TVA EMPLOYEE CONCERNS REPORT NUMBER:
SWEC-BLN-100 SPECIAL PROGRAM REPORT TYPE:
Bellefonte Nuclear Plant Subcategory REVISION NUMBER: 0 TITLE:
Stone & Webster Engineering Corporation (SWEC)
Systematic Analysis of Identified Issues/
Concerns at TVA REASON FOR REVISION: N/A SWEC
SUMMARY
STATEMENT: All Bellefonte site-specific issues identified by SWEC were verified by ECTG for completion status. The verification activities for the total of 50 issues were documented in 27 BLN SWEC Element files. These files have established the background, corrective action, and completion status for each SWEC issue. The overall summary process of evaluation, significance of the SWEC issues, and plant corrective actions are discussed in this SWEC subcategory report.
PREPARATION PREPARED BY:
SIGNATUE DATE REVIEWS PEER:
SIGNATURE DATE SRPA SIGNATURE DATE DATE MANAGER CONCURRENCE N/A OF NUCLEAR POWER (FINAL REPORT ONLY)
- SRP Secretary's signature denotes SRP concurrences are in files.
5144T_
8710140081 871007 PDR ADOCK 05000259 P
PDR DATE 1
EXECUTIVE
SUMMARY
BELLEFONTE SUBCATEGORY REPORT SWEC-BLN-100 Stone & Webster Engineering Corporation (SWEC)
Systematic Analysis of Ideggified Issues/Concerns at TVA I.
SUMMARY
OF THE ISSUES There are 50 SWEC eoncerns in this subcategory. The 50 concerns were grouped into 27 issues for the effective evaluation of similar concerns. The verification activities for the 50 concerns were documented in 27 BLN SWEC Element files. These files established the background, corrective action, and completion status for each SWEC issue.
The overall sunmary process of evaluation, and significance of the SWEC issues is discussed in this SWEC subcategory report.
-II. MAJOR FINDINGS Summary data of the SQN SWEC.issues is as follows:
21 issues are statused as closed.
- 8 issues are statused as having completed corrective action.
These issues will be considered closed following NRC closure.
- 21 issues are statused as having satisfactory corrective action in progress.
- No issues are statused as having insufficient evidence of corrective action.
III.
COLLECTIVE SIGNIFICANCE OF MAJOR FINDINGS All of the SWEC issues were factually accurate and required corrective action by BLN.
This corrective action was verified by ECTG to be complete or satisfactorily in progress for all BLN SWEC issues.
IV.
CAUSES OF THE MAJOR FINDINGS The four leading causes of the SWEC concerns were (1) procedure compliance inadequacy (2) procedural inadequacy (3) supervision inadequacy, and (4) lack of corrective action (including timeliness).
V. CORRECTIVE ACTION ON MAJOR FINDINGS ECTG verified that corrective actions had been completed or were in progress for all of the 50 SWEC issues at BLN.
The status of each issue is listed in Attachment A to this subcategory report.
5144T Page 1 of 1
TENNESSEE VALLEY AUTHORITY BELLEFONTE NUCLEAR PLANT EMPLOYEE CONCERNS TASK GROUP OTHER SITES CEG Subcategory: Bellefonte Nuclear Plant Element:
Stone & Webster Engineering Corporation (SWEC)
Systematic Analysis of Identified Issues/Concerns at TVA Report Number:
SWEC-BLN-100 Evaluator:
Reviewed by:
Approved by:
'7 I
-L4 A J. J. Knightly K. R. Gass A. G. Debb e Date Date Date 5144T 1
df. An.
TVA EMPLOYEE CONCERNS REPORT NUMBER:
SWEC-BLN-100 SPECIAL PROGRAM FRONT MATTER REV:
2 PAGE i OF viii Preface This subcategory report is one of a series of reports prepared for the Employee Concerns Special Program (ECSP) of the Tennessee Valley Authority (TVA). The ECSP and the organization which carried out the program, the Employee Concerns Task Group (ECTG), were established by TVA's Manager of Nuclear Power to evaluate and report on those Office of Nuclear Power (ONP) employee concerns filed before February 1, 1986.
Concerns filed after that date are handled by the ongoing ONP Employee Concerns Program (ECP).
The ECSP addressed over 5800 employee concerns. Each of the concerns was a formal, written description of a circumstance or circumstances that an employee thought was unsafe, unjust, inefficient, or inappropriate. The mission of the Employee Concerns Special Program was to thoroughly investigate all issues presented in the concerns and to report the results of those investigations in a form accessible to ONP employees, the NRC, and the general public. The results of these investigations are communicated by four levels of ECSP reports: element, subcategory, category, and final.
Element reports, the lowest reporting level, will be published only for those concerns directly affecting the.restart of Sequoyah Nuclear Plant's reactor unit 2. An element consists of one or more closely related issues. An issue is a potential problem identified by ECTG during the evaluation process as having been raised in one or more concerns. For efficient handling, what appeared to be similar concerns were grouped into elements early in the program, but issue definitions emerged from the evaluation process itself. Consequently, some elements did include only one issue, but often the ECTG evaluation found more than one issue per element.
Subcategory reports summarize the evaluation of a number of elements.
However, the subcategory report does more than collect element level evaluations. The subcategory level overview of element findings leads to an integration of information that cannot take place at the element level. This integration of information reveals the extent to which problems overlap more than one element and will therefore require corrective action for underlying causes not fully apparent at the element level.
To make the subcategory reports easier to understand, three items have been placed at the front of each report: a preface, a glossary of the terminology unique to ECSP reports, and a list of acronyms (terms formed from the first letters of a series of words).
Additionally, at the end of each subcategory report the reader will find at least two attachments.
The first is a Subcategory Summary Table that includes the following information:
the concern number, a brief statement of the concern, and a designation of nuclear safety-related concerns. The second attachment is a listing of the concerns included in each issue evaluated in the subcategory.
. "P W ;, Ir.
7.'!JN'A tvqfl.
