Honorable Herman E. Talmadge United States Senate

Dear Senator Talmadge:

Thank you for your recent communication forwarding Mrs. Pat Oreszko's recent letter to you; we appreciate having the opportunity to comment on it.

The nuclear power plant which is of concern to Mrs. Oreszko is the Bellefonte Nuclear Plant which the Tennessee Valley Authority is proposing to build in Jackson County, Alabama, about six miles northeast of Scottsboro. As proposed, the plant would use two pressurized water reactors, each having a capacity of about 1300 megawatts electric.

The AEC's Regulatory Staff has begun its safety and environ mental reviews of the TVA application and it is expected that these reviews will be completed in about a year. On the basis of its safety review, the Staff will make its determination as to whether the proposed plant can be built and operated safely at the planned site.

During its environmental review, the Staff will assess the total environmental impact which would be associated with construction and operation of the proposed plant and assess the impact in terms of the available alter natives and the benefits which would be derived, such as meeting an urgent need for power.

Beyond these-reviews, the safety aspects of TVA's application must be reviewed by a group of independent experts called the Advisory Committee on Reactor Safeguards and a public hearing must be held to consider both safety and environmental matters.

The hearing will be conducted by an independent, three-man Atomic Safety and Licensing Board. Only after all these reviews are completed can a final determination be reached as to whether a construction permit should be issued or the application denied.

As an early step in the public hearing process, a prehearing conference has been scheduled for November 1 in Scottsboro-,

The purpose of this prehearing conference is to:

permit

.Sentp

-~AY~

AAA))L

2' Honorable Herman E. Talmadge

-2 identification of the key issues in the proceeding; take steps necessary for further identification of the issues; consider all petitions to intervene; and establish a schedule for further actions in the proceeding, including the evidentiary hearing itself.

The safety and environmental reviews and the hearing process are discussed in more detail in the two enclosed pamphlets -

"Federal Regulation of Nuclear Power Plants" by the AEC's Director of Regulation L. Manning Muntzing and "Step-by-Step Procedure in AEC Licensing of Nuclear Power Reactors."

Nuclear power plants have been used to produce electricity for close to 20 years now and totally have achieved an enviable safety record of more than 175 reactor years of operating experience without injuring a member of the public.

One of the reasons for this excellent safety record is the fact that it has long been recognized that nuclear power plants must be subjected to rigid safety standards. Therefore, we believe that nuclear power can play an increasingly important role as one of the safe, environmentally-compatible means of helping to meet this-country's growing energy requirements.

We agree fully that it is very important to research and develop as many alternate energy sources as possible and, at the same time, to place a heavy emphasis on conservation of energy. Further, it is true that it is technically and economically feasible to use solar energy to heat and cool houses and geothermal energy is being used to generate electricity on a small scale. However, the technical and economic feasibility of using these methods to generate electricity on a large scale has yet to be proved and, in addition, the long-range environmental impacts remain to be investigated.

In closing, we would like to point out that Mrs. Oreszko's comments regarding Aliquippa, Pennsylvania, probably result from charges by Dr. Ernest Sternglass that operation of the Shippingport reactor near Aliquippa has resulted in an increase in infant mortalities in that area. These charges were in vestigated by the Environmental Protection Agency, as well as the AEC, and were found to have no basis in fact. In addition, the Commonwealth of Pennsylvania has held public hearings to consider the charges but has yet to report on its findings.

S Honorable Herman E. Talmadge We hope that this information will be helpful to you in replying to Mrs. Oreszkop however, if you do need additional information, please let us know. In the meantime, as you requested, we are returning her letter to you.

Sincerely, Sfrnei J0ohin A. Harris John A. Harris, Director Office of Information Services

Enclosures:

1. "Federal Regulation..."
2. "Step-by-Step Procedure..."
3. Letter fm Mrs. Pat Oreszko dated September 24, 1973 bcc:

OCR (3)

G.Ertter (DR-6266)

D. K. Davis, L:RP W. D. Paton, OGC J. A. Harris, OS lob OOFICE DIS O I 0

OIS OCR SURNAM I --------

M JJF 10/

SURN ME

-- V-


--------- -( ----------------------

DATE 10 3

-10/

/73 10/

/73 10/

/73_

GPO c43-16-81465-1 445-678 Form AEC-318 (Rev. 9-53) AECM 0240

muM

~TO reeL CONTIR@L NUMIEER.

-266 DATE OF DOCUMENT anesse (Esse talism ACTION PROCESSING DATES Acknowledged Interim Reply Finao/

J1 m

DESCRI PTION Zitv 19 Originl

[I Copy

[ Other

  1. 6*t'ttU U

4ds 10610 VW 021#11A OW AU REFERRED TO DATE IS NOTLFICATION TO THE JCAE RECOMMENDED?

Cys: ~bmrn DIRECTOR OF REGULATION COMMUNICATIONS CONTROL ILtE LOCATONT ACTION COMPLETION DEADLINE btll/fs PREPARE FOR SIGNATURE OF:

Chairman Director of Regulation REMARKS Wt-"4 Form HQ-32 (1-73)

USAEC Al"Allift ""111111111"s vith Ir"ly

I-r~ um FILE LOCATION CONTROL NUMBER 6266 DATE OF DOCUMENT ACTION COMPLETION DEADLINE I211 TO ACTION PROCESSING DATES PREPARE FOR SIGNATURE OF:

Acknowledged Chairman Interim Reply Director of Regulation Fina DESCRIPTION t

EOrigi c O Copy Jther REMARKS ast1st4@Mrs Me aeeeesCol"

  • 0*1, ft" - Opp*s$"Wtratnae wt el vW man tat 09 n'a r geneV 1a t ea
  • e ettat*r

, AWs (Sellelease 1 & 2) 187 REFERRED TO DATE IS NOTIFICATION TO THE JCAE RECOMMENDED?

