April 18, 2011 LICENSEE: EXELON GENERATION COMPANY, LLC.

FACILITY: PEACH BOTTOM NUCLEAR POWER STATION

SUBJECT:

SUMMARY

OF APRIL 13, 2011, ANNUAL ASSESSMENT MEETING WITH EXELON GENERATION COMPANY, LLC.

On April 13, from 1:00 pm to 2:00 pm, an Annual Assessment Meeting was conducted at the Peach Bottom Atomic Power Station in Delta, Pennsylvania, between the Nuclear Regulatory Commission (NRC) and the Exelon Generation Company, LLC. (Exelon). The NRC requested the meeting with Exelon management to discuss the NRC=s assessment of the safety performance of their Peach Bottom Nuclear Power Station for the calendar year 2010. The NRC also conducted an Annual Assessment meeting with the Public at the Peach Bottom Inn in Delta, Pennsylvania from 6:00 pm to 8:00 pm the same day.

The NRC presented and discussed its assessment of the safety performance of Peach Bottom for the period between January 1 through December 31, 2010. The NRC presentation included information on the Reactor Oversight Process (ROP), the results of NRC=s performance assessment for Peach Bottom, and a presentation about United States nuclear plant safety in light of recent events in Japan.

Public attendees were offered the opportunity to communicate with the NRC regarding Exelon=s performance at Peach Bottom and the role of the agency in ensuring safe plant operations.

Questions from the public were addressed by the NRC.

The NRC=s assessment letter can be found in ADAMS with an Accession Number of ML110620331. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML110910108. The NRC slides can be located in ADAMS with an Accession Number of ML111080095. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Public Meeting Sign in Sheet

2 Name Organization Darrell Roberts Nuclear Regulatory Commission (NRC)

Paul Krohn Nuclear Regulatory Commission (NRC)

Fred Bower Nuclear Regulatory Commission (NRC)

Wayne Schmidt Nuclear Regulatory Commission (NRC)

Andrew Rosebrook Nuclear Regulatory Commission (NRC)

Pam Henderson Nuclear Regulatory Commission (NRC)

Neil Sheehan Nuclear Regulatory Commission (NRC)

Members of the Public on Sign-in Sheet.

2 April 18, 2011 LICENSEE: EXELON GENERATION COMPANY, LLC.

FACILITY: PEACH BOTTOM NUCLEAR POWER STATION

SUBJECT:

SUMMARY

OF APRIL 13, 2011, ANNUAL ASSESSMENT MEETING WITH EXELON GENERATION COMPANY, LLC.

On April 13, from 1:00 pm to 2:00 pm, an Annual Assessment Meeting was conducted at the Peach Bottom Atomic Power Station in Delta, Pennsylvania, between the Nuclear Regulatory Commission (NRC) and the Exelon Generation Company, LLC. (Exelon).

The NRC requested the meeting with Exelon management to discuss the NRC=s assessment of the safety performance of their Peach Bottom Nuclear Power Station for the calendar year 2010. The NRC also conducted an Annual Assessment meeting with the Public at the Peach Bottom Inn in Delta, Pennsylvania from 6:00 pm to 8:00 pm the same day.

The NRC presented and discussed its assessment of the safety performance of Peach Bottom for the period between January 1 through December 31, 2010. The NRC presentation included information on the Reactor Oversight Process (ROP), the results of NRC=s performance assessment for Peach Bottom, and a presentation about United States nuclear plant safety in light of recent events in Japan.

Public attendees were offered the opportunity to communicate with the NRC regarding Exelon=s performance at Peach Bottom and the role of the agency in ensuring safe plant operations. Questions from the public were addressed by the NRC.

The NRC=s assessment letter can be found in ADAMS with an Accession Number of ML110620331. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML110910108. The NRC slides can be located in ADAMS with an Accession Number of ML111080095. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution J. Clifford, DRP F. Bower, DRP, SRI W. Dean, RA P. Krohn, DRP N. Lafferty, DRP, RI D. Lew, DRA W. Schmidt, DRS S. Schmitt, DRP, OA D. Roberts, DRP A. Rosebrook, DRP E. Torres, DRP SUNSI Review Complete: PGK (Reviewer=s Initials)

DOCUMENT NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 11\2010 EOC\AAM NOTICES\

PBAPS 2010 AAM

SUMMARY

REV1.DOCX After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE R1/DRP R1/DRP NAME ARosebrook/ PGK for PKrohn/ PGK for DATE 04/18 /11 04/18 /11 OFFICIAL RECORD COPY