BVY 11-008, Technical Specifications Proposed Change No. 290 Administrative Changes - Supplement 1

From kanterella
(Redirected from ML110390508)
Jump to navigation Jump to search

Technical Specifications Proposed Change No. 290 Administrative Changes - Supplement 1
ML110390508
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/02/2011
From: Michael Colomb
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 11-008
Download: ML110390508 (3)


Text

Entergy Nuclear Operations, Inc.

Vermont Yankee 320 Governor Hunt Rd.

-- Entergy Vernon, VT 05354 Tel 802 257 7711 Michael J. Colomb Site Vice President BVY 11-008 February 2, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Technical Specifications Proposed Change No. 290 Administrative Changes - Supplement 1 Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28

REFERENCE:

1. Letter, Entergy Nuclear Operations to USNRC, 'Technical Specifications Proposed Change No. 290 Administrative Changes,"

BVY 10-017, dated April 13, 2010

Dear Sir or Madam:

In Reference 1, Entergy Nuclear Operations (ENO) proposed an amendment to Operating License DPR-28 for the Vermont Yankee Nuclear Power Station.

During their review, the NRC staff requested that ENO revise the proposed wording to Technical Specification (TS) 3.7.A.8 as follows:

"IfSpecification 3.7.A.1 through 3.7.A.6 are not met, an orderly shutdown shall be initiated and the reactor shall be in a cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />." provides the revised TS page 151 to reflect this change. This change is considered administrative and does not affect the conclusions of the no significant hazards consideration determination provided in Reference 1.

There are no new regulatory commitments made in this letter.

If you have any questions on this transmittal, please contact Mr. Robert Wanczyk at 802-451-3166.

I declare under penalty of perjury that the foregoing is true and correct. Executed on February 2, 2011.

Sincerely MJC/JMDA -oo

BVY 11-008 / Page 2 of 2

Attachment:

1. Retyped Technical Specifications Page 151 cc: Mr. William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James S. Kim, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC 320 Governor Hunt Rd Vernon, Vermont 05354 Ms. Elizabeth Miller Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601

BVY 11-008 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station Proposed Change No. 290 Retyped Technical Specifications Page 151