MONTHYEARML24022A0972024-01-22022 January 2024 Massachusetts Institute of Technology Change of Facility Backup Project Manager ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology IR 05000020/20232032023-11-21021 November 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023203 ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology IR 05000020/20232012023-10-12012 October 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023201 IR 05000020/20232022023-09-27027 September 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000020/2023202 ML23194A0412023-07-11011 July 2023 Mit Research Reactor - Duties of Reactor Superintendent ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML23094A1102023-03-30030 March 2023 Massachusetts Institute of Technology (Mit), Submittal of Annual Report for 2022, Technical Specification 7.7.1 ML23072A0242023-03-0707 March 2023 Mit, Nuclear Reactor Lab., Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor IR 05000020/20222012023-02-0707 February 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2022201 ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML22095A2412022-03-31031 March 2022 Annual Report for the Mit Research Reactor for the Period from January 1, 2021, to December 31, 2021 ML22062B0422022-02-10010 February 2022 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology IR 05000020/20212032021-11-0909 November 2021 Massachusetts Institutes of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2021203 IR 05000020/20212012021-09-30030 September 2021 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2021201 ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21165A1542021-05-28028 May 2021 Mit - Emergency Plan and Procedures, 10 CFR 50.54(q)(5) ML21140A3622021-05-17017 May 2021 Massachusetts Institute of Technology (Mit) - Supplement to Response to the Request for Additional Information for Battery Upgrade License Amendment Request (EPID: L-2021 -NFA-0000) ML21132A2512021-05-0606 May 2021 Massachusetts Institute of Technology, License No. R-37, Docket No. 50-20, Reportable Occurrence 50-20/2021-: Operation with Less than the Required Staffing on Site; NRC OPS Center Log EN 55212 ML21112A1672021-04-12012 April 2021 Massachusetts Institute of Technology - Physical Security Plan Revision Regarding Biometric Readers ML21105A3602021-04-0707 April 2021 Duties of Reactor Superintendent ML21099A1132021-03-31031 March 2021 Massachusetts Institute of Technology - Annual Report, Docket No. 50-20, License R-37, Technical Specification 7.7.1 ML21091A2082021-03-24024 March 2021 Mit Nuclear Reactor Lab - Response to Request for Additional Information for Battery Upgrade License Amendment Request ML21076A0232021-03-18018 March 2021 Requests for Additional Information - Related to License Amendment Request to Replace Emergency Power System Batteries ML21070A1852021-03-0202 March 2021 Mit Nuclear Reactor Laboratory, License Amendment Request Regarding Emergency Battery Surveillances in Technical Specification 4.6, Docket No. 50-20, License R-37 ML21063A2552021-02-25025 February 2021 Proposal for Conversion to Low Enriched Uranium (Leu), :Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML21036A0852021-02-19019 February 2021 Massachusetts Institute of Technology - Acceptance of License Amendment Request to Revise Surveillance Frequency During Extended Reactor Shutdown ML21035A2582021-01-29029 January 2021 Massachusetts Institute of Technology (Mit), Supplement to Technical Specifications Surveillance Frequency Definition Update for Improved Compliance Under 10 CPR 50.36(c)(3) ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20307A4202020-11-0505 November 2020 Granting of Extension Request to Supplement License Amendment to Revise Surveillance Requirement Frequency ML20304A1172020-10-19019 October 2020 Time Extension Request for LAR on Technical Specifications Surveillance Frequency Update for Improved Compliance Under 10 CFR 50.36(c)(3) for the Mit Research Reactor ML20248H5682020-09-22022 September 2020 Mit Research Reactor Routine Inspection Report with Enforcement Discretion (EA-20-109) - August 2020 ML20161A3342020-07-24024 July 2020 Massachusetts Institute of Technology - Issuance of Amendment NO.44 to Renewed Facility Operation License No. R-37 to Amend Technical Specifications Related to Level 1 Position Title Change ML20182A7092020-07-0909 July 2020 Acceptance Review Amendment Request to Revise Surveillance Frequency - Opportunity to Supplement ML20192A0762020-06-30030 June 2020 Mit - Supplemental Information for License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20070H2672020-06-0404 June 2020 Examination Report No. 50-020/OL-20-01, Massachusetts Institute of Technology ML20119A8272020-05-29029 May 2020 Massachusetts Institute of Technology - Issuance of Amendment No. 43 Extending Time to Implement License Amendment No. 42 to Facility Operating License No. R-37 ML20149K4142020-05-27027 May 2020 NRC LAR Extension Supplemental Letter 2020-05-27 ML20135H1882020-05-15015 May 2020 Massachusetts Institute of Technology - Exemption from Select Requirements of 10 CFR Part 55, Operators' Licenses ML20122A0622020-04-21021 April 2020 Massachusetts Institute of Technology, Regarding the, Amendment No. 42 to Renewed Facility Operating License No. R-37 for the Nuclear Safety System Digital Upgrade (Epdi No. L-2016-LLA-0003) ML20090E2272020-04-16016 April 2020 Massachusetts Institute of Technology - Acceptance of the Application for a License Amendment Level 1 Position Title Change ML20097B6932020-03-31031 March 2020 Amendment No. 42 to Renewed Facility Operating License No. R-37 Regarding the Nuclear Safety System Digital Upgrade (Epdi No. L-2016-LLA-0003) ML20097D2992020-03-27027 March 2020 Massachusetts Institute of Technology (Mit) - Annual Report for the Year 2019 ML20078J4852020-03-12012 March 2020 Massachusetts Institute of Technology (Mit), License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20055D3322020-02-18018 February 2020 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph IR 05000020/20192032020-01-15015 January 2020 Massachusetts Institute of Technology U.S. Nuclear Regulatory Commission Security-Related Inspection Report 05000020/2019203 2024-01-05
[Table view] Category:Licensee Event Report (LER)
MONTHYEARML1112504412011-04-29029 April 2011 Massachusetts Institute of Technology, Submits a Report of an Occurrence 50-20/2011-1; Operation Without the Core Purge Blower; NRC OPS Center Log # 46-783 2011-04-29
[Table view] |
Text
MIT NUCLEAR REACTOR LABORATORY AN MIT INTERDEPARTMENTAL CENTER John A. Bernard Mail Stop: NW12-208a Phone: 617 253-4202 Director of Reactor Operations 138 Albany Street Fax: 617 253-7300 Principal Research Engineer Cambridge, MA 02139 Email: Bemardj@mit.edu April 29, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Room Washington, DC 20555 Re: Massachusetts Institute of Technology; License No. R-37; Docket No. 50-20; Reportable Occurrence 50-20/2011-1: Operation without the Core Purge Blower; NRC OPS Center Log # 46-783
Dear Sir or Madam:
The Massachusetts institute of Technology hereby submits a report of an occurrence at the MIT Research Reactor (MITR) in accordance with paragraph 7.7.2 of the Technical Specifications. An initial report was made by telephone to the U.S. Nuclear Regulatory Commission Headquarters Operations Center on 25 April 2011.
