ML110130279

From kanterella
Jump to navigation Jump to search
Comment (6) of Steve Hale on Behalf of Nextera Energy Supports the Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate
ML110130279
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/10/2010
From: Hale S
Nextera Energy
To: Beltz T
NRC/ADM/DC
References
75FR77010 00006
Download: ML110130279 (1)


Text

Mendiola, Doris From: Hale, Steve [Steve.Hale@nexteraenergy.com]

Sent: Friday, December 10, 2010 1:57 PM To: Beltz, Terry Cc: Abbott, Liz; Costedio, James; Flentje, Fritzie; Hanneman, Harv; Abbatiello, Tom

Subject:

Comments on the PBNP EA and FONSI

Terry, NextEra comments on the Point Beach Nuclear Plant (PBNP), Units 1 and 2 - Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate (TAC Nos. ME1044 and ME1045) are as follows:
1. NextEra is in agreement with the conclusions of this report, specifically Tables 1 and 2 and the draft finding of no significant impact.
2. NextEra would like to suggest that the content of Enclosures 1 and 2 of NextEra letter number NRC 2010-0039 dated May 13, 2010 be considered in this report. Specifically:
1. Page 4 and 9, discussion is based on no expansion of parking lots, equipment lay-down areas, etc. The supplemental environmental report in Appendix D of Attachment 5 to LAR 261 was revised by Enclosure 2 of the above letter.
2. Page 5 and 11 - The fall 2011 modifications will need an approximate 888 additional truck deliveries per Enclosure 1 of the above letter versus the 774 additional truck deliveries indicated.

Note, consideration of the above comments does not change the conclusion of the finding of no significant impact.

Thanks Steve /69-26) &~YZ 776*2/'?9q mT C) 1'7 rn C) 14)527 ~50 1.