?i7AVWFqX'A
!Ar-,
TVA EMPLOYEE CONCERNS SPECIAL PROGRAM REPORT NUMBER: SWEC-BLN-100 FRONT HATTER REV: 2 PAGE ii OF viii The subcategories are themselves summarized in a series of eight category reports. Each category report reviews the major findings and collective significance of the subcategory reports in one of the following areas:
- management and personnel relations
- industrial safety
- construction
- material control
- operations
- quality assurance/quality control
- welding
- engineering A separate report on employee concerns dealing with of intimidation, harassment, and wrongdoing will be Office of the Inspector General.
specific contentions released by the TVA Just as the subcategory reports integrate the information collected at the element level, the category reports integrate the information assembled in all the subcategory reports within the category, addressing particularly the underlying causes of those problems that run across more than one subcategory.
A final report will integrate and assess the information collected by all of the lower level reports prepared for the ECSP, including the Inspector General's report.
For more detail on the methods by which ECTG employee concerns were evaluated and reported, consult the Tennessee Valley Authority Employee Concerns Task Group Program Manual. The Manual spells out the program's objectives, scope, organization, and responsibilities. It also specifies the procedures that were followed in the investigation, reporting, and closeout of the issues raised by employee concerns.
.p
~
~~
K
- .2 i
TVA EMPLOYEE CONCERNS REPORT NUMBER:
SWEC-BLN-100 SPECIAL PROGRAM FRONT RATTER REV:
2 PAGE iii OF viii ECSP GLOSSARY OF REPORT TERHS*
classification of evaluated issues the evaluation of an issue leads to one of the following determinations:
Class A:
Issue cannot be verified as factual Class B:
Issue is factually accurate, but what is described is not a problem (i.e., not a condition requiring corrective action)
Class C:
Issue is factual and identifies a problem, but corrective action for the problem was initiated before the evaluation of the issue was undertaken Class D:
Issue is factual and presents a problem for which corrective action has been, or is being, taken as a result of an evaluation Class E: A problem, requiring corrective action, which was not identified by an employee concern, but was revealed during the ECTG evaluation of an issue raised by an employee concern.
collective significance an analysis which determines the importance and consequences of the findings in a particular ECSP report by putting those findings in the proper perspective.
concern (see "employee concern")
corrective action steps taken to fix specific deficiencies or discrepancies revealed by a negative finding and, when necessary, to correct causes in order to prevent recurrence.
criterion (plural: criteria) a basis for defining a performance, behavior, or quality which ONP imposes on itself (see also "requirement").
element or element report an optional level of ECSP report, below the subcategory level, that deals with one or more issues.
employee concern a formal, written description of a circumstance or circumstances that an employee thinks unsafe, unjust, inefficient or inappropriate; usually documented on a K-form or a form equivalent to the K-form.
i
TVA EMPLOYEE CONCERNS REPORT NUMBER: SWEC-BLN-100 SPECIAL PROGRAM FRONT MATTER REV: 2 PAGE iv OF viii evaluator(s) the individual(s) assigned the responsibility to assess a specific grouping of employee concerns.
findings includes both statements of fact and the judgments made about those facts during the evaluation process; negative findings require corrective action.
issue a potential problem, as interpreted by the ECTG during the evaluation process, raised in one or more concerns.
K-form (see "employee concern")
requirement a standard of performance, behavior, or quality on which an evaluation judgment or decision may be based.
root cause the underlying reason for a problem.
- Terms essential to the program but which require detailed definition have been defined in the ECTG Procedure Manual (e.g., generic, specific, nuclear safety-related, unreviewed safety-significant question).
Er' e
4: t.7
.fr"A:,
k M N-, N ev
- I IM "k
',"M'At T.',*:- '
"'?
TVA EMPLOYEE CONCERNS REPORT NUMBER: SWEC-BLN-100 SPECIAL PROGRAM FRONT MATTER REV: 2 PAGE v OF viii Acronyms AI Administrative Instruction AISC American Institute of Steel Construction ALARA As Low As Reasonably Achievable ANS American Nuclear Society ANSI American National Standards Institute ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials AWS American Welding Society BFN Browns Ferry Nuclear Plant BLN Bellefonte Nuclear Plant CAQ Condition Adverse to Quality CAR Corrective Action Report CATD Corrective Action Tracking Document CCTS Corporate Commitment Tracking System CEG-H Category Evaluation Group Head CFR Code of Federal Regulations CI Concerned Individual CMTR Certified Material Test Report COC Certificate of Conformance/Compliance DCR Design Change Request DNC Division of Nuclear Construction (see also NU CON) i
TVA EMPLOYEE CONCERNS REPORT NUMBER: SWEC-BLN-100 SPECIAL PROGRAM FRONT HATTER REV:
2 PAGE vi OF viii DNE Division of Nuclear Engineering DNQA Division of Nuclear Quality Assurance DNT Division of Nuclear Training DOE Department of Energy DPO Division Personnel Officer DR Discrepancy Report or Deviation Report ECN Engineering Change Notice ECP Employee Concerns Program ECP-SR Employee Concerns Program-Site Representative ECSP Employee Concerns Special Program ECTG Employee Concerns Task Group EEOC Equal Employment Opportunity Commission EQ Environmental Qualification ENRT Emergency Medical Response Team EN DES Engineering Design ERT Employee Response Team or Emergency Response Team FCR Field Change Request FSAR Final Safety Analysis Report FY Fiscal Year GET General Employee Training HCI Hazard Control Instruction HVAC Heating, Ventilating, Air Conditioning II Installation Instruction INPO Institute of Nuclear Power Operations IRN Inspection Rejection Notice
