ML11123A011

From kanterella
Jump to navigation Jump to search
Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 9
ML11123A011
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 04/21/2011
From: David Helker
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, NRC/FSME
References
Download: ML11123A011 (3)


Text

Exekrn.

Exelon Nuclear www.exeloncorp.com 200 Exelon Way Nulea-Kennett Square, PA 19348 SAFEGUARDS INFORMATION 10 CFR 50.54(p)(2) 10 CFR 50.4(b)(4)

April 21, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Peach Bottom Atomic Power Station, Unit 1 Facility Operating License No. DPR-12 NRC Docket No. 50-171

Subject:

Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 9 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGC) is submitting Revision 9 to the Peach Bottom Atomic Power Station (PBAPS) Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (Security Plan). The changes to the PBAPS Security Plan were implemented on March 10, 2011. In accordance with 10 CFR 50.5 4(p)(2), EGG is submitting this change within 60 days of implementation (i.e.,

no later than May 09, 2011).

The PBAPS Security Plan has been revised to add reference to the decommissioned PBAPS Unit 1 facility, consistent with Appendix A of the PBAPS Unit 1 Technical Specifications contained in the Decommisioning Plan and Safety Analysis Report (DPSAR).

EGC has concluded that the changes do not decrease the safeguards effectiveness of the PBAPS Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program.

ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION 3

) /

UPON SEPARATION FROM ATTACHMENT 1, THIS DOCUMENT IS DECONTROLLED.

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission April 21, 2011 Page 2 contains Safeguards Information. Therefore, EGC requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (a)(1)(i), and 10 CFR 73.21, "Requirements for the protection of safeguards information," paragraph (b)(1)(i).

If you have any questions or require additional information, please contact Doug Walker at 610-765-5952.

Respectfully, David P. Helker Mnaager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1.

Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 9 (Contains Safeguards Information) cc:

Regional Administrator - NRC Region I (w/attachments)

SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission April 21, 2011 Page 3 bcc:

Sr. Vice President, Mid-Atlantic Operations Sr. Vice President, Operations Support Vice President, Engineering Site Vice President, PBAPS Plant Manager, PBAPS Director, Operations, PBAPS Director, Security Manager, Site Security, PBAPS Director, Site Training, PBAPS Manager, Regulatory Assurance, PBAPS Manager, Licensing - KSA3-E D. Walker - KSA3-E Commitment Coordinator - KSA 3-E Records Management - KSA 1-N-1 w/o attachments 11 SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED