MONTHYEARML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML22305A5152022-02-22022 February 2022 EN 56192 - Grand Gulf Nuclear Station Re Elevation Outer Containment Personnel Airlock Door Failed Its Technical Specification Leakage Test ML21225A0812021-08-0404 August 2021 Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 M210077, GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors2021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors ML21168A2172021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors ML21014A2342020-12-0707 December 2020 Fourth Interim Notification Per 10 CFR Part 21 Re Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20366A0472020-11-18018 November 2020 Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 M200087, GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients2020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients ML20176A4322020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19101A0972019-04-0404 April 2019 Weir Valves & Controls USA, Inc. Part 21 Written Notification - Event Number: 53973 - 24 Class 150 Globe Alve for RHRSW HX Isolation MOV, E1150F068B at Detroit Edison - Fermi, Unit 2, Experienced Two Stem Failures ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18354A7422018-12-0404 December 2018 Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML17313A4712017-11-0303 November 2017 Part 21 - Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Interim Report ML17212A6282017-07-24024 July 2017 Lake Engineering Co. - Potentially Degraded Snubber SF1154 Hydraulic Fluid Second - Interim Notification Per 10 CFR Part 21 ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17090A3982017-03-27027 March 2017 Engine Systems, Inc. - Part 21 Report Regarding Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16194A1992016-05-25025 May 2016 Azz/Nli - Update - Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML15159A5682015-04-30030 April 2015 Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14265A0492014-09-12012 September 2014 Amendment to Part 21 Report from Abb, Inc Re Deviation of K-Line Circuit Secondary Close Latch (Event #50371) ML14237A1212014-08-15015 August 2014 Notification of Potential Part 21 Re Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14134A0792014-05-0808 May 2014 Part 21 - Potential Defect in NUS-710DU Trip Unit to Produce a Valid Trip Output Signal ML14139A2592014-05-0808 May 2014 10 CFR Part 21 Report Notification, NUS710DU Trip Units ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13284A0842013-10-0303 October 2013 Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302 ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12177A0562012-06-21021 June 2012 Part 21 - Reliability Degradation of Resistors in Trip Units and Readout Assemblies 2023-03-07
[Table view] Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] |
Text
I EE ES NGINE SYSTEMS, INC.
175 Freight Road Telephone: 252/977-2720 Rocky Mount, NC 27804 Fax: 252/446-1134 April 5, 2011 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
10CFR21 Reporting of Defects and Non-Compliance -
Engine Systems, Inc. Report No. 10CFR21-0100, Rev. 1 EMD Water Pump, P/N 8324589
Dear Sir:
The enclosed report addresses a revision to reportable notification for an EMD water pump, P/N 8324589. The report has been revised to address the safety hazard which is created or could be created by this defect.
A copy of the report has been mailed to all users with safety related EMD Diesel engines.
Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134) within 10 working days after receipt.
Yours very truly, ENGINE SYSTEMS, INC.
e40-Susan Woolard 4e'4741 Document Control Please let us know if ANY of your mailing information changes - name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above.
RECEIVED:
93 DATE:
Quality Performance With Pride
I-A ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount, NC 27804 Telephone: 2521977-2720 Fax: 252/446-1134 Report No. 10CFR21-0100 Rev. 0: 04/26/10 Rev. 1: 03/30/11 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: EMD water pumps SYSTEM: EMD Emergency Diesel Generator - jacket water system CONCLUSION: Reportable in accordance with 10CFR21.
Prepared By: Date: 3/.3 0/11
, Engineering Manager Reviewed By: Date: 3 "_ /__ -
Quality Assurance Manager Quality Performance With Pride
Report No. 10CFR21 -0100 Record of Revisions Page: 1 of 1 REV DATE IPAGE I DESCRIPTION 0 04/26/10 Initial issue.
1 03/30/11 1 Under Summary, 2 nd paragraph, added the last 2 sentences to address the safety hazard which is created or could be created by this defect.
Report No. 10CFR21-0100 Revision: 1 Date: 03/30/11 Page: 1 of 4 COMPONENT:
EMD water pump P/N 8324589
SUMMARY
Engine Systems Inc. (ESI) began a 10CFR21 evaluation on 03/23/10 following a corrective action request from Entergy - Grand Gulf. The request was written as the result of Grand Gulf having an EMD jacket water pump (P/N 8324589, S/N 96M1464V) with an incorrect impeller.
Specifically, the impeller installed in the pump was for rotation opposite of the pump housing. ESI supplied the jacket water pump to Grand Gulf in January 1997. ESI does not know if the pump has been in storage since that time or if any rework activities have been performed on the pump.
The evaluation was concluded on 04/26/10 and was determined to be a reportable defect as defined by 10CFR21. Installation of the incorrect impeller would result in considerable loss of engine cooling water flow. This would cause elevated engine cooling water temperature that could impact engine performance and/or load carrying capability with the possibility of eventual engine failure, thereby preventing the emergency diesel generator from performing its safety related function.