TVA EMPLOYEE CONCERNS REPORT NUMBER: SWEC-BLN-100 SPECIAL PROGRAM FRONT MATTER REV: 2 PAGE vii OF viii L/R Labor Relations Staff M&AI Modifications and Additions Instruction MI Maintenance Instruction MSPB Merit Systems Protection Board HT Magnetic Particle Testing NCR Nonconforming Condition Report NDE Nondestructive Examination NPP Nuclear Performance Plan NPS Non-plant Specific or Nuclear Procedures System NQAM Nuclear Quality Assurance Manual NRC Nuclear Regulatory Commission NSB Nuclear Services.Branch NSRS Nuclear Safety Review Staff NU CON Division of Nuclear Construction (obsolete abbreviation, see DNC)
NUMARC Nuclear Utility Management and Resources Committee OSHA Occupational Safety and Health Administration (or Act)
ONP Office of Nuclear Power OWCP Office of Workers Compensation Program PHR Personal History Record PT Liquid Penetrant Testing QA Quality Assurance QAP Quality Assurance Procedures QC Quality Control QCI Quality Control Instruction
TVA EMPLOYEE CONCERNS REPORT NUMBER: SWEC-BLN-100 SPECIAL PROGRAM FRONT HATTER REV:
2 PAGE viii OF viii QCP Quality Control Procedure QTC Quality Technology Company RIF Reduction in Force RT Radiographic Testing SQN Sequoyah Nuclear Plant SI Surveillance Instruction SOP Standard Operating Procedure SRP Senior Review Panel SWEC Stone and Webster Engineering Corporation TAS Technical Assistance Staff T&L Trades and Labor TVA Tennessee Valley Authority TVTLC Tennessee Valley Trades and Labor Council UT Ultrasonic Testing VT Visual Testing WBECSP Watts Bar Employee Concern Special Program WBN Watts Bar Nuclear Plant WR Work Request or Work Rules WP Workplans Pro
- 4721
- 2.0
SUMMARY
The nurose of ECTG's verification activities for the SWEC issues was to 1.0 CHARACTERIZATION OF ISSUES 1.1 Introduction The Stone & Webster Engineering Corporation (SWEC) Systematic Analysis of Identified Issues/Concerns at TVA was performed by a group of 22 senior-level Stone & Webster personnel from January 20 January 31, 1986 at TVA. Background information on the SWEC analysis was provided by SWEC in their report transmittal of February 14, 1986 (J. A. Kirkebo to L. D. Nace):
In a meeting with the NRC Commissioners on January 9, 1986, TVA Directors committed to a review and evaluation of previously identified issues/concerns as a means of assessing the current situation as well as identifying certain root causes of problems. To meet this commitment a Systematic Analysis was to accumulate issues and concerns from sources external to TVA, encode these into a data base, analyze the resultant information, determine root causes where possible and support the preparation of a report to NRC outlining the TVA Recovery Plan.
The sorts of the resulting data base were utilized as a foundation for preparation of the revised volume 1 of the TVA Nuclear Performance Plan.
All issues/concerns accumulated by SWEC were turned over to the Employee Concerns Task Group (ECTG) for evaluation.
1.2 Description of Sources Stone & Webster identified issues and concerns from TVA's incoming correspondence over a 16-month period ending January 1986. ECTG determined that the sources of the issues and concerns for Bellefonte Nuclear Plant (BLN) were as follows:
38 issues identified by the Nuclear Regulatory Commission (NRC) including violations, inspector follow-up items, unresolved items, and unnumbered concerns.
- Seven issues included inNRC's 1985 Systematic Assessment of Licensee Performance (SALP) Reports
- Three issues identified by the Institute of Nuclear Power Operations (INPO)
- Two issues identified in correspondence from the Tennessee Congressional delegation.
1.3 Description of Issues Because of the variety and types of issues covered, it is inappropriate to discuss individual issues in the body of this report. Details of each issue are included in Attachment A of this report.
8 other issues were statused as having completed corrective actions. These issues will be considered closed following closure by the NRC. Corrective Action Tracking Documents (CATDs) for these issues will not be issued by ECTG.
- 21 issues were statused as having satisfactory corrective action in progress. CATDs for these issues are listed in section 4.2.
- No issues were statused as having insufficient evidence of corrective action.
4.2 Corrective Actions in Progress SWEC issues verified as having corrective action in progress are identified in Attachment A. The following CATDs are attached to identify these 21 issues for ECTG tracking purposes:
SWEC-BLN-04-003, Fire Protection Automatic Start and Relief Valve SWEC-BLN-04-004, Fire Protection Water System SWEC-BLN-04-005, Fire Damper Installations SWEC-BLN-04-006, Hydrostatic Tests for Fire Protection Piping SWEC-BLN-07-001, Valve Maintenance SWEC-BLN-07-002, Ultrasonic Exams on Containment Penetrations SWEC-BLN-07-003, Post Weld Heat Treatment SWEC-BLN-10-001, QC Personnel Eye Exams SWEC-BLN-11-001, Storage of Valves and Motors SWEC-BLN-12-001, Preventive Maintenance Procedures SWEC-BLN-13-001, Concrete Expansion Wedge Anchors SWEC-BLN-18-001, Pipe Support Inspection Procedures SWEC-BLN-21-001, Ultrasonic Exams on Steam Generator Welds SWEC-BLN-22-001, HYAC Duct Hap Procedure SWEC-BLN-25-063, Housekeeping of Electrical Cable Trays SWEC-BLN-25-091, Incorrect Fittings on Tubing SWEC-BLN-25-092, Lack of Timely Corrective Action SWEC-BLN-25-094, Fire Damper Installations Page 3 of 5 i
j P
SWEC-BLN-25-095, Fire Protection System in Auxiliary Building SWEC-BLN-25-104, Design Control QA Audit Program SWEC-BLN-25-10S, Equipment Storage and Maintenance 5.0 COLLECTIVE SIGNIFICANCE Most of the BLN SWEC issues were identified by the Nuclear Regulatory Commission.
All of the issues were factually accurate, and required corrective action by TVA. ECTG verified that the corrective actions were complete or in progress for all of the 50 SWEC issues.
6.0 CAUSES Stone & Webster's analysis of the overall SWEC issues identified the causes as follows:
Procedure compliance inadequacy 167.
Procedural inadequacy 167.
Supervision inadequacy 127.
Lack of corrective action (including timeliness) 12%
Regulatory commitment non-compliance 107.
Technical requirement document inadequate
- 77.
Training inadequacy
- 77.
Testing or inspection inadequacy
- 67.
Other 147.
The ECTG personnel who evaluated the BLN SWEC issues concurred with the above Stone & Webster listing.
7.0 CORRECTIVE ACTION As noted above, all of the SWEC issues were factually accurate and required corrective action by TVA. Corrective action for 29 of the 50 SWEC issues had been completed at the time of the ECTG verification activity. An additional 21 issues verified as having corrective action in progress are listed in section 4.2.
