05/04/2011 U.S. NuclearRegulatory Commission OperationsCenter Event Report Page1 Part 21 (PAR) Event# 46821 Rep Org: SOR INC PROCESS INSTRUMENTATION Notification Date / Time: 05/04/2011 12:14 (EDT)

Supplier: SOR INC PROCESS INSTRUMENTATION Event Date / Time: 05/04/2011 (CDT)

Last Modification: 05/04/2011 Region: 4 Docket #:

City: LENEXA Agreement State: Yes County: License #:

State: KS NRC Notified by: COLBERT TURNEY Notifications: DAVID PROULX R4DO HQ Ops Officer: BILL HUFFMAN PART 21 GROUP Emergency Class: NON EMERGENCY MARK RING R3DO 10 CFR Section:

21.21 UNSPECIFIED PARAGRAPH PRESSURE SWITCH WITH POSSIBLE SUB-STANDARD ELECTRICAL LEAD TERMINATIONS SOR Process Instruments has determined that certain model pressure switches it has manufactured may have leads attached to the terminal blocks that are not in conformance with good manufacturing practice. The pressure switches in question may have lead wire attached to the terminal block in which the connection between the stripped, stranded wire and a crimped terminal may not be flush with the terminal end. SOR states that there have been no known field problems associated with this issue.

This condition applies to SOR model switches with terminal block "X" options 9013-737, 9013-747, 9013-7674.

SOR has provided this information to those customers that purchased these switches. The U.S. plants that received these switches are Braidwood and Duane Arnold.

'_j-re-j-1--

0a

Ma 04 11?11:14a Roberta Chandler 913-312-3582 p.1 DATE May 4, 2011 TO Nuclear Regulatory Commission FROM Colbert Turney, Vice President of Quality SUBJECT Information Notice No. Pages 6 (II ,,. i, lri - L-lJ * .

There have been no known field problems associated with this attached information notice.

All customers who have received switches with this option have been or will be notified today.

Please contact me if any other information or actions are necessary.

Colbert Tumey Vice President of Quality SOR Inc.

14685 W 1 0 51h Street Lenexa KS 66215 Toll Free: 800-676-6794 Voice: 913-888-2630 Extension: 913-956-3160 Fax: 913-312-3582 Process Instrumentation I Pressure I Level I Temperature 1 Flow 14685 West 105th Street I Lenexa, Kansas 66215-2003 913-888-2630 800-676-6794 WE DELIVER QUALITY ON TIME "

Form 1497 (02.11) C2011 SORh W.

Maý 04 11i11:15a Roberta Chandler 913-312-3582 p.2 Process Instrumentation Pressure Level. Temperature Flow sorinc.com 14685 West 105th Street Lenexa, Kansas 66215-2003 r 913-888-2630 800-676-6794 May 2, 2011 Nuclear Regulatory Commission via fax 301-816-5151 Nextera Energy, Duane Arnold Energy Center Exelon, Braidwood Generation Co. LLC Tractebel Suez, Doel Nuclear Power Station INFORMATION NOTICE Suboect:

This is an information notice regarding SOR pressure switches that have the electrical terminal block option. A condition of general good manufacturing practice has been brought to our attention in regards to the crimping of wire lugs onto lead wires in the SOR terminal block assembly. SOR allowed a switch to be shipped in which one of the three lead wires in this switch did not meet these criteria, see attached picture.

scope:

This information notice applies to SOR models with the terminal block "X" options, 9013-737, 9013-747 and 9013-764. An attachment identifies each switch by your P0 number, the SOR sales order number, SOR model number, SOR serial number and the ship date. This notice does not apply to SOR switches that have the SCR factory conduit seal "JJ" option.