DISCUSSION:
EMD diesel engines utilized for emergency diesel generator sets use two engine jacket water centrifugal pumps (one for each bank) to circulate fluid throughout the engine for cooling. Each pump is mounted on the front of the engine and rotates in the opposite direction of the engine crankshaft. For single engine generator set applications (i.e. left hand rotation engine, viewed from the rear of the engine), the pumps used on each bank contain identical components; the only difference is the position of the impeller housing in relation to the pump shaft housing. When viewed from the front of the engine, these water pumps rotate counterclockwise (see Figure 1 below).
For tandem generator set applications, one engine is left hand rotation and the other is right hand rotation. For each engine, the pumps used on each bank contain identical components and the only difference is the position of the impeller housing in relation to the pump shaft housing.
However, for a right hand rotation engine the water pumps rotate clockwise when viewed from the front of the engine (see Figure 2 below).
)" .i* b*.-'- ;t, Z -
Right Bank Left Bank Right Bank Left Bank Figure 1 Figure 2 Water Pumps for LH Rotation Engine Water Pumps for RH Rotation Engine
Report No. 10CFR21 -0100 Revision: 1 Date: 03/30/11 Page: 2 of 4 It was reported by Grand Gulf that "while troubleshooting low Div III DJ jacket water pressure it was discovered that the wrong impeller was supplied in the P81C007A pump. The supplied impeller was intended to rotate in the opposite direction as the pump rotation. This appears to be the cause of low jacket water pressure in the A engine."
Subsequently, the water pump was returned to ESI for further inspection. It was apparent from a visual inspection that the incorrect impeller was installed for this pump. P/N 8324589 corresponds to a right hand rotation, left bank water pump for use on a 12-cylinder EMD 645E4 or E4B engine.
As shown in Photos 1 and 2 below, the housing corresponds to a right hand rotation pump, but the impeller is for left hand rotation. Figure 3 shows the correct impeller for a right hand rotation pump.
coew 0112TATI IMPELLER R.H. ROTATION Photo 1: Water Pump Returned by Customer ROTATIO:
(note impeller fin orientation)
..-..-- a Figure 3: Correct Housing and Fin Orientation for RH Rotation Photo 2: Close-up of Water Pump (note impeller fin orientation)
Report No. 10CFR21 -0100 Revision: 1 Date: 03/30/11 Page: 3 of 4 EVALUATION OF PREVIOUS SHIPMENTS:
A review has been performed to evaluate the impact on past supply of EMD water pumps.
Historically, ESI has supplied a quantity of over 280 water pumps under 17 different EMD part numbers dating back to 1988. The pump returned by the customer was supplied in January 1997.
After reviewing the history of dedication activities performed on the water pumps it was found that dedication reports for EMD water pumps have always contained an inspection requirement to verify the correct operational rotation; however reports written prior to 2000 did not include a clear visual depiction of what the correct operational rotation is. It appears that this was an isolated incident where the inspector made an error when performing the inspection. Since April 2000, all EMD water pumps shipped were inspected to a dedication report that included a clear visual depiction of proper impeller geometry. This one incident is the only known instance of an EMD water pump with the incorrect impeller.
As noted above, ESI supplied this water pump in 1997. Since that time ESI is unaware if any rework or refurbishment activities have been performed on the pump but it was noted that paint had chipped off the heads of the capscrews, indicating that the screws had been removed at some time. There exists a possibility that the pump impeller may have been previously removed.
AFFECTED USERS:
Based on the above review of previous EMD water pump shipments, it appears that this was an isolated incident. However, there exists the potential that an incorrect impeller was installed in an EMD water pump supplied by ESI prior to April 2000. Therefore, this notification is applicable to all users with safety related EMD diesel engines.
CORRECTIVE ACTION:
ESI recommends that as a precaution, all customers with an EMD water pump in stock which was supplied by ESI prior to April 2000 should perform a visual inspection to ensure the correct impeller is installed. A pump which has been installed on the diesel engine is considered acceptable based on successful operation of the diesel engine. The impeller inspection is easily performed, without disassembly, by looking into the inlet port of the pump to confirm the orientation of the impeller matches the pump housing. A listing of the various part numbers supplied prior to April 2000 is included in Table 1. Figures 4 and 5 contain visual guidance to ensure the impeller corresponds to the installed pump housing.
Report No. 10CFR21 -0100 Revision: 1 Date: 03/30/11 Page: 4 of 4 Part Number Rotation Bank Type of Engine 40004235 LH RIGHT 16 & 20-645E4 & E4B 40004234 LH LEFT 16 & 20-645E4 & E4B 8347607 LH LEFT 16 & 20-645E4 & E4B 8364236 RH RIGHT 16 & 20-645E4 & E4B 8364237 RH LEFT 16 & 20-645E4 & E4B 8269664 LH RIGHT 12-645E4 & E4B 9336390 LH LEFT 12-645E4 & E4B 8269638 LH LEFT 12-645E4 & E4B 8324588 RH RIGHT 12-645E4 & E4B 8324589 RH LEFT 12-645E4 & E4B Table 1: Listing of Water Pump P/Ns Supplied Prior to April 2000 cew. IN
-ROTATIO IMP LER R.H. OTATION PUMP HSNG. R .H.. ROTATION Figure 4: Correct Housing and Fin Figure 5: Correct Housing and Fin Orientation for LH Rotation Orientation for RH Rotation