The corrective action status of all issues is identified in Attachment A of this report.
Page 4 of 5
.Z%
- 8.0 ATTACHMENTS Attachment A -
SWEC Issues, BLN with Corrective Action Status Attachment B - SWEC CATDs (as listed in sections 4.2)
Page 5 of 5 i
'ffrM*
Mv". s
- a. 'M.M;
S SWEC ISSUES - BLN Status as of Date March 17, 1987 Attachment A ELEMENT NUMBER SWEC-BLN-01 SWEC-BLN-02 SWEC-BLN-03 SWEC-BLN-04 SWEC-BLN-05 SWEC-BLN-06 ELEMENT/DESCRIPTION CONCERNS NUMBERS NRC Inspection Report 438,439/84-22:
A02841101002-001 spent fuel storage racks A02841101002-002 NRC Inspection Report 438,439/84-21:
A02841101003-001 welding of structures and supports NRC Inspection Report 438,439/84-20:
A02841106002-001 QA inspection of protective coatings A02841106002-002 NRC Inspection Report 438,439/84-24:
A02841221009-001 permanent plant fire protection A02841221009-002 features A02841221009-003 A02841221009-004 A02841221009-005 A02841221009-006 NRC Inspection Report 438,439/84-26:
A02850124028-001 welding activities NRC Inspection Report 438,439/85-02:
A02850214004-001 seismic analysis inspection of as-builts SWEC-BLN-07 SWEC-BLN-08 SWEC-BLN-09 NRC Inspection Report 438,439/85-01:
review of audit procedures and records NRC Inspection Report 438,439/85-04:
instrumentation and terminations.
NRC Inspection Report 438,439/85-06:
steel structures and supports A02850219012-001 A02850219012-002 A02850219012-003 A02850228003-001 A02850313014-001 AO2850313014-002
- Comments:
1 = Ready for NRC Closure 2 = Corrective Action in Progress 3 = Corrective Action Not Adequate Page 1 of 4 OPEN COMMENT CLOSED x
x x
I x
x I
x x
1 1
,1
'2
- 2 x
I 1
I I
x 2
2 2
x X.
x 5144T
SWEC ISSUES -
BLN ELEMENT NUMBER SWEC-BLN-10 SWEC-BLN-11 SWEC-BLN-12 SWEC-BLN-13 SWEC-BLN-14 SWEC-BLN-15 SWEC-BLN-16 SWEC-BLN-17 ELEMENT/DESCRIPTION NRC Inspection Report 438,439/85-07:
welding of safety related piping, fire protection and prevention NRC Inspection Report 438,439/85-08:
containment penetrations and spent fuel storage racks NRC Inspection Report 438,439/85-01:
NRC staff assessment of TVA response to NRC notice of violation NRC Inspection Report 438,439/85-02:
NRC staff assessment of TVA response to NRC notice of violation NRC outlines concerns with TVA con struction sites INPO attaches final accreditation reports for review NRC Inspection Report 438,439/85-12:
welding activities, construction testing NRC letter involving concerns with TVA construction sites CONCERNS NUMBERS A02850401005-001 A02850411004-001 A02850411004-002 A02850411004-003 A02850415010-001 A02850424006-001 A02850517001-012 A02850517002-005 A02850517002-006
.A02850523007-001 A02850053007-002 A02850524001-013 CLOSED OPEN X
x x
Attachment A COMMENT 2
2 x
x x
2 K
K x
x
- Comments:
1 = Ready for NRC Closure 2 = Corrective Action in Progress 3 = Corrective Action Not Adequate Page 2 of 4 5144T
SWEC ISSUES -
BLN ELEMENT NUMBER SWEC-BLN-18 SWEC-BLN-19 SWEC-BLN-20 SWEC-BLN-21 SWEC-BLN-22 SWEC-BLN-23 SWEC-BLN-24 SWEC-BLN-25 ELEMENT/DESCRIPTION NRC Inspection Report 438,439/85-13:
seismic analysis inspection of as-builts NRC Inspection Report 438,439/85-14:
construction program associated with pipe welding and surface defects NRC Inspection Report 438,439/85-15:
welding activities NRC Inspection Report 438,439/85-18:
preservice inspection, welding activities, construction NDE and records review NRC Inspection Report 438,439/85-22:
housekeeping, material control, HVAC NRC Inspection Report 438, 439/85-22:
Follow up to URI 438, 439/84-22-03 U. S. Senate request for TVA to respond to questions regarding its
,Aecision to delay construction at BLN NRC SALP report for TVA facilities CONCERNS NUMBERS
'A02850606004-001 A02850606004-002 A02850607005-001 A02850607005-002 A02850719002-001 A02850719002-002 A02850906002-001 A02851213004-001 A02860113004-001 A07850718002-001 A07850919005-063 AO7850919005-091 AO7850919005-092 A07850919005-094 A07850919005-095 A07850919005-104 AO7850919005-105 CLOSED OPEN I x x x Attachment A COMMENTS 2
1 1
1 I
x I
x x
2 12 1
I I
I I
x x
x I
2 2
2 2
2 2
2
- Comments:
1 = Ready for NRC Closure 2 = Corrective Action in Progress 3 = Corrective Action Not Adequate Page 3 of 4 5144T
ELEMENT NUMBER SWEC-BLN-26 SWEC-BLN-27 ELEMENT/DESCRIPTION_
Termination of employee INPO drafts of accreditation team reports SWEC ISSUES - BLN CONCERNS NUMBERS A47851105001-001 L00850403294-003 CLOSED OPEN Attachment A COMMENTS,.
x I
- Comments:
1 = Ready for NRC Closure 2 = Corrective Action in Progress 3 = Corrective Action Not Adequate 5144T Page 4 of 4
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required:
0 Yes
)K No Stop Work Recommended: 0 Yes.4 No CATD No. SWEC-BLN-04-003
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION: BLN Site Director PROBLEM DESCRIPTION: ;.QR 0 NQR SWEC-BLN-04-003 Deviation 438, 439/83-10-01, Fire Protection Automatic Start and Relief Valve:
Portions of Fire Protection Systems do not conform to design of NFPA codes.
