ML11110A020

From kanterella
Jump to navigation Jump to search
Transcript of 10 CFR 2.206 Petition Vermont Yankee Conference Call, April 12, 2011, Pages 1-25
ML11110A020
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 04/12/2011
From:
NRC/OCM
To:
References
NRC-839
Download: ML11110A020 (27)


Text

Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION

Title:

10 CFR 2.206 Petition RE Vermont Yankee Docket Number: (n/a)

Location: (telephone conference)

Date: Tuesday, April 12, 2011 Work Order No.: NRC-839 Pages 1-25 7ORIGINAL NEAL R. GROSS AND CO., INC.

Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.

Washington, D.C. 20005

. (202) 234-4433

1 1 UNITED STATES OF AMERICA 2 NUCLEAR REGULATORY COMMISSION 3 . . . . .

4 10 CFR 2.206 PETITION REVIEW BOARD (PRB) 5 CONFERENCE CALL 6 RE 7 VERMONT YANKEE 8 . . . . .

9 TUESDAY 10 APRIL 12, 2011 11 12 The conference call was held, Melanie Galloway, 13 Chairperson of the Petition Review Board, presiding.

14 PETITIONER: MICHAEL MULLIGAN 15 PETITION REVIEW BOARD MEMBERS 16 MELANIE GALLOWAY, Deputy Director, Division of License 17 Renewal, NRR 18 JAMES KIM, Petition Manager for 2.206 19 Petition, NRR/Division of Operating Reactor 20 Licensing 21 ANDREA RUSSELL, Petition Coordinator, NRR/Division of 22 Policy and Rulemaking 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202)

  • o 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

2 NRC HEADQUARTERS STAFF:

NANCY SALGADO, Branch Chief, NRR/Division of Operating Reactor Licensing NRC REGION I STAFF:

THOMAS SETZER, Division of Reactor Projects ALSO PRESENT:

JIM DEVINCENTIS, Entergy Nuclear Vermont Yankee NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrg ross.com

3 1 P RO C E E D I NG S 2 8:59 a.m.

3 MR. KIM: Good morning. I'd like to thank 4 everybody for attending this meeting. My name is 5 James Kim and I'm the Vermont Yankee Project Manager.

6 We are here today to allow the Petitioner, 7 Mr. Michael Mulligan, to address the Petition Review 8 Board regarding to 2.206 petition dated March 25, 9 2011.

10 I'm the Petition Manager for the petition.

11 The Petition Review Board chairperson is Melanie 12 Galloway.

13 As part of the Petition Review Board, 14 review of this petition, Mr. Michael Mulligan has 15 requested this opportunity to address the PRB.

16 This meeting is scheduled from 9 to 10 17 a.m. The meeting is being recorded by the NRC 18 Operations Center and will be transcribed by a court 19 reporter. The transcript will become a supplement to 20 the petition. The transcript will also be made 21 publicly available.

22 I'd like to open this meeting with 23 introductions. As we go around the room, please be 24 sure to clearly state your name, your position, and 25 the office that you work for within the NRC for the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

4 1 record. I'll start off.

2 This is James Kim. I'm a Project Manager 3 for the Division of Operator Reactor Licensing in NRR.

4 MS. SALGADO: I'm Nancy Salgado. I'm the 5 Branch Chief in the Division of Operator Reactor 6 Licensing in NRR.

7 MS. RUSSELL: Andrew Russell, Division of 8 Policy and Rulemaking 2.206, Division Coordinator.

9 MS. GALLOWAY: I'm Melanie Galloway. I'm 10 the Deputy Director of the Division of License Renewal 11 in NRR.

12 MR. KIM: At this time are there any NRC 13 participants from the headquarters on the phone?

14 (No response.)