The format and content of this report was based on Regulatory Guide 1.16, Revision 1.
- 1. Report No. 50-20/2011-1; Ops Center No.46-783 2a. Report Date: 29 April 2011 2b. Date of Occurrence: 20 April 2011
- 3. Facility MIT Nuclear Reactor Laboratory
- 4. Identification of Occurrence:
For a period of 50 minutes the reactor was operated without the core purge blower.
Technical Specification No. 3.3.2 requires that the reactor power be lowered to less than 100 kW if the air space above the core is isolated for more than five minutes. Isolation of this space occurs if the core purge blower is tripped on high radiation.
Nuclear Regulatory Commission Reportable Occurrence 50-20/2011-1 April 29, 2011 Page 2 of 3
- 5. Condition Prior to Occurrence:
The reactor was operating normally at 5.5 MW. The on-duty shift personnel (senior operator and operator on console) were conducting tests of an off-site reactor alarm system in accordance with an approved written procedure.
- 6. Description of Occurrence:
At 2230 the senior operator, who was stationed outside the reactor containment building for purposes of the test, directed that the console operator turn down the high level trip on the sewer monitor in order to generate a "High Radiation" alarm. This alarm is in turn transmitted off-site, and hence its receipt can be used to verify operability of the off-site alarm system. The sewer monitor is employed for this purpose because it is used very infrequently during the year.
The operator inadvertently turned down the trip of the core purge radiation monitor instead of the sewer monitor. This generated a "Low Flow Core Purge" alarm and a "High Radiation Core Purge" alarm but not the intended "High Level Radiation" alarm. The console operator acknowledged these two alarms, but did not recognize that they were not the expected ones. The "High Radiation Core Purge" alarm was cleared by resetting its trip. However, the blower was not restarted. (Note: The "Low Flow Core Purge" alarm and "High Radiation Core Purge" alarm, although both associated with the core purge blower, are located in different sections of the reactor's three-part annunciator panel.) The senior operator assumed that the operator had turned down the sewer monitor's trip and that for some reason it had not generated the desired off-site alarm. Accordingly, the senior operator directed that the console operator use an area radiation monitor to generate the "High Level Radiation" alarm. The operator did so and acknowledged its alarm. This time, the off-site alarm was received. The operator then reset the trip of the area radiation monitor and cleared the "High Level Radiation" alarm. The senior operator continued with the rest of the procedure for testing the off-site alarms. At 2320, the procedure was completed. The senior operator returned to the control room, noted that the core purge blower was off, and restarted same.
- 7. Description of Apparent Cause of Occurrence The immediate cause of this occurrence was human error. A related cause is that, while the core purge blower is equipped to alarm on low flow, there is no scram on a low flow core purge condition.
- 8. Analysis of Occurrence:
There was no abnormal release of radioactive particulates as a result of the core piurge blower's being off. Determination of the possible H 2 concentrations in the air space above the core is currently pending.
Nuclear Regulatory Commission Reportable Occurrence 50-20/2011 -1 April 29, 2011 Page 3 of 3
- 9. Corrective Action:
Corrective action consists of the following:
a) Retraining of the on-duty console operator. (Action completed by 04/27/11.)
b) Installation of a scram function on the core purge blower. The system will now alarm (as it does now) on loss of flow. If flow is not restored within two minutes, a second alarm will occur. If flow remains off for an additional two minutes, a scram will occur. (Action completed by 04/27/11.)
- 10. Failure Data None.
Sincerely, Thomas H. Newton, Jr., Ph.D, PE Edward S. Lau, NE Associate Director, Engineering Superintendent for OperationsA&Maintenance MIT Research Reactor MIT Research Reactor 0 A. Bernard, PhýPE, CHP Director of Reactor Operations MIT Research Reactor cc: MITRSC USNRC - Senior Project Manager Research and Test Reactors Branch A Division of Policy and Rulemaking Office of Nuclear Reactor Regulation USNRC - Senior Reactor Inspector Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation