Notification of NRC Initial Operator Licensing Examination 05000275-11-301 & 05000323-11-301
ML110140339
Person / Time
Site: Diablo Canyon  
(DPR-080, DPR-082)
Issue date: 01/14/2011
From: Mark Haire
Operations Branch IV
To: Conway J
Pacific Gas & Electric Co
References
50-275/11-301, 50-323/11-301
Download: ML110140339 (5)


See also: IR 05000275/2011301

Text

January 14, 2011

John T. Conway

Senior Vice President-Energy &

Supply and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Nuclear Plant

77 Beale Street, Mail Code B32

San Francisco, CA 94105

SUBJECT:

DIABLO CANYON, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL

OPERATOR LICENSING EXAMINATION 05000275/2011301;

05000323/2011301

Dear Mr. Conway,

In a telephone conversation on December 15, 2010, between Messrs. R. Fortier, Exam Support

Leader, and K. Clayton, Chief Examiner, arrangements were made for the administration of

licensing examinations at Diablo Canyon Nuclear Power Plant during the weeks of July 11 and

July 18, 2011.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by April 18, 2011. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 to ES-201 will be due by May 16, 2011.

Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall

approve the outlines, examinations, and tests before they are submitted to the NRC for review

and approval. All materials shall be complete and ready-to-use. We request that any personal,

proprietary, sensitive unclassified, or safeguards information in your response be contained in a

separate enclosure and appropriately marked. Any delay in receiving the required examinations

and reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of May 23, 2011.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402 and to

make the simulation facility available on the dates noted above. In accordance with ES-302,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

J. Conway

- 2 -

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator

and senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not

required to respond to, an information collection unless it displays a currently valid OMB control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agency-wide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Clayton at 817-860-8216 or myself at 817-860-

8159.

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

J. Conway

- 3 -

Dockets: 50-275; 50-323

Licenses: DPR-80; DPR-82

DISTRIBUTION:

Sierra Club Santa Lucia Chapter

ATTN: Andrew Christie

P.O. Box 15755

San Luis Obispo, CA 93406

Jane Swanson

San Luis Obispo

Mothers for Peace

P.O. Box 3608

San Luis Obispo, CA 93403

James Grant, County Administrative Officer

San Luis Obispo County Board of

Supervisors

1055 Monterey Street, Suite D430

San Luis Obispo, CA 93408

Truman Burns\\Robert Kinosian

California Public Utilities Commission

505 Van Ness Ave., Rm. 4102

San Francisco, CA 94102

Jennifer Post, Esq.

Pacific Gas & Electric Co.

77 Beale Street, Room 2496

Mail Code B30A

San Francisco, CA 94120

Gary Butner

Chief, Radiologic Health Branch

California Department of Public Health 3

P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

The City Editor of

The Tribune

3825 South Higuera Street

P.O. Box 112

San Luis Obispo, CA 93406-0112

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 31)

Sacramento, CA 95814

J. Conway

- 4 -

James R. Becker, Site Vice President

Pacific Gas and Electric Company

Diablo Canyon Nuclear Plant

P.O. Box 56, Mail Station 104/6/601

Avila Beach, CA 93424

Jennifer Tang

Field Representative

United States Senator Barbara Boxer

1700 Montgomery Street, Suite 240

San Francisco, CA 94111

Chief, Technological Hazards Branch

FEMA Region IX

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

J. Conway

- 5 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Vacant)

Senior Resident Inspector (Michael.Peck@nrc.gov)

Resident Inspector (Tony.Brown@nrc.gov)

Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Project Engineer, DRP/B (Greg.Tutak@nrc.gov)

Project Engineer, DRP/B (Nestor.Makris@nrc.gov)

DC Administrative Assistant (Agnes.Chan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

R:\\

ADAMS ML

ADAMS: No  : Yes

SUNSI Review Complete

Reviewer Initials: KDC

Publicly Available
Non-Sensitive

Non-publicly Available

Sensitive

SOE: DRS/OB

C:DRS/OB

KDC

MSH

/RA/

/RA/

01/06/11

1/13/11

OFFICIAL RECORD COPY