15 Are there any NRC participants from the 16 Regional Office on the phone?

17 MR. SETZER: Yes, hi. Good morning. This 18 is Tom Setzer. I'm a Senior Project Engineer in 19 Region I.

20 MR. KIM: Are there any representatives 21 for the licensee on the phone?

22 MR. DEVINCENTIS: Yes. This is Jim 23 Devincentis of Entergy Nuclear Operations.

24 MR. KIM: Mr. Mulligan, would you please 25 introduce yourself for the record?

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

5 1 MR. MULLIGAN: I'm Mike Mulligan and I was 2 a licensed operator at Vermont Yankee and I'm a 3 whistleblower on a lot of issues other than nuclear 4 power, but mainly nuclear power.

5 MR. KIM: Thank you. It is not required 6 for the members of the public to introduce themselves 7 for this call. However, if there are any members of 8 the public on the phone that wish to do so at this 9 time, please state your name for the record.

10 (No response.)

11 Hearing none, I'd like to emphasize that 12 we each need to speak clearly and loudly to make sure 13 that the court reporter can accurately transcribe this 14 meeting. If you have something you would like to say, 15 please first state your name for the record.

16 For those dialing into the meeting, please 17 remember to mute your phone to minimize any background 18 noise or distractions. If you do not have a mute 19 button, this can be done by pressing the keys *6 . To 20 unmute, press the *6 keys again. Thank you.

21 At this time, I'll turn it over to the PRB 22 Chairperson Melanie Galloway.

23 MS. GALLOWAY: Good morning. Welcome to 24 this meeting regarding the 2.206 petition submitted by 25 Mr. Mulligan.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v

6 1 I'd like to first share some background 2 information on our process. Section 2.206 of Title X 3 of the Code of Federal Regulations describes the 4 petition process, the primary mechanism for the public 5 to request enforcement action by the NRC in a public 6 process. This process permits anyone to petition NRC 7 to take enforcement-type action related to NRC 8 licensees or licensed activities. Depending on the 9 results of its evaluation, NRC could modify, suspend, 10 or revoke an NRC-issued license or take any other 1i appropriate enforcement action to resolve the problem.

12 The NRC staff's guidance for the 13 disposition of 2.206 petition request is in Management 14 Directive 8.11 which is publicly available.

15 The purpose of today's meeting is to give 16 the Petitioner, Mr. Mulligan, an opportunity to 17 provide any additional explanation or support for the 18 petition before the Petition Review Board's initial 19 consideration and recommendation.

20 A few points to note: this meeting is not 21 a hearing, nor is it an opportunity for the Petitioner 22 to question or examine the PRB on the merits or the 23 issues presented in the petition request. No 24 decisions regarding the merits of this petition will 25 be made at this meeting.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

7 1 Following this meeting, however, the 2 Petition Review Board will conduct its internal 3 deliberation and the outcome of this internal meeting 4 will be discussed with the Petitioner, Mr. Mulligan.

5 The Petition Review Board typically consists of a 6 chairperson, usually a manager at the Senior Executive 7 Service level at the NRC. It has a Petition Manager 8 and PRB Coordinator. Other members of the Board are 9 determined by the NRC staff based on the content of 10 the information in the petition request.

11 At this time, I would like to introduce 12 the Board. As Mr. Kim already noted, my name is 13 Melanie Galloway. And for this petition, I am the 14 Petition Review Board Chairperson. Mr. Jim Kim is the 15 Petition Manager for the petition under discussion 16 today and Ms. Andrea Russell is the Office's PRB 17 Coordinator. Our technical staff includes Mr. Thomas 18 Setzer from NRC Region I's Division of Reactor 19 Projects.

20 As described in our process, the NRC staff 21 may ask clarifying questions of Mr. Mulligan in order 22 to better understand his presentation and to reach a 23 reasoned decision whether to accept or reject his 24 request for review under 2.206 process.

25 At this point, I would like to summarize NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

8 1 the scope of the petition under consideration and the 2 NRC activities to date. On March 25, 2011, Mr.