(Item open) 0 ATTACHMENTS PREPARED BY:
NAME Don Cosset e
4W--g=
CONCURRENCE:
CEG-HTir, APPROVAL:
ECTG PROGRAM MGR.
DATE:
DATE:
DATE:
DATE:
CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process.
This CATD is issued for tracking purposes only.
0 ATTACHMENTS PROPOSED BY:
DIRECTOR/MGR:
DATE:
- 12.
CONCURRENCE:
ECTG PROGRAM CEG-H:
MANAGER DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified as implemented.
SIGNATURE TITLE satisfactorily DATE 5140T
- 1.
- 2.
- 3.
- 5.
6.
- 7.
- 8.
9.
11.
06/15/87 i
.,. 1.1.1.
1-.
" -*',-,h -.1 : -I.P.M., -
'"OV,
- 'I..
r4...
- Wjr*1 -
vr I? :.
..'N I
i
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION
- 1.
- 2.
- 3.
5.
6.
Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes % No Stop Work Recommended: 0 Yes g No CATD No. SWEC-BLN-04-004
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION: ;
QR O NQR SWEC-BLN-04-004 Deviation 438, 439/83-10-03, Fire Protection Water System:
The exterior Fire Protection Water System was not installed under a OA/QC program. NRC stated that EN DES EP1.55, Fire Protection Quality Assurance Program, when implemented, will probably meet the requirements of SRP 9.5.1.
PREPARED BY:
NAME Don Cos CONCURRENCE:
CEG-H APPROVAL: ECTG PROGRAM HGR.
O ATTACHMENTS
,d,-DATE:
06/15/87 DATE:
6 ffQ r
DATE:
d lrk I,
CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CAID is issued for tracking purposes only.
O ATTACHMENTS PROPOSED BY:
DIRECTOR/HGR:
DATE:
- 12.
CONCURRENCE:
ECTG PROGRAM CEG-H:
MANAGER DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified as implemented.
SIGNATURE TITLE satisfactorily DATE
- 7.
- 8.
9.
11.
5140T oz WA j,<,
i
ECTG C.3 Attachment A Page 1 of 1.
Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required:
0 Yes DE No Stop Work Recommended: 0 Yes
$ No CATD No. SWEC-BLN-04-005
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION: 0aQR 0 NQR SWEC-BLN-04-005 Deviation 438, 439/83-10-05, Improper Fire Damper Installations:
This CATD to remain open pending completion of necessary fire damper installation modifications by TVA.
0 ATTACHMENTS PREPARED BY: NAME Don Cossett 6<-4'%--ATE:
06/15/87 CONCURRENCE: CEG-H DATE:
(.///17 APPROVAL:
ECTG PROGRAM MGR.
DATE:
7 CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CATD is issued for tracking purposes only.
0 ATTACHMENTS PROPOSED BY:
DIRECTOR/MGR:
DATE:
- 12.
CONCURRENCE:
ECTG PROGRAM CEG-H:
MANAGER DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified as satisfactorily implemented.
SIGNATURE TITLE DATE 5140T
~tM
~
~
~'
- 1.
- 2.
- 3.
- 5.
6.
- 7.
- 8.
9.
11.
i
. " "F Ot -.';
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes t No Stop Work Recommended:
0 Yes
% No CATD No. SWEC-BLN-04-006
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION: ;K QR 0 NQR SWEC-BLN-04-006 IFI 438, 439/83-10-04, Re-evaluation of Hydrostatic Tests of Fire Protection Piping Systems:
This CATD to remain open pending completion of hydro testing by TVA Mechanical Engineering Group.
0 ATTACHMENTS PREPARED BY:
NAME Don Cossett 8:
e
-DATE:
06/15/87 CONCURRENCE: CEG-H DATE:
4 t/f/f APPROVAL:
ECTG PROGRAM MGR.
DATE:
Ft ? 7 CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CATD is issued for tracking purposes only.
- 11.
PROPOSED BY:
- 12.
CONCURRENCE:
ECTG PROGRAM DIRECTOR/MGR:
CEG-H:
MANAGER O ATTACHMENTS DATE:
DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified as implemented.
SIGNATURE TITLE satisfactorily DATE F
- 1.
- 2.
- 3.
- 5.
6.
- 7.
- 8.
9.
5140T i
ECTG C.3 Attachment A Page 1 of 1.
Revision 4
- ECTG Corrective Action Tracking Document (CAID)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes Ol No Stop Work Recommended: 0 Yes t
No CATD No. SWEC-BLN-07-001
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION:
d QR O NQR SWEC-BLN-07-001 Violation 438, 439/85-01-01, Development of Valve Maintenance Requirements:
The PM program for safety-related valves with Limitorque operators does not ensure prompt corrective action.
PREPARED BY: NAME Don Cos CONCURRENCE:
CEG-H
-APPROVAL: ECTG PROGRAM MGR.
- 7.
- 8.
9.
CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
0 ATTACHMENTS
,6t-DATE:
06/15/87 DATE:
j/f F7 S
DATE:
/r/
Corrective action is in process. This CAID is issued for tracking purposes only.
0 ATTACHMENTS
- 11. - PROPOSED BY:
- 12.
CONCURRENCE:
ECTG PROGRAM DIRECTOR/MGR:
CEG-H:
MANAGER DATE:
DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been implemented.
SIGNATURE verified as satisfactorily TITLE DATE
- 1.
- 2.
3.
- 5.
6.
5140T sett VF-4 6am i
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracki Document INITIATION I.
- 2.
- 3.
- 5.
- 6.
- 7.
- 8.
9.
Applicable ECTG RotN.
SWEC-BLN-100 Immediate Corrective Action Required:
oN YesT No Stop Work Recom~menlded:
c Yes 0-. No CATD No. SWEC-BLN.07-OO 2
- 4. INITIATION DATE 0615/87 RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION:
o QR 0 NQR SDWEC-BLN-07 Violation 438, 439/83-24-01, questionable UT Exams.
UR 48 439/85-01-02 Examl.
Re ts. for Elect. Penetrations:
poedures are inadeguate for performingUeaintosn continmet penetrations.
