Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. Section/Page 2.4-166 Hydrologic Engineering Through 2.4-247
ML110871539
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/15/2011
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML110871539 (82)


Text

WATTS BAR WBNP-103 Figure 2.4-30 thru Figure 2.4-40 Are Not Used HYDROLOGIC ENGINEERING 2.4-166

WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK 2.4-167 HYDROLOGIC ENGINEERING

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-103 Figure 2.4-40a Main Plant Site Grading And Drainage System For Flood Studies Sheet 1 HYDROLOGIC ENGINEERING 2.4-168

WATTS BAR WBNP-103 Figure 2.4-40a Deleted by Amendment 101 HYDROLOGIC ENGINEERING 2.4-169

WATTS BAR WBNP-103 Figure 2.4-40a Deleted by Amendment 101 HYDROLOGIC ENGINEERING 2.4-170

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-103 Figure 2.4-40b Main Plant General Plan HYDROLOGIC ENGINEERING 2.4-171

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-103 Figure 2.4-40c Yard Site Grading and Drainage System For Flood Studies HYDROLOGIC ENGINEERING 2.4-172

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-103 Figure 2.4-40d-1 Main Plant Plant Perimeter Roads Plan and Profile Sheet 1 HYDROLOGIC ENGINEERING 2.4-173

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40d Main Plant Plant Perimeter Roads Plan and Profile - Sheet 2 WBNP-103 2.4-174

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40d Main Plant Plant Perimeter Roads Plan and Profile - Sheet 3 WBNP-103 2.4-175

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40e Access Highway TVA DWG 1001H202 R4 - Sheet 1 WBNP-103 2.4-176

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40e Access Highway TVA DWG. 1001H201 R4 - Sheet 2 WBNP-103 2.4-177

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-103 Figure 2.4-40f Main Plant Main Plant Tracks Plan - Sheet 1 HYDROLOGIC ENGINEERING 2.4-178

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40f Main Plant Main Plant Tracks Sections & Profiles - Sheet 2 WBNP-103 2.4-179

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40f Main Plant Main Plant Tracks Sections & Profiles - Sheet 3 WBNP-103 2.4-180

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-103 Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 1 HYDROLOGIC ENGINEERING 2.4-181

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 2 WBNP-103 2.4-182

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 3 WBNP-103 2.4-183

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40h Probable Maximum Precipation Point Rainfall WBNP-103 2.4-184

WATTS BAR WBNP-103 Figure 2.4-40i Deleted by Amendment 83 HYDROLOGIC ENGINEERING 2.4-185

WATTS BAR WBNP-103 Figure 2.4-40j Deleted by Amendment 83 HYDROLOGIC ENGINEERING 2.4-186

WATTS BAR WBNP-103 Figure 2.4-40k Deleted by Amendment 83 HYDROLOGIC ENGINEERING 2.4-187

WATTS BAR WBNP-103 Figure 2.4-40L Deleted by Amendment 83 HYDROLOGIC ENGINEERING 2.4-188

WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK HYDROLOGIC ENGINEERING 2.4-189

WATTS BAR WBNP-103 Figure 2.4-41 thru Figure 2.4-60 Are Not Used HYDROLOGIC ENGINEERING 2.4-190

WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK 2.4-191 HYDROLOGIC ENGINEERING

WATTS BAR WBNP-103 Figure 2.4-61 Watts Bar Probable Maximum Flood Water Levels Before and After Embankment Failure HYDROLOGIC ENGINEERING 2.4-192

2.4-193 WATTS BAR Figure 2.4-62 Relative Bore Height (After J. J. Stroker, REF. 31)

WBNP-103 HYDROLOGIC ENGINEERING

WATTS BAR WBNP-103 Figure 2.4-63 Assumed Limits of Embankment Failure Wave Expansion HYDROLOGIC ENGINEERING 2.4-194

2.4-195 WATTS BAR Figure 2.4-64 Watts Bar Nuclear Plant Probable Maximum Flood Elevation WBNP-103 HYDROLOGIC ENGINEERING

WATTS BAR WBNP-103 Figure 2.4-65 thru Figure 2.4-67 Are Not Used HYDROLOGIC ENGINEERING 2.4-196

WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK 2.4-197 HYDROLOGIC ENGINEERING

????

2.4-198 WATTS BAR Figure 2.4-68 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Watts Bar Dam WBNP-103 HYDROLOGIC ENGINEERING

WATTS BAR WBNP-103 Figure 2.4-69 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-199

WATTS BAR WBNP-103 Figure 2.4-70 Deleted by Amendment 83 2.4-200 HYDROLOGIC ENGINEERING

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-71 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Fort Loudoun Dam WBNP-103 2.4-201

2.4-202 WATTS BAR Figure 2.4-72 Embankment Results Of Analysis For Operating Basis Earthquake - Fort Loudoun Dam WBNP-103 HYDROLOGIC ENGINEERING

WATTS BAR WBNP-103 Figure 2.4-73 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-203

WATTS BAR WBNP-103 Figure 2.4-74 Deleted by Amendment 103 2.4-204 HYDROLOGIC ENGINEERING

WATTS BAR WBNP-103 Figure 2.4-75 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-205

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-103 Figure 2.4-76 Analysis For OBE & 1/2 PMF Assumed Condition of Dam After Failure Norris Dam HYDROLOGIC ENGINEERING 2.4-206

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-77 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake -Cherokee Dam WBNP-103 2.4-207

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-78 Embankment Results of Analysis For Operating Basis Earthquake - Cherokee Dam WBNP-103 2.4-208

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-103 Figure 2.4-79 Assumed Condition of Dam After Failure PBE And 1/2 Probable Max Flood - Cherokee Dam HYDROLOGIC ENGINEERING 2.4-209