3 Mulligan submitted to the NRC a petition under 2.206 4 in which he expressed a concern on the following 5 nuclear plant safety systems at Vermont Yankee that he 6 described in his petition as non-testable. The first 7 one is the automatic depressurization system or ADS, 8 the main steam safety relief system. The second one 9 is the Vernon tie. The third is the service water 10 system and RHR system tie and the emergency cooling 11 tower cell which is the backup cooling system for the 12 emergency diesel generators. The fourth is the 13 alternate shutdown outside the control room, that is, 14 the Vernon tie inside of the service water RHR cross-15 connect. And the fifth one is the emergency core 16 cooling system functional test at every outage.

17 In this petition request, Mr. Mulligan 18 made several requests of NRC. The first, he requested 19 all non-testable safety systems be immediately tested 20 or the plant shutdown. Second, Mr. Mulligan requested 21 an outside the NRC investigation of this NRC behavior 22 for tolerating this atrocious regulatory behavior.

23 Third, he requested that top Vermont Yankee management 24 staff be fired and replaced before startup. Fourth, 25 Mr. Mulligan requested that Entergy's corporate NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

9 1 nuclear senior staff be fired and replaced before the 2 restart of the plant. Fifth, he requested the 3 formation of a local, public oversight panel around 4 every nuclear power plant. Sixth, Mr. Mulligan 5 requested an emergency NRC senior official oversight 6 panel with the aims of reforming the reactor oversight 7 process. Seventh, he requested a national NRC 8 oversight panel of outsiders to oversee and report on 9 the Agency's activities. And he further suggested 10 that there should be a mix of professional, academic 11 people and capable lay people. Eighth, Mr. Mulligan 12 stated that there is some heavy duty and exceedingly 13 numerous findings of problems with Entergy plants 14 during this inspection reporting cycle and that there 15 should be an analysis of why this is occurring. And 16 last, Mr. Mulligan requested a list of non-testable 17 nuclear safety systems countrywide.

18 Not let me summarize the NRC activities to 19 date. On March 31st of 2011, Mr. Mulligan requested 20 an opportunity to address the Petition Review Board by 21 telephone which is the purpose of today's call. On 22 April 5th of 2011, the Petition Review Board met 23 internally to discuss the request for immediate action 24 of emergency shutdown of Vermont Yankee. The PRB 25 denied the request for immediate action because there NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

10 1 was no immediate safety concern to the plant or to the 2 health and safety of the public. On April 5, 2011, 3 Mr. Mulligan was informed of the PRB's decision on the 4 immediate action.

5 Now as a reminder for phone participants, 6 please identify yourself if you make any remarks, as 7 this will help us in the preparation of the meeting 8 transcript that will be made publicly available.

9 Thank you.

10 At this point, Mr. Mulligan, I'll turn it 11 over to you to allow you an opportunity to provide any 12 information that you believe the Petition Review Board 13 should consider as part of your most recent petition.

14 Mr. Mulligan?

15 MR. MULLIGAN: Wow, another chairman? I 16 welcome that it's the first time the PRB, a female, 17 was a chairman and I welcome that, this. I haven't 18 seen this before and it's a good thing.

19 Anyway, non-testable safety system is 20 generally -- both systems are papier-mache systems.

21 They're generally systems that aren't tested to their 22 function. They might be minimally tested. Parts of 23 it might be tested. The holistic system is never 24 tested, that type of thing.

25 Like I said, I've been saying these NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

11 1 problems with these nuclear plants never come from a 2 tsunami or an equipment failure. It's a people 3 failure. It's a communications failure. We misuse 4 language. We start to use language more to hide 5 things than to disclose things, that type of thing.

6 And we get into -- it just builds and builds and we 7 essentially start turning off safety systems, either 8 we flip a switch or we use less quality in the 9 components. And we essentially turn off safety 10 systems one by one until we get into a lot of trouble.