Cys:

amkt Flies) $843s AR

)s*0439 DIRECTOR OF REGULATION COMMUNICATIONS CONTROL Form HQ-32 (1-73)

USA EC FILE LOCATION A

FROM so.

-~ IL Swam DATE OF DOCUMENT SUSPENSE DATE I

4 CLA SSIFICATION Series:

Copy of OriginalLi Other DESRIPION CoyU ENCLOSURES A

I REFERRED TO DATE RECEIVEDBY DATE PPAE BY INGRAM CONC.

BY SIGMD HRMIS W0D. 1 /1.7113 DATE RECEIVED I

~-

FILE CODE CONTROL NUMBER 18 7 7 REPLY DATES SPECIAL INSTRUCTIONS Acknowledge Oi Appropriate Handling Interim Final Oi PREPARE FOR SIGNATURE OF:

L CHAIRMAN P.,)O F)CED.aE;J.,

El GENERAL MANAGER El Oi ASST. GENERAL MANAGER REMARKS:

INFORMATION COPIES SENT TO:

l CHAIRMAN l

GENERAL MANAGER l

l n

L I

1

-1 1__

FORM HQ-284 (4-68)

GENERAL MANAGER'S COMMUNICATIONS CONTROL U. S. ATOMIC ENERGY COMMISSION

FROM ems l

04 DATE OF DOCUMENT SUSPENSE DATE mvt"Wi F1LEt DATE RECEIVED TO CLASSIFICATION REPLY DATES SPECIAL INSTRUCTIONS Series:

Acknowledge E

Appropriate Handling Copy _of Interim Final OD DESCRIPTION:

~

EN Original El Copy E3 Other PREPARE FOR SIGNATURE OF:

MOW-AW&W 4 4068M

[I M

O CHAIRMAN JD'.OEFICE DIRE.TOR A41 MUialfA AM MMAR M J"-

E GENERAL MANAGER Ol Ol ASST. GENERAL MANAGEER REMARKS:

ENCLOSURES REFERRED TO DATE RECEIVEDBY DATE cos. i$M00 INFORMATION COPIES SENT TO:

SIGNED DM W

929. 1 7/173 O CHAIRMAN O GENERAL MANAGER El El OOM O028 GENERAL MANAGER'S COMMUNICATIONS CONTROL U. S. ATOMIC ENERGY COMMISSION FORM HQ-284 (4-68)

I CONTROL NUMBER 18767

~POOP 0111 NO Aw 11108110f DATE OFT DAEEEIE SUSPERSELAOTE DATE RECEIVED I

awemr=

I

  • k I

-i_________________________

CLAS slitA7O N Series:

I Copy of DESCRIPTION:

Original O copy 0

Other ENCLOSURES wS REFERRED TO DATE RECEIVEDBY DATE raras Y

ISr?a eeftc. I 0=1 SUM RAlS MTa._10/17173 REPLY DATES SPECIAL INSTRUCTIONS Acknowledge O Appropriate Handling Interim Final O

PREPARE FOR SIGNATURE OF:

O CHAIRMAN DIV./OFFICE DIRECTOR O GENERAL MANAGER El El ASST. GENERAL MANAGER REMARKS:

INFORMATION COPIES SENT TO:

El CHAIRMAN El GENERAL MANAGER El El El El I _________________________________________

FORM NO.284 FORMHO-284 (4-68)

GENERAL MANAGER'S COMMUNICATIONS CONTROL U. S. ATOMIC ENERGY COMMISSION I

CONTROL NUMBER 1 RTR7 F-ILETCYDE~

FROM

~

DATE OF DOCUMENT DATE RECEIVED

_____________________________ ~

~T~; ~r~z F ILE CODE SUSPENS Eii CLASSIFICATION Series:

Copy of DESCRIPIlON

~ ~

Original El Copy U Other 1~

DECRPTON Orgia F cop Other

  • a "tW&a w

1111111 ft o*

O ENCLOSURES REFERRED TO DATE RECEIVED BY DATE pU?*aJ

]a 1Sh I

I I _______

I CONTROL NUMBER 18767 REPLY DATES SPECIAL INSTRUCTIONS Acknowledg a

El Appropriate Handling Interim Final O

PREPARE FOR SIGNATURE OF:

O CHAIRMAN QVJOFF.ICE DIRECTOR O GENERAL MANAGER O

El ASST. GENERAL MANAGER REMARKS:

INFORMATION COPIES SENT TO:

El CHAIRMAN O GENERAL MANAGER Ol El El O

FORM MQ-254 (4-68)

GENERAL MANAGER'S COMMUNICATIONS CONTROL U. S. ATOMIC ENERGY COMMISSION FILE-C CTDE'-

Rec'd Off. Dir Date rime 6 2 6 G 0

Respectfully referred to:

Congressional Liaison Atomic Energy Commission Washington, D.C.

Because of the desire of this office to be responsive to all inquiries and communications, your consideration of the attached is requested. Your findings and views, in duplicate form, along with return of the enclosure, will be appreciated by U.S.S.

Form #2

Tl A 0

t iL-0 eq 0, ILI toc 7~flJ4 J~~

Q-~~

~

nF

Yl AZ W

L/

ar4

.to AA 4

~~L p