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-80 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake - Douglas Dam WBNP-103 2.4-210

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-81 Saddle Dam No. 1 Results of Analysis For Operating Basis Earthquake - Douglas Dam WBNP-103 2.4-211

WATTS BAR HYDROLOGIC ENGINEERING Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-82 Douglas Dam Assumed Condition of Dam After Failure aBE And 1/2 Probable Maximum Flood - Douglas Project WBNP-103 2.4-212

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-103 Figure 2.4-83 Fontana Dam Assumed Condition of Dam after Failure OBE And 1/2 Probable Maximum Flood HYDROLOGIC ENGINEERING 2.4-213

WATTS BAR WBNP-103 Figure 2.4-84 Deleted by Amendment 63 HYDROLOGIC ENGINEERING 2.4-214

WATTS BAR WBNP-103 Figure 2.4-85 Deleted by Amendment 63 HYDROLOGIC ENGINEERING 2.4-215

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-86 Spillway Results of Analysis For SSE Earthquake Fort Loudoun Dam WBNP-103 2.4-216

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-87 Embankment Results of Analysis For SSE Earthquake Fort Loudoun Dam WBNP-103 2.4-217

WATTS BAR HYDROLOGIC ENGINEERING Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-88 Fort Loudoun Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood - Fort Loudoun Dam WBNP-103 2.4-218

WATTS BAR HYDROLOGIC ENGINEERING Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-89 Tellico Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood Tellico Project WBNP-103 2.4-219

Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-103 Figure 2.4-90 Norris Dam SSE + 25 Year Flood Judged Condition of Dam After Failure - Norris Dam HYDROLOGIC ENGINEERING 2.4-220

WATTS BAR WBNP-103 Figure 2.4-91 SSE With Epicenter In North Knoxville Vicinity HYDROLOGIC ENGINEERING 2.4-221

WATTS BAR WBNP-103 Figure 2.4-92 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-222

WATTS BAR WBNP-103 Figure 2.4-93 SSE With Epicenter In West Knoxville Vicinity HYDROLOGIC ENGINEERING 2.4-223

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-94 Location of SSE For Simultaneous Failure of The Douglas and Fontana Dams WBNP-103 2.4-224

WATTS BAR WBNP-103 Figure 2.4-95 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-225

WATTS BAR WBNP-103 Figure 2.4-96 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-226

WATTS BAR WBNP-103 Figure 2.4-97 Deleted by Amendment 103 HYDROLOGIC ENGINEERING 2.4-227

WATTS BAR WBNP-103 Figure 2.4-98 Not Used HYDROLOGIC ENGINEERING 2.4-228

WATTS BAR WBNP-103 Figure 2.4-99 Grading Plan Intake Channel HYDROLOGIC ENGINEERING 2.4-229

WATTS BAR WBNP-103 Figure 2.4-100 Deleted by Amendment 83 HYDROLOGIC ENGINEERING 2.4-230

WATTS BAR WBNP-103 Figure 2.4-101 Deleted by Amendment 33 HYDROLOGIC ENGINEERING 2.4-231

WATTS BAR WBNP-103 Figure 2.4-102 Wells And Spring Inventory Within 2-Mile Radius of Watts Bar Nuclear Plant Site HYDROLOGIC ENGINEERING 2.4-232

WATTS BAR WBNP-103 Figure 2.4-103 Water-Level Fluctuations In Observation Wells at The Watts Bar Site HYDROLOGIC ENGINEERING 2.4-233

WATTS BAR WBNP-103 Figure 2.4-104 Locations of Ground - Water Observation Wells HYDROLOGIC ENGINEERING 2.4-234

WATTS BAR WBNP-103 Figure 2.4-105 Generalized Water-Table Contour Map January 1972 HYDROLOGIC ENGINEERING 2.4-235

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-106 Mechanical - Flow Diagram Fuel Pool Cooling and Cleaning System WBNP-103 2.4-236

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-107 Powerhouse Units 1 & 2 Flow Diagram - Residual Heat Removal System WBNP-103 2.4-237

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-108 Schematic Flow Diagram Flood Protection Provisions Open Reactor Cooling (Unit 1 Shown, Unit 2 Similar)

WBNP-103 2.4-238

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-109 Schematic Flow Diagram Flood Protection Provisions Natural Convection Cooling (Unit 1 Shown, Unit 2 Similar)

WBNP-103 2.4-239

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-110 (Sheet 1) Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Winter Events WBNP-103 2.4-240

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-110 (Sheet 2) Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Summer Events WBNP-103 2.4-241

WATTS BAR WBNP-103 Figure 2.4-111 Deleted by Amendment 103 2.4-242 HYDROLOGIC ENGINEERING

WATTS BAR WBNP-103 Figure 2.4-112 OBE with Epicenter Within Area Shown HYDROLOGIC ENGINEERING 2.4-243

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-113 SSE Failure of Norris, Cherokee, Douglas, and Tellico Dams with 25-Year Flood Failure Wave at Watts Bar Nuclear Plant WBNP-103 2.4-244

2.4-245 WATTS BAR Figure 2.4-114 SSE Failure of Norris, Cherokee, Douglas, and Tellico Dams with 25-Year Flood Failure Wave at Watts Bar Nuclear Plant WBNP-103 HYDROLOGIC ENGINEERING

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-115 OBE Failure of Norris and Tellico Dams with 1/2 PMF Event Failure Wave at Watts Bar Nuclear Plant WBNP-103 2.4-246

WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-116 OBE Failure of Cherokee, Douglas and Tellico Dams with 1/2 PMF Event Failure Wave at Watts Bar Nuclear Plant WBNP-103 2.4-247