11 In 1992, to go back shortly, I talked 12 about this in the recent Palisades 2.206, but I had 13 issues with fuel pool pump intermittent short on a 14 fuel pool pump. They had a requirement to shift on 15 the reactor in 30 days. They didn't have an on-site 16 spare for the motor and then everybody started playing 17 word games and they caution-tagged the breaker and 18 then they danger-tagged the breaker. And everybody 19 was afraid to call it in-op, as it was. I mean we 20 didn't have any engineering proof of the 21 uncertainty gaming I've talked about. We didn't have 22 any proof really of the condition of the motor. I 23 mean they made assertions from -- Vermont Yankee made 24 assertions of the conditions of the motor. There was 25 a short in it, but they didn't have any proof that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

12 1 they called it intermittent short. And then they 2 danger-tagged it, but they wouldn't call it in on.

3 And so, you know, there's essentially 4 language games. We play games with words and language 5 and that got me to make the complaint to the governor, 6 as I explained. I mean they didn't have an on-site 7 motor to replace it. And so we played around for a 8 year until finally, you know, I made my complaint. We 9 got an investigation about that.

10 Generally, I said that Vermont Yankee was 11 heading for problems. We're going to have an accident 12 that we're going to have a lot of equipment failures.

13 We're going to have a trip, a simple trip, and we're 14 going to be confused by a set of equipment failures.

15 A year later, I was up in License Training, they were 16 getting ready to take my license from me. And I got 17 a call and they said Mike, we had an accident at the 18 plant and we need you to come down for overtime. And 19 that was the accident essentially that I predicted.

20 We had -- they were taking shortcuts out in the 21 switchyard. They were trying to replace a switchyard 22 power supply and protection system batteries. I guess 23 they got -- had issues with the batteries and finally 24 were forced to replace them. They should have 25 replaced them during the outage. They didn't.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

13 1 And we're up at power and they basically 2 what ended up -- they ended up supplying -- there was 3 two sides of the safety circuits for the switchyard 4 and they cross-connected them, as insane at that 5 sounds. And then they tried to power them from one 6 charger, from one battery charger.

7 An operator disconnected the second 8 battery thing and of course the battery charger went 9 wild and the battery charge in itself was in a 10 degraded state, unknown state, with diode problems, 11 stuff like that. They had all sorts of warnings in 12 the past about these charges could go bad and stuff 13 like that and they never took action to correct them.

14 I mean that's just another symptom of the 15 problem with the defective equipment and so the power 16 surge knocked out all the breakers in the switchyard.

17 There was a loss of off-site power. I believe it was 18 like maybe 12 to maybe 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> later on before we 19 regained power into the plant. We were on the diesel 20 generators, the diesel generators at -- they had a 21 valve that was out of position. They discharged both 22 these generators -- they went into a common header and 23 the valve was throttled and they never thought about 24 that throttling that valve would have consequences 25 when there was excess -- well, excess or surface water NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

14 1 flow needed to supply the diesel generators.

2 Mind boggling group of problems. Really 3 not equipment problems, but people problems and stuff, 4 like we all know besides diesel generators, to 5 increase the flow of the diesel generators, a surface 6 water flow to diesel generators, we know what happened 7 if we had a LOOP or a LOCA when we would have needed 8 torus cooling and if there had been additional flow 9 into that throttle valve and stuff like that.

10 I mean that LOOP was kind of an amazing 11 accident. When it was all said and done with, I 12 actually talked to my friends in the media and Vermont 13 Yankee was playing games with disclosure of what was 14 going on. It's just a terrible environment to be in 15 when everybody is hiding stuff, and they're afraid to 16 talk about what the problems and all that sort of 17 stuff and to the outsiders. It's just a terrible 18 environment when really these complicated 19 bureaucracies, what is needed is accurate 20 communications and freedom to say what you want.

