EDO Principal Correspondence Control FROM:
DUE: 05/04/11 EDO CONTROL: G20110273 DOC DT: 04/11/11 FINAL REPLY:
Representative Lois Capps Chairman Jaczko FOR SIGNATURE OF :
ROUTING:
Delay License Renewal Application for Diablo Canyon Nuclear Power Plant (EDATS: SECY-2011-0234)
Borchardt Weber Virgilio Ash Muessle OGC/GC
- Leeds, NRR Collins, RIV
- Burns, OGC
- Schmidt, OCA DATE: 04/15/11 ASSIGNED TO:
EDO CONTACT:
Rihm SPECIAL INSTRUCTIONS OR REMARKS:
Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179).
NRR and Region IV to provide input to Roger Rihm,
- OEDO, if required.
Roger Rihm to coordinate response with OGC and OCA.
TetIoefSUUq-/-
I7 CjTs'
- bS.,eo?_/ -0O
EDATS Number: SECY-2011-0234 Source: SECY Genra Inomtn Assigned To: OEDO OEDO Due Date: 5/4/2011 11:00 PM Other Assignees:
SECY Due Date: 5/6/2011 11:00 PM
Subject:
Delay License Renewal Application for Diablo Canyon Nuclear Power Plant
==
Description:==
CC Routing: NRR; RegionIV; OGC; OCA ADAMS Accession Numbers - Incoming: NONE Response/Package: NONE Ohr Infomaio Cross Reference Number: G20 110273, LTR-I 1-0214 Related Task:
File Routing: EDATS Staff Initiated: NO Recurring Item: NO Agency Lesson Learned: NO OEDO Monthly Report Item: NO Proes Inoraion Action Type: Letter Priority: Medium Sensitivity: None Signature Level: EDO Urgency: NC Approval Level: No Approval Required OEDO Concurrence: YES OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region IV to provide input to Roger Rihm, OEDO, if required. Roger Rihm to coordinate response with OGC and OCA.
)
Docmen Infraio Originator Name: Representative Lois Capps Originating Organization: Congress Addressee: Chairman Jaczko Incoming Task Received: Letter Date of Incoming: 4/11/2011 Document Received by SECY Date: 4/14/2011 Date Response Requested by Originator: NONE Page 1 of l
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Apr 15, 2011 13:55 PAPER NUMBER:
ACTION OFFICE:
LTR-11-0214 EDO LOGGING DATE: 04/12/2011 AUTHOR:
AFFILIATION:
ADDRESSEE:
SUBJECT:
ACTION:
DISTRIBUTION:
LETTER DATE:
ACKNOWLEDGED SPECIAL HANDLING:
REP Lois Capps CONG-Gregory Jaczko Concerns PG&E's request that the NRC delay its license renewal application for the Diablo Canyon nuclear power plant Signature of EDO RF, OCA to Ack 04/11/2011 No NOTES:
FILE LOCATION:
ADAMS 05/06/2011 DATE DUE:
DATE SIGNED:
EDO -- G20110273
,LOIS CAPPS 23RD DISTRICT, CALIFORNIA DISTRICT OFFICES:
El[
1411 MARSH STREET, SUITE 205 SAN Luis Osispo, CA 93401 2231 RAYSURN HOUSE OFFICE BUILDING (805) 546-8348 WASHINGTON, DC 20515-0522 (202) 225-3601 www.capps.house.gov El 301 EAST CARRILLO STREET, SUITE A SANTA BARBARA, CA 93101 TCongrezz of tje niteb btateg (805)730-1710 ENERGY AND COMMERCE El 2675 NORTH VENTURA ROAD, SUITE 105 ioCuoCt of Repregentatibue PORT HUENEME, CA 93041 (805) 985-6807 April 11, 2011 The Honorable Gregory B. Jaczko Chairman U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Dear Chairman Jaczko:
Earlier today Pacific Gas and Electric Company requested the Nuclear Regulatory Commission delay its license renewal application for the Diablo Canyon Nuclear Power Plant.
While I am continuing to study the specifics of PG&E's letter to the Commission, I want to reiterate my earlier request that this process be halted until a number of questions around seismic issues are answered.
I continue to believe there is simply no need to rush through this relicensing process until federal and state regulators have all the information they need to ensure Diablo Canyon can be run safely and is prepared to deal with the inevitable seismic activity our area is known for.
Since the existing 40-year licenses for the plant's two reactors do not expire until 2024 and 2025, there is more than enough time to adequately address seismic concerns in a thoughtful and transparent manner, so the full spectrum of information on which to base critical decisions on the plant's future operations and safety are addressed.
The people of the Central Coast deserve to know that everything is being done to ensure their health and safety as it relates to the operations at Diablo Canyon. Therefore, I reiterate my request for the Commission to halt the license renewal application process until comprehensive, independent analyses of seismic studies are done and that they be considered as part of the relicensing process.
We simply must have a thorough understanding of both the underlying seismic issues and the steps needed to avoid and/or respond to a potential earthquake event at Diablo Canyon prior to granting PG&E a license to run the plant until nearly the middle of this century.
I look forward to your response.
L oSS CAPPS Member of Congress PRINTED ON RECYCLED PAPER