14/2010 10/1412010 10/1412010 10/14/2010 10/1412010 Best regards, Colbert Turney Vice President of Engineering c: SO File, Quality File.
,=AXES 913-894-1539 91 3-888-91 38 : 913-888-7563 913-599-0278 913-888-0787 913-888-8150. 913-888-4837 913-312-3582 ACCLN I IN, LNIC-INLI-NtNG EXECCUTIVE HR INSC-DE *ALES MAR.KET NO PUI9C-4CISNG OVAL'"
WE DELIVER QUALITY ON TIME Form 1485 [02.11) c2011 SORInrc.