ML110140249

From kanterella
Jump to navigation Jump to search
Diablo Canyon - January 2011 Hearing File Update
ML110140249
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/14/2011
From: Subin L
NRC/OGC
To: Curran D, Repka D, Zamek J
Harmon, Curran, Harmon, Curran, Spielberg & Eisenberg, LLP, San Luis Obispo Mothers for Peace, Winston & Strawn, LLP
Subin, Lloyd B., 415-1988
References
50-275-LR, 50-323-LR
Download: ML110140249 (6)


Text

January 14, 2011 David A Repka, Diane Curran, Tyson Smith, Esq. Harmon, Curran, Carlos Sisco 1726 M NW Winston & Strawn LLP 20036 101 California Street San 94111-5802 Jill San Luis Obispo Mothers for Peace 1123 Road Arroyo Grande, CA 93420 In the Matter of Pacific Gas and Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Dear Parties:

Pursuant to Licensing Board's Memorandum and Order dated September 15, 2010, the Staff is providing an index identifying file and mandatory in accordance with 10 §§ 2.1 and purposes of producing the mandatory disclosures and hearing file, and considering document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff. The index contains the ADAMS accession number, date, and title each item so as to the item retrievable from website,

.::.::.=C.!..!..:..!c..:..:...:::.=..::., using the ADAMS function in accordance with 10 R. § 2.1203. Also is the Affidavit Andrew L, as by 10 C.F.R. § 2.336(c).

Respectfully submitted, Lloyd B. Subin Counsel for the NRC Staff

Hearing File Index 2: Affidavit of Andrew L Stuyvenberg

-2

1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures File Index Update - January 14, 2011 ADAMS Accession Nos.

ID No. No.

04-0001 ML110120578 04-0002 ML103480697 LR Phone Call with NRC 04-0003 ML103480705 LR Clarification on D-RAI B2.1.17-2 04 MLl03480772 Leaching).

2010/12/08 Diablo LR . Updated: Discuss Buried Ma p ML103480784 Water Piping.

04-0006 MLl03480793 2010/12/08 Diablo LR Underground Cable.

LR - U  : Discuss Buried Water 04-0007 MLl03480802 NRC Phone Call to Discus 04-0008 MLl03480807 04-0009 MLl03480810 SAMA Clarification 04-0010 ML103500484 to discuss SAMA MLl03540173 Clarification RAls 2010/12/21 Diablo LR RE: Teleconference to discuss SAMA Clarification RAls (JANUARY 4th, 1:00p EST) 2010/12/30 LR RE: Teleconference to discuss SAMA 13 4th, EST) 04-0014 MLl10030096 4-0015 MLll0030680 04-0016 MLl10120573 1 2

Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index Update - January 14, 2011 ADAMS Accession ADAMS Package Nos.

ID No. No. Document Date (If Applicable) Title 04-0017 ML110110265 1/5/2011 2011/01/05 Diablo Canyon LR - DCPP Buried Makeup Water references 04-0018 ML110070503 1/7/2011 2011/01/07 Diablo Canyon LR - Draft Agenda for ACRS Subcomitte Meeting 04-0019 ML110120574 1/11/2011 2011/01/11 Diablo Canyon LR - Regional Inspection Notifications 04-0020 ML110120577 1/12/2011 2011/01/12 Diablo Canyon LR - FW: GALL Comparison Page 2 of 2

In the Matter of PACI & ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 NRC Staff Letter dated January 14, 11 Attachment 2 of Andrew L. Stuyvenberg

January 14, 2011 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of PACIFIC GAS & ELECTRIC COMPANY Docket Nos . 50-275-LRI 50-323-LR (Diablo Canyon Nuclear Power Plant Units 1 and 2)

AFFIDAVIT OF ANDREW L. STUYVENBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 CFR. § 2.336(b)

I, Andrew L. Stuyvenberg , do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC ") Office of Nuclear Reactor Regulation. I serve as a project manager for the Diablo Canyon Nuclear Power Plant , Units 1 and 2 license renewal application (" LRA"). Among other things , I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed , and that the disclosures are accurate and complete for documents identified by the Staff since the last hearing update until today, January 14, 2011 .
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge , information and belief.

Executed in Rockville , Maryland this 14th day of January , 2011