0ATC-H-E N TS CONCURRENCE:
CEG-H DATE:
APPROVAL: ECTG PROGRA HGR.DAE CORRECTIV
.E ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
A--MANAGE eCorrectve activonis int onss This CAnDeii ss forisfac ifl puroses onl.
B DIE CTR/MG:DATE:
11 ROPOSED BY:
DIRETERMGR
- 12.
CONCURRENCE: CEG-l:
_______________DATE:
ECTG PROGRAM MANAGER ______________
- 13.
Approved corrective actions have been verified as satisfactori.ly implemented.
SIGNATURE 5140T
~ ~
'*~i X ~
N tt
'r"T wl-'
DATE I
TITLE i
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION
- 1.
- 2.
- 3.
5.
6.
- 7.
- 8.
9.
Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes g No Stop Work Recommended: 0 Yes %K No CATD No. SWEC-BLN-07-003
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION: K QR 0 NQR SWEC-BLN-07-003 URI 438, 439/84-06-01, Post Weld Heat Treatment:
Records for Reactor Coolant Pressure Boundary Components do not verify proper post weld heat treatment and material coupon notch toughness.
0 ATTACHMENTS PREPARED BY:
NAME Don Cossett DATE:
06/15/87 CONCURRENCE: CEG-H DATE:
Aj, IZ APPROVAL:
ECTG PROGRAM MGR.
DATE:
I9 CORRECTIVE ACTION 10.-
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CATD is issued for tracking purposes only.
0 ATTACHMENTS
-PROPOSED BY:
DIRECTOR/MGR:
DATE:
- 12.
-CONCURRENCE:
ECTG PROGRAM CEG-H:
MANAGER DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been implemented.
SIGNATURE verified as satisfactorily I
TITLE DATE 5140T 1
1k 11.
i
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes p
No Stop Work Recommended: 0 Yes
>f No 1CATD No. SWEC-BLN-10-001
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION: BLN Site Director PROBLEM DESCRIPTION: $
QR 0 NQR SWEC-BLN-10-001 Violation 438, 439/85-07-01, QC personnel eye examinations:
TVA failed to provide annual eye examinations for QC personnel.
Examinations are currently being given every three (3) years.
- 7.
- 8.
9.
PREPARED BY: NAME Don Cossett X1
),.&'
CONCURRENCE:
CEG-H APPROVAL:
ECTG PROGRAM MGR.
2 ar o VZ n-,
O ATTACHMENTS
-DATE:
06/15/87 DATE:
/f R7 DATE:
6/M1/
CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CATD is issued for tracking purposes only.
- 11.
PROPOSED BY:
- 12.
CONCURRENCE:
ECTG PROGRAM DIRECTOR/MGR:
CEG-H:
MANAGER O ATTACHMENTS DATE:
DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified as satisfactorily implemented.
SIGNATURE TITLE DATE 5140T
- 1.
- 2.
- 3.
- 5.
6.
i
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes
- K No Stop Work Recommended
- 0 Yes X No
-- CATD No. SWEC-BLN-11-001
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION: XQR 0 NQR SWEC-BLN-11-001 Violation 438, 439/85-08-01, Storage of Valves and Motors:
TVA failed to establish adequate measures for storage of motors and valves.
0 ATTACHMENTS PREPARED BY:
NAME Don Cos CONCURRENCE:
CEG-H APPROVAL:
ECTG PROGRAM MGR.
sett f.,.
a&&
(fAAW DATE:
06/15/87 DATE:
& /F &7
-A -
DATE:
6 /(/7 CORRECTIVE ACTION 10.--PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process.
This CATD is issued for tracking purposes only.
0 ATTACHMENTS PROPOSED BY:
DIRECTOR/MGR:
DATE:
- 12.
CONCURRENCE:
ECTG PROGRAM CEG-H:
MANAGER DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been implemented.
SIGNATURE verified as satisfactorily TITLE DATE
- 1.
- 2.
3.
- 5.
6.
- 7.
- 8.
9.
11.
5140T i
ECTG C.3 Attachment A Page 1 of 1.
Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100
- 1.
- 2.
- 3.
S.
6.
- 7.
- 8.
9.
CORRECTIVE ACTION 10.
PROPOSED CORRECTIVE ACTION PLAN:
Immediate Corrective Action Required: 0 Yes
,K No Stop Work Recommended: 0 Yes JK No CATD No. SWEC-BLN-12-001
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION: BLN Site Director PROBLEM DESCRIPTION: %QR 0 NQR SWEC-BLN-12-001 Follow-up to Violation 438, 439/85-01-01 Preventive Maintenance Procedure:
Reference SWEC-BLN-07. Deficiencies in the preventive maintenance procedures for valves are not corrected in a timely manner.
0 ATTACHMENTS PREPARED BY:
NAME Don Cossett DATE:
06/15/87 CONCURRENCE:
CEG-H DATE:
4 igfty APPROVAL: ECTG PROGRAM MGR.
£', idC DATE:
Corrective action is in process. This CATD is issued for tracking purposes only.
0 ATTACHMENTS
- 11.
PROPOSED BY:
- 12.
CONCURRENCE:
ECTG PROGRAM DIRECTOR/MGR:
CEG-H:
MANAGER DATE:
DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified as implemented.
SIGNATURE satisfactorily TITLE DATE 5140T i
Vv.:.
-,V
, v
.I I
- 0.
C: fzn,.
VOW? :"*M X -4, 4:,,
6 T
1-:1-IR
ECTG C.3 Attachment A Page 1 of 1.
Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes g No Stop Work Recommended: 0 Yes X No CATD No. SWEC-BLN-13-001
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION: BLN Site Director PROBLEM DESCRIPTION: X QR 0 NQR SWEC-BLN-13-001 Follow-up to Violation 438, 439/85-02-01 Engineering Inadequacy:
Reference SWEC-BLN-06-001. TVA presented erroneous engineering arguments concerning anchor bolts, which raised further NRC concern with overall engineering adequacy.
Ol ATTACH1MENTS
- 7.
- 8.
9.
PREPARED BY:
NAME Don Cossett f CONCURRENCE:
CEG-H APPROVAL: ECTG PROGRAM HGR.
DATE:
06/15/87 DATE:
9f//7 DATE:
/
/97 CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CATD is issued for tracking purposes only.
