ML111010506

From kanterella
Jump to navigation Jump to search
Comment (33) of Melanie & David Winters, Opposing South Texas Project Units 1 & 2 Relicensing
ML111010506
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/30/2011
From: Winters D, Winters M
- No Known Affiliation
To:
Rulemaking, Directives, and Editing Branch
References
76FR5410 00033
Download: ML111010506 (1)


Text

/~3/ ~/

7~

March 30, 2011

'ýD FT 1_0 C")

To: U.S. Nuclear Regulatory Commission It Is our request that the re-licensing of South Texas Project Reactors 1 & 2 be halted for an additional twenty years because of the following:

-the risks of an accident, fires, or explosions at one or more reactors at the site could increase with aging reactors;

-safer, cleaner alternative ways to generate the same power exist today and should be used. Studies have found that enery efficiency and renewable energy sources, which are abundant in Texas, could replace the power generated by these two old nuclear reactors;

-these reactors consume vast quantities of water use, largely from the Colorado River, water that is needed for drinking water, livestock and farming;

-and there is no adequate solution for radioactive waste, so it makes no sense to continue generating more.

Thank you for your consideration Our community wants to ensure that our environment is as safe as it possibly can be.

Melanie and David Winters 5 &'/U5 2

~-/ -~9 /~7~