Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date:
12/3/2010 Written Exam Outline (Date)
Comment Resolution 1 The SRO outlines (ES 401-1 & 3) are missing from the package.
The missing outlines were submitted.
2 3
4 5
Administrative JPM Outline (Date)
Comment Resolution 1 Include a description of the task currently described as step 113 in JPM A2.
A descriptive title will be inserted into the title.
2 Include a title for HVN-STR1B in JPM A2. Also, how many tags involved with this JPM?
A descriptive title will be inserted into the title.
This JPM has 7 tags.
3 4
5 Control Room / In-Plant System JPM Outline (Date)
Comment Resolution 1 What are the control room actions for SRV fuse removal? (JPM C2)
Enough actions are contained within the JPM to make it discriminatory.
2 3
4 5
Simulator Scenario Outline Comments (Date)
Comment Resolution 1
What are the expected operator actions for events 3 and 4. There Additional events will be added to increase the number of I/C events. It was confirmed
OBDI 202 - IOLE Process appear to be none, thus making the scenario short of I/C malfunctions.
Add the initial condtions (power, OOS, etc)
Add the power reduction to the turnover.
What are the expected operator actions for events 3, 4, and 9?
The scenario appears to be short of I/C malfunctions.
What is the expected success path with ATWS, MSIVs closed, loss of feedwater, and high power?
there is a success path for the scenario.
This scenario was modified during validation.
2 This scenario is short of I/C malfunctions requiring operator actions.
Additional events will be added to increase the number of I/C events.
This scenario was modified during validation.
3 This scenario is short of I/C malfunctions.
What are the expected operator actions for events 3 and 4?
What is the success path for a loss of all AC and RCIC (i.e. loss of all injection systems)?.
Additional events will be added to increase the number of I/C events. It was confirmed there is a success path for the scenario.
This scenario was modified during validation.
4 This scenario is short of I/C malfunctions requiring operator actions.
What are the expected actions for Events 4 and 5?
Additional events will be added to increase the number of I/C events.
This scenario was modified during validation.
5 Generic comment - Add titles for alpha-numeric designators.
Noun names will be added to the outlines.