Discussion:

Good manufacturing practice for creating a connection between a stripped, stranded wire and a crimped terminal suggests that the stranded wire be visible inside the lug after crimping. The wire may be flush with the end of the terminal or protruding out no more than 1/16". In one instance, one of the three wires on a terminal block did not have bare wires that were flush with the terminal end. We believe this was a random occurrence, however, we decided to bring this to your attention. In addition, all switches at SOR must pass a number of tests before they are released for shipment. All of these tests are documented by Production personnel and witnessed by Quality Control personnel. All pressure switches that are in your possession now have passed these tests. There have been no known field problems associated with this issue.

Customer Action:

At our customer's option, the subject products may be visually inspected and any wire connections that do not meet the noted criteria may be returned to SOR for rework. To return a switch, contact SOR for a Returned Material Authorization (RMA) number. SOR will pay freight and replace the terminal free of charge. If you decide to inspect the switches, SOR will send replacement cover gaskets. Please notify us if you wish to have gaskets shipped to you.

Preventative Action:

We have instituted improved procedures and training for Fabrication, Assembly and Inspection personnel to prevent future incidences.

I apologize for the inconvenience this may cause you.

ColbertTurney Vice President o %ality c: B Benton, J Fortino, J Modig, L Coutts, J Jursich FAXES 913-894-1538 :01l3-888-91 38. ,0l3-888-7563 c13-599-0278: 091 3-888-0767 9 913-888-81 50 , 913-8e8-4837 913-3-i2-3582 ACCOUNTING EN!NE.=-RING DECU.JTt',i -R INS DE. SALES MARKETING PUrZC?.-ASING OJAI.IFY WE DELIVER QUALITY ON TIME Form 1486,(02.11) c 20 I S1ORI Ic.

May 04 1i i 11: 15a Roberta Chandler 913-312-3582 p. 3 Information Notice May 2, 2011 Page 2 of 2 FAXES 913-894-1538 '913-888-9138 1 913-888-7563 I 913-599-0278 I 913-888-0767 913-ea8-8150 913-888-4837 F 913-312-3582 ACCOUi*NNG ENGINEERING ECUEtlE HR INSIDE SA.ES MARKETINO PURCHASI*N3G GU WE.DEUVER duALITY ON TIME Fornm1486 (02.11) C:2011SOR Inc.

May 04 11 11:15a Roberta Chandler 913-312-3582 p.4 Process Instrumentation Pressure Level Temperature Flow sorinc.com 14685 West 105-h Street Lenexa, Kenses 66215-2003 -1 3-888-2630 800-676-6794 Nextera Energy Duane Arnold Energy Center 3277 Daec Road Palo IA 52324

Subject:

Evaluation of Deviation for Defect Report: Wire Conductor Crimping To whom it may concern:

This letter is sent to address an Evaluation of Deviation for Defect performed by SOR in response to a customer's incoming inspection concern on one switch received February 9, 2011. Please refer to the Information Notice dated May 2, 2011, attached.

PO SOR SO Model No. Serial No. Ship Date K132576 517742*1 9013737 100405784 05/2812010 02259125 521918*1 9013737 100606117 07/20/2010 02261223 525222*1 9013737 100901789 09/2912010 02261223 529060*1 9013737 101201120 12103/2010 Best regards, Colbert Turney Vice President of Engineering c: $0 File, Quality File.

FAXES g13-894-1538 913-888-9138 913-888-7563:913-599-0278 :913-888-0767. 913-888-8153 913-888-4837 913-312-3582 ACC,.JNTING ENGINEERING EzXECUTIVE= HR INSID*- SALES MARKET*NG P'RC--IASINC OUAL'Ar-WE DELIVER QUALITY ON TIME Forr, 148a (02.11; c201 SORInc.

May 04 11 11:15a Roberta Chandler 913-312-3582 p.5 Process Instrumentation Pressure Level Temperature Flow sorinc.com 14E85 West 105th Street -enexa, Kansas 66215-2003 913-888-2630 800-676-6794 Exelon Braidwood Generation Co. LLC Braidwood Warehouse East of IL Rt 53, 1-1/2 MiJes South of Rt 113 Braidwood IL 60408

Subject:

Evaluation of Deviation for Defect Report: Wire Conductor Crimping To whom it may concern:

This letter is sent to address an Evaluation of Deviation for Defect performed by SOR in response to a customer's incoming inspection concern on one switch received February 9, 2011. Please refer to the Information Notice dated May 2, 2011, attached.

