Correction Letter for License Amendment No. 282 Regarding Request to Incorporate the Use of Alternative Methodologies for the Development of Reactor Vessel pressure-temperature Limit Curves
ML110460485
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/17/2011
From: Michael Mahoney
Plant Licensing Branch III
To: Allen B
FirstEnergy Nuclear Operating Co
mahoney, m NRR/DORL/LPLIII-2 415-3867
References
TAC ME1127
Download: ML110460485 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 17,2011 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - CORRECTION LETTER FOR LICENSE AMENDMENT NO. 282 REGARDING REQUEST TO INCORPORATE THE USE OF ALTERNATIVE METHODOLOGIES FOR THE DEVELOPMENT OF REACTOR PRESSURE VESSEL PRESSURE TEMPERATURE LIMIT CURVES (TAC NO. ME1127)

Dear Mr. Allen:

The U.S. Nuclear Regulatory Commission (NRC), by letter dated January 28, 2011, issued Amendment No. 282 to Facility Operating License NPF-3 for the Davis-Besse Nuclear Power Station, Unit 1. The amendment consisted of changes to the Technical Specifications (TSs) in response to your application dated April 15, 2009 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML091130228), as supplemented by letters dated December 18, 2009 (ADAMS Accession No. ML093570103), October 8, 2010 (ADAMS Accession No. ML102861221), and March 7,2011 (ADAMS Accession No. ML110690027).

TS page 5.6-3a was inadvertently missing from Amendment No. 282 sent by letter dated January 28, 2011. Enclosed is TS page 5.6-3a.

Sinllt 1.el M. oney, Project.n.ger Plant Licensing Branch Division of Operating actor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosures:

Corrected TS page 5.6-3a cc w/encls: Distribution via Listserv

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 Post Accident Monitoring Report When a report is required by Condition B or F of LCD 3.3.17, "Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.

Davis-Besse 5.6-3a Amendment 282

ML093570103), October 8,2010 (ADAMS Accession No. ML102861221), and March 7, 2011 (ADAMS Accession No. ML110690027).

TS page 5.6-3a was inadvertently missing from Amendment No. 282 sent by letter dated January 28, 2011. Enclosed is TS page 5.6-3a.

Sincerely, IRA!

Michael Mahoney, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosures:

Corrected TS page 5.6-3a cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL3-2 RlF RidsRgn3MailCenter Resource RidsNrrDorlLpl3-2 Resource RidsOgcRp Resource RidsNrrDorlDpr Resource RidsNrrPMDavisBesse Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLASRohrer Resource RidsNrrDciCvib Resource ADAMS Accession No ML110460485 NRR-106 OFFICE DORULPL3-2/PM DORULPL3-2/LA DORULPL3-2/LA DORULPL3-2/PM NAME MMahoney SRohrer RCarlson MMahoney DATE 3/14/11 3/14/11 3/15/11 3/17/11