21 And when it was all said and done, they 22 had the state engineer in the media talking about the 23 burning time and he was talking about oh well, even 24 though we had diesel generator power and if we didn't 25 have it, we'd always go to the tie. And at the time, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

15 1 the tie was never tested. I mean there was no testing 2 whatsoever and again, that was -- these systems like 3 this, at that time was a ghost system, a papier-mache 4 system, you know. There was no proof, evidence that 5 that -- that it would work, that we would have 6 capability to get on a tie. Of course at that time, 7 DBPS owned it, Vermont Yankee and the dam which 8 doesn't happen now. But anyway -- that's when we all 9 became exposed to the delusional, these mirage systems 10 that are designed really not to do a function other 11 than be talking points to people, favorable to the 12 nuclear industry.

13 And again, those kind of systems, you 14 know, when we talked about them to ourselves, we'd say 15 what are the chances of those, we're going to be able 16 to get that right and stuff? Again, the question is, 17 well, with the tie working is an issue, but the other 18 issue is what does it do to everybody? What does it 19 do the conscience of the employees when they know that 20 some of these systems, how we know about operations 21 and how equipment works and stuff like that, you know.

22 And how problems get hidden inside for some and you 23 don't see them and the only way you discover them is 24 when you start banging equipment around and using 25 them. And so that's how I became aware of how we have NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

16 1 these systems that are designed for talking points, 2 really not designed to protect the plant.

3 The Vernon tie, put in new cables. They 4 test them a little bit, but again, they really don't, 5 they don't -- the only way you really test it would 6 be, you know, probably now they scheduled it and 7 nobody gets surprised like in an accident. One day, 8 bang, something happens and you know, the Vernon 9 station or distant control rooms for the Vernon 10 station, you know, they get the call and it actually 11 becomes tested.

12 The fire system is another one of these 13 ghost systems when you really get down to it. It's 14 a backup means beyond design type of thing to cool the 15 core. And again, you sit there and say well, okay, 16 another time turning the fire system into an ECCS 17 system in the most vulnerable position the plant can 18 be in when all the safety systems have been stripped 19 from them and they only had one system left and it 20 really doesn't have the quality of nuclear safety 21 system. It has additional standards of quality, but 22 it doesn't meet the quality of an ECCS system and 23 stuff.

24 It's just these sub-standard, sub-quality 25 systems that people should be concerned about. I NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

17 1 think it's immoral and stuff, that damages the 2 employees in one way. It damages the culture of the 3 employees and it's questionable whether that the RHR 4 service waters system, I imagine they don't -- when I 5 was there they didn't do a real-life test.

6 When I was there, they used to have --

7 they had problems with -- I forget what it was, the 8 inlet or outlet, but they had -- mud would form down 9 there at the pipes and it was clogged for many years.

10 And it wouldn't work, type of thing.

11 The RHR service water forced the closed 12 system and it cools diesel generators and it cools 13 torus cooling, if necessary. And you know, I don't 14 think -- I just think that the public needs to have a 15 higher level of quality with those kind of backup 16 systems. You just can't have backup systems with less 17 quality and less training and you end up -- you say 18 well, I have all these backup systems so all the 19 front-line safety systems, you justify well, RHR is 20 down today, but because we have so many backup 21 systems, it doesn't really matter what the RHR system 22 does or defects it has in it. It ends up creating 23 this justification system where you tolerate a lot of 24 defects and you tolerate, you discover defects and you 25 make consequences to it. So you tolerate more defects NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

18 1 in these complex systems.

2 So really the RHR service water cross-3 connect, why wasn't there -- I know it would be 4 traumatic for the plant to actually shift to that, but 5 you should at least do it once and periodically. You 6 say you have simulators, simulator testing on that and 7 everybody knows that the simulator almost sets you up 8 for a non-official environment. The simulator could 9 have fidelity issues. There's no -- you simulate 10 people running around, I imagine, and stuff like that, 11 but I don't think -- you don't actually test equipment 12 and open up valves, that are open. You don't get that 13 time, that real time -- it takes so long for not being 14 able to run out, to open up a valve or -- those 15 systems should be automatic. You should be able to 16 push a button, really, and everything aligns up in a 17 right way. And you know, the control the system like 18 that. You should -- what are we doing nowadays, 19 having these backup systems that are never tested that 20 are clunky and aren't automated. And it doesn't eat 21 up shift resources.