PO SOR SO Model No. Serial No. Ship Date 00468909 Rev 002 530094*1 20XRX-BX 125-U9-C7A-TTNQ 101210699 01/12/2011 530094*1 20XRX-BX125-U9-C7A-TTNQ 101210700 01/1212011 00468909 Rev 002 530094*1 20XRX-BX125-U9-C7A-TTNQ 101210701 01/12!2011 00468909 Rev 002 00468909 Rev 002 530094*1 20XRX-BX1 25-U9-C7A-TTNQ 101210702 01/1212011 00468909 Rev 002 530094*1 20XRX-BX1 25-U9-C7A-TTNQ 101210703 01/12/2011 00468909 Rev 002 530094*1 20XRX-BX1 25-U9-C7A-TTNQ 101210704 01/12/2011 00468909 Rev 002 530094*1 20XRX-BX1 25-U9-C7A-TTNQ 101210705 01/12/2011 530094*1 20XRX-BX1 25-U9-CTA-TTNQ 101210706 01/12/20t 1 00468909 Rev 002 00468909 Rev 002 530112*1 20XRX-BX125-U9-C7A-TTNQ 101210744 02/14/2011 00468909 Rev 002 530112*1 20XRX- BX 125-U 9-C7A-TTN Q 101210745 02/14!2011 Best regards, Colbert Turney'4 Vice President of Engineering c: SO File, Quality File.

FAXES 913-294-1538: 913-8,88-9138 :913-888-7563. 1-5J9--278 :913-828-0767 913-888-8150 913-888-4837 913-312-3582 ACCOJNTING ENGINEERING EXECUTIV,- HR INSIDE SALES MARKETING PURC,-ASINC QUAt-Ir-T' WE DELIVER QUALITY ON TIME Fomrrt48'802.tAE cQ 20 SORpItc.

MaV 04 11 11:15a Roberta Chandler 913-312-3582 p.6 Process Instrumentation Pressure Level Temperature Flow sorinc.com 14685 West 105th Street - Lenexa, Kansas 66215-2003 . 913-888-2630 800-676-6794 Mr. Frangois LeFebvre Tractebel Suez Doel Nuclear Power Station Industrial & Nuclear Process Control Energy & Industrial Solutions Avenue Ariane 7-1200 Brussels Be[gium

Subject:

Evaluation of Deviation for Defect Report: Wire Conductor Crimping To whom it may concern:

This letter is sent to address an Evaluation of Deviation for Defect performed by SOR in response to a customer's incoming inspection concern on one switch received February 9, 2011. Please refer to the Information Notice dated May 2, 2011, attached.

PO SOR SO Qty Model No. Serial No. Ship Date P004 9900077799 519607*1 20 6RX-WX5-U8-C2A-TFNQX 100607174- 100607193 10/14/2010 P004 9900077799 519607*2 5 5RX-WX5-U8-C2A-TTNQX 100607194 - 100607198 10/1412010 P004 9900077799 519607*3 5 9 RX-WX5-U8-C2A-1-INQX 100607199 -100607203 10/14/2010 P004 9900077799 519607*4 5 54RX-WX1 18-M4-C2A-T-FNQX 100607204 -100607208 10/1412010 P004 9900077799 519607*5 5 12RX-WX5-UB-C2A-TTNQX 100607209 -100607213 10/1412010 P004 9900077799 519607*6 9 4RX-WX5-U8-C2A-TTNOX 100607214 -100607222 10/14/2010 P004 9900077799 519607*12 2 5RX-WX5-U8-C2A-TTNQX 100607223 -100607224 10/1412010 Best regards, Colbert Turney Vice President of Engineering c: SO File, Quality File.