- 11.
PROPOSED BY:
- 12.
CONCURRENCE:
ECTG PROGRAM DIRECTOR/MGR:
CEG-H:
MANAGER O ATTACHMENTS DATE:
DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified as implemented.
SIGNATURE TITLE satisfactorily DATE
- 1.
- 2.
- 3.
- 5.
6.
5140T i
ECTG C.3.
Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CAID)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes % No Stop Work Recommended: 0 Yes E No CATD No. SWEC-BLN-18-001
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:,
BLN Site Director PROBLEM DESCRIPTION: )I QR 0 NQR SWEC-BLN-18-001 Violation 438, 439/85-13-02, Pipe Support Inspection Procedures:
Inspection procedures do not provide guidance, nor is in compliance with Spec. G-43, for determining when measurements for pipe support gaps are to be taken.
0 ATTACHMENTS
- 7.
PREPARED BY:
NAME Don Cossett DATE:
06/15/87
- 8.
CONCURRENCE:
CEG-H DATE:
(//t/t?
- 9.
APPROVAL:
ECTG PROGRAM MGR.
DATE:
Z4 /9f CORRECTIVE ACTION
- 10.
-PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CATD is issued for tracking purposes only.
0 ATTACHMENTS PROPOSED BY:
DIRECTOR/MGR:
DATE:
CEG-H:
MANAGER DATE:
DATE:
- 12.
CONCURRENCE:
ECTG PROGRAM VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified implemented.
SIGNATURE TITLE as satisfactorily DATE
- ~~~
~
~
~
II 1r' 0f, 1EkS.
~.,
7&
-i..
- 1.
- 2.
- 3.
S.
6.
11.
5140T i
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes 2C No Stop Work Recommended:
0 Yes pt No
-CATD No. SWEC-BLN-21-001
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION: St QR 0 NQR SWEC-BLN-21-001 IFI 438/85-10-02, Ultrasonic Test on Steam Generator Welds:
Resolve problems in order to close IFI referenced above. Ensure N-UT-19 is in complete compliance with ASME code, Sec. V, para. T-424. Resolve calibration block attenuation problems.
0 ATTACHMENTS PREPARED BY:
NAME CONCURRENCE: CEG-H APPROVAL:
ECTG PRO Don Cos settA kejd cg DATE:
06/15/87 e
DATE:
(.//Q/i 97 GRAM MGR.
d fl DATE:
CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CATD is issued for tracking purposes only.
0 ATTACHMENTS
.PROPOSED BY:
DIRECTOR/HGR:
DATE:
- 12.
CONCURRENCE:
ECTG PROGRAM CEG-H:
MANAGER DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified as implemented.
SIGNATURE TITLE satisfactorily DATE 5140T
- 1.
- 2.
- 3.
S.
6.
- 7.
- 8.
9.
11.
, -&$ f
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION
- 1.
- 2.
- 3.
- 5.
6.
- 7.
- 8.
9.
Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required:
0 Yes K No Stop Work Recommended: 0 Yes X
No CATD No. SWEC-BLN-22-001
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION: BLN Site Director PROBLEM DESCRIPTION: 0 QR 0 NQR SWEC-BLN-22-001 Violation 438, 439/85-22-02, HVAC Duct Maps:
Heating, Ventilation, and Air Conditioning (HVAC) duct maps, used to identify each duct section needing inspecting, omitted four (4) sections causing the HVAC inspection effort to be incomplete.
0 ATTACHMENTS PREPARED BY:
NAME Don Cossett DATE:
06/15/87 CONCURRENCE:
CEG-H4 DATE:
ffffff2 APPROVAL:
ECTG PROGRAM MGR.
DATE:
CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CATD is issued for tracking purposes only.
0 ATTACHMENTS PROPOSED BY:
DIRECTOR/MGR:
DATE:
- 12.
CONCURRENCE:
ECTG PROGRAM CEG-H:
MANAGER DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been implemented.
SIGNATURE verified as satisfactorily TITLE DATE 5140T 11.
i
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required:
0 Yes l
No Stop Work Recommended: 0 Yes E No CATD No. SWEC-BLN-25-063
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION:}SKQR 0 NQR SWEC-BLN-25-063 NRC SALP -
Cable Tray Housekeeping:
efforts in the area ~
inadequate.
0 ATTACHMENTS PREPARED BY:
NAME Don Cossett DATE:
06/15/87 CONCURRENCE:
CEG-H DATE:
hr.ALtII.
APPROVAL:
ECTG PROGRAM MGR.
kf An DATE:
bdAL//7 CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process.
This CATD is issued for tracking purposes only.
0 ATTACHMENTS PROPOSED BY:
DIRECTOR/MGR:
DATE:
- 12.
CONCURRENCE:
ECTG PROGRAM CEG-H:
MANAGER DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified implemented.
SIGNATURE TITLE as satisfactorily DATE 5140T
- 1.
- 2.
- 3.
- 5.
6.
- 7.
- 8.
9.
11.
i
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION.
- 1.
- 2.
- 3.
- 5.
6.
- 7.
- 8.
9.
Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required:
0 Yes
)f No Stop Work Recommended:
0 Yes % No CATD No. SWEC-BLN-25-091
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:. BLN Site Director PROBLEM DESCRIPTION: )
QR 0 NQR SWEC-BLN-25-091 NRC SALP -
Inadequate QC Inspections and Drawings:
QC accepted incorrect fittings on tubing installation. Inspection drawings do not clearly reflect inspection boundaries.
PREPARED BY:
NAME Don Cos CONCURRENCE:
CEG-H APPROVAL: ECTG PROGRAM MGR.
CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CATD is issued for tracking purposes only.
0 ATTACHMENTS PROPOSED BY:
DIRECTOR/MGR:
DATE:
- 12.
CONCURRENCE:
ECTG PROGRAM CEG-H:
MANAGER DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been implemented.
SIGNATURE verified as satisfactorily TITLE DATE 11.
5140T i
-mm-,
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CAID)
INITIATION
- 1.
- 2.
- 3.
- 5.
6.
Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required:
0 Yes
,t No Stop Work Recommended: 0 Yes JX No CATD No. SWEC-BLN-25-092
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION: 0 QR 0 NQR SWEC-BLN-25-092 NRC SALP - Corrective actions for construction deficiencies:
Corrective action completions for instrument and control construction deficiencies was not always timely.
- 7.
- 8.
9.
PREPARED BY:
NAME Don Cossett 4d 4
CONCURRENCE:
CEG-H APPROVAL:
ECTG PROGRAM MGR.
O ATTACHMENTS DATE:
06/15/87 DATE:
6/ #0987 DATE:
A/
7 CORRECTIVE ACTION
- 10.
~PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CATD is issued for tracking purposes only.
- 11.
PROPOSED BY:
- 12.
CONCURRENCE:
ECTG PROGRAMI DIRECTOR/MGR:
CEG-H:
MANAGER O ATTACHMENTS DATE:
DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified implemented.
SIGNATURE TITLE as satisfactorily DATE 5140T AWM
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECIG Corrective-Action TrackinK Document (CATD)
INITIATION
- 1.
- 2.
- 3.
S.
- 6.
- 7.
- 8.
9.
Applicable ECTG Repr No.
SECB lO immediate Corrective Action Re, re es
%N
,Stop.Work Recommended: o Yes 9
No CATD No. SWEC-BLN-25-09 4
- 4. INITIATION DATE__06/15/8-7 RESPONSIBLE OGNZAIN BLNSiteDirecto PROBLEMI DESCRIPTION: Z.QR 0 NQR SCBL2O 9
NRC SALP -Fire Damper Installations:
Fire dmper istalltions do not alas conform Ito ea accepted industry standards and practices.
i 1
0DATTA ~
1 APPROVAL:
ECTG PROGRAMI MGR.
CORRECTIVE ACTION 10.
PROPOSED CORRECTIVE ACTION PLAN:
DATE----
n is In GrPss.
This CATDi purposes-onl.
________________DATE:
- 11. -pROOSED BY:
DIRECTOR/MGR:DAE
- 12.
CONCURRENCE:
CEG-H:
DATE:________________
ECTG PROGRAM MANAGER ______________
ICATION ANIJ
- 13.
Approved corrective actions have ben verified as satisfactorily implemented.
SIGNATURE 5140T D A T E TITLE
.. I,-
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes pl No Stop Work Recommended: 0 Yes X. No
-CATD No. SWEC-BLN-25-095
- 4. INITIATION DATE 06/15/87
-RESPONSIBLE ORGANIZATION:. BLN Site Director PROBLEM DESCRIPTION: pQR 0 NQR SWEC-BLN-25-095 NRC SALP - Aux.
BldK. Fire Protection Installation:
The discharge pattern of some of the Auxiliary Building fire sprinkler heads is obstructed by overhead plant equipment.
0 ATTACHMENTS PREPARED BY: NAME Don Cossett d
DATE:
06/15/87 CONCURRENCE:
CEG-H DATE:
6 If/F7 APPROVAL:
ECTG PROGRAM MGR.
47 DATE:
,/l 7
CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CAID is issued for tracking purposes only.
0 ATTACHMENTS PROPOSED BY:
DIRECTOR/MGR:
DATE:
- 12.
CONCURRENCE:
ECTG PROGRAM CEG-H:
MANAGER DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified as implemented.
SIGNATURE TITLE satisfactorily DATE 5140T
, lf.,
- 1.
- 2.
- 3.
- 5.
6.
- 7.
- 8.
9.
11.
i
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes CK No Stop Work Recommended:
0 Yes X No CATD No. SWEC-BLN-25-104
- 4. INITIATION DATE 06/15/87 RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION:lQR 0 NQR SWEC-BLN-25-104 NRC SALP -
Design Control QA Audit Program:
The Design Control QA Audit Program contains deficiencies and is not sufficiently comprehensive.
PREPARED BY:
NAME Don CossettA4-CC&
CONCURRENCE:
CEG-H APPROVAL:
ECTG PROGRAM MGR.
a Z*g o ATTACHMENTS DATE:
06/15/87 DATE:
//
(7 DATE:
7 CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
Corrective action is in process. This CATD is issued for tracking purposes only.
0 ATTACHMENTS PROPOSED BY:
DIRECTOR/MGR:
DATE:
- 12.
CONCURRENCE:
ECTG PROGRAM CEG-H:
MANAGER DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified as satisfactorily implemented.
SIGNATURE TITLE DATE 5140T
..- ~b~'.~.3Fr&t~4 "Va*.
~* ~
~
'>~Vt.
- ~?'
4.
" t
- 1.
- 2.
- 3.
- 5.
6.
- 7.
- 8.
9.
11.
i
ECTG C.3 Attachment A Page 1 of 1 Revision 4 ECTG Corrective Action Tracking Document (CATD)
INITIATION Applicable ECTG Report No.:
SWEC-BLN-100 Immediate Corrective Action Required: 0 Yes
(
Stop Work Recommended:
0 Yes a
No CAID No. SWEC-BLN-25-105
- 4. INITIATION DA RESPONSIBLE ORGANIZATION:
BLN Site Director PROBLEM DESCRIPTION:
(QR O NQR SWEC-BLN-25-105 NRC SALP -
Eauipment Storage and Maintenance:
No TE 06/15/87 There are deficiencies in the storage and maintenance of safety related equipment.
- 7.
- 8.
9.
CORRECTIVE ACTION
- 10.
PROPOSED CORRECTIVE ACTION PLAN:
PREPARED BY: NAME Don Cossett
?11 CONCURRENCE:
CEG-H APPROVAL:
ECTG PROGRAM MGR.
/ffa YZ O ATTACHMENTS DATE:
06/15/87 DATE:
4/7 /
DATE:
Corrective action is in process. This CAID is issued for tracking purposes only.
0 ATTACHMENTS
- 11.
PROPOSED BY:
- 12.
CONCURRENCE:
ECTG PROGRAM DIRECTOR/MGR:
CEG-H:
MANAGER DATE:
DATE:
DATE:
VERIFICATION AND CLOSEOUT
- 13.
Approved corrective actions have been verified as implemented.
SIGNATURE.
satisfactorily TITLE DATE
- 1.
- 2.
- 3.
- 5.
6.
5140T i