22 And you know, you get into events -- if 23 you're in a fire and someplace else in the plant and 24 then you're going to go on RHR, service water RHR 25 cross-connect. I mean, how many people have you got NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

19 1 on the site?

2 When I made my complaint to the Vermont 3 governor, one of the issues was I didn't think we were 4 -- with alternate shutdown procedure outside the 5 control room, I didn't think we could -- that system 6 would work. We didn't have enough people. I was 7 thinking and I got into that investigation on that, 8 When I made that complaint to the governor and stuff, 9 so I've always had problems with this alternate 10 shutdown business. I always thought it was too 11 complicated. Nobody ever tested it. We got a lot of 12 panels out there, RCIC, locally, and connected to the 13 release, locally, you know, that sort of stuff.

14 You know, we have the technology nowadays 15 and we should be able to -- if we say we're going to 16 have a safety system, then we should be able to test 17 it. We should be able to do that. And it's more than 18 having the equipment there. It's people testing it 19 over and over again and you are getting all the bugs 20 out of it and that type of thing. So you really don't 21 end up with very many surprises when the big boom 22 happens, you know. You know what I'm saying?

23 To get back to the Vernon tie, everybody 24 knows that last -- the first time that I had a 25 petition on that, shortly after that, the NRC went NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

20 1 through the alternate shutdown system and they found 2 a flaw in the main feed pumps on that trip. And they 3 dinged Vermont Yankee on that. That's kind of 4 surprising in this late stage of the game that the NRC 5 would find a flaw with all those extremely trained 6 employees at Vermont Yankee and all the people with 7 the degrees and all that sort of stuff. You'd think 8 they'd scrub the alternate shut-down procedure 9 perfectly clean. You know? And there wouldn't be a 10 flaw in it and stuff.

11 You know, those different things that you 12 discover, you know, if you're able to test the system, 13 you can have a bunch of people on site and as you cool 14 down the reactor and stuff like that you get into 15 trouble. You got extra people to help you out and 16 stuff, but you know, I just think that that that's the 17 philosophy, the big philosophy in nuclear industry 18 where they have diverted to these ghost systems, you 19 know, that don't really, aren't really tested that 20 much and there"s not much confidence they will work 21 with the employees and stuff.

22 And it's more used to calm the public that 23 we have more than we really have type of thing. That 24 bothers me.

25 Injecting boron into the vessel. Has NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202)f 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com v

21 1 anybody ever actually done that? Although that's a --

2 has that actually shut down a large reactor? I don't 3 think so. I've never -- we've never seen the proof.

4 The F system that powers the reactor coolant valves 5 and stuff like that, have you ever had an actual test 6 on that of system conditions?

7 In 9/11, there's all these systems and 8 procedures in 9/11. You know, how are we to know that 9 these are additional ghost systems or papier-mache 10 systems? It's done to calm the people outside the 11 plant and not actually systems, real systems that will 12 work. Who vets those systems? Who sits there with 13 their skeptical eye and tries to find holes in it?

14 Those are the security issues that I've had. When it 15 gets right down to it, you use security to hide ghost 16 systems or they're used to carry -- protect the 17 public. And that's what it gets down to, you know?

18 The language gaming and the word gaming and -- how do 19 we know that you're not using language to con us, to 20 talk to us? How do we know that we're not using 21 security as another tool to hide plant problems?

22 That's what it comes down to. That's one of the 23 greatest sins I think you could commit if you 24 undermine the issues around potential terrorism and 25 stuff like that. If you use security -- we know that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

22 1 in TVA, up in their refuel, they showed us images of 2 those hoses that were connected up to -- the header of 3 these stand-by systems and stuff.

4 One moment, they're security and nobody 5 talks about it. The next moment, when people get into 6 trouble, when the industry has a black eye, everybody 7 starts showing the stuff a year ago a super secret.

8 It doesn't really make sense to me anyway. People 9 playing around and saying they're doing one thing and 10 having -- saying they're following rules and security 11 is a secret, a responsibility. The next minute 12 they're just throwing these things out to try and save 13 themselves. It just doesn't make sense.

14 (Pause.)

15 The myth was that in old days as the 16 industry was developing --

17 MS. GALLOWAY: Mr. Mulligan?

18 MR. MULLIGAN: Yes.

19 MS. GALLOWAY: Is now an appropriate time 20 ask you if any individuals on the phone have any 21 clarifying questions of you?

22 MR. MULLIGAN: Can I just have one more 23 minute?

24 MS. GALLOWAY: Sure.

25 MR. MULLIGAN: The myth was in the old NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

23 1 days, you know, that the NRC controlled the utilities.

2 They used the rules and regulations to control the 3 utilities, campaign contributions, and politics have 4 twisted this around and so the rules and policies are 5 not there to patrol the utilities. They're there to 6 control the NRC and to control the NRC inspectors and 7 stuff. So there's been a shift with this deregulation 8 business and putting the -- making the inspectors 9 hamstrung by following the rules and not using the 10 rules to control the behavior of the utilities.

11 Now I'm done.

12 MS. GALLOWAY: Thank you for comments, Mr.

13 Mulligan. And at this time I'd like to ask if there's 14 any staff at headquarters that has any questions for 15 Mr. Mulligan?

16 Seeing none, is there any questions from 17 our regional representative, Mr. Setzer?

18 MR. SETZER: No questions from the region, 19 thank you.

20 MS. GALLOWAY: Does the licensee 21 representative have any questions?

22 MR. DEVINCENTIS: No, Entergy has no 23 questions.

24 MS. GALLOWAY: Okay. We didn't get an 25 acknowledgement that were any members of the public on NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

24 1 the phone, but I am going to ask at this time if there 2 do happen to be any members of the public they may 3 provide comments regarding the petition and ask 4 questions about the 2.206 petition process. However, 5 as noted at the beginning of the meeting, the purpose 6 of the meeting is not to provide an opportunity for 7 the Petitioner or the public to question or examine 8 the Petition Review Board regarding the merits of the 9 petition request.

10 So are there any questions from any 11 members of the public on the process?

12 Hearing none, I would like to take this 13 opportunity to thank Mr. Mulligan for taking his time 14 to provide the NRC staff with this information on the 15 petition that's been submitted. And before we close, 16 does the court reporter need any additional 17 information for the meeting transcript?

18 COURT REPORTER: Hello, this is the court 19 reporter. I did have one question. One of the things 20 mentioned in the petition was the Vernon tie or 21 burning tie, what was that phrase?

22 MS. GALLOWAY: Vernon tie, V-E-R-N-O-N.

23 COURT REPORTER: And tie, just T-I-E?

24 MS. GALLOWAY: Correct.

25 COURT REPORTER: Okay, thank you, Ms.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

25 1 Galloway.

2 MS. GALLOWAY: Sure. And with that this 3 meeting is concluded and we will be terminating the 4 phone connection at this point and continuing with our 5 deliberations regarding the petition as discussed at 6 the beginning of the call.

7 Thank you all very much.

8 (Whereupon, at 9:39 a.m., the conference 9 call was concluded.)

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

CERTIFICATE This is to certify that the attached proceedings before the United States Nuclear Regulatory Commission in the matter of: Vermont Yankee Name of Proceeding: 10 CFR 2.206 Petition of Michael Mulligan Docket Number: (n/a)

Location: (teleconference) were held as herein appears, and that this is the original transcript thereof for the file of the United States Nuclear Regulatory Commission taken by me and, thereafter reduced to typewriting by me or under the direction of the court reporting company, and that the transcript is a true and accurate record of the foregoing proceedings.

,K la Ga i o icialveporter Neal R. Gross & Co., Inc.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com