Text
l/)
w Cl z <<
- r::
u o z <<
l/)
- )
f-<<
f-l/)
z o l/)
W D:::
Cl Z
LL D:::
W >
D::: o LL W
---.J m
l/)
z o CL l/)
W D:::
D:::
W l/)
- )
PSEG Internal Use Only Page 1 of 1 PSEG NUCLEAR L,lL.C.
HOPE CREEK GENERATING STATION HC.OP-ST.SE-0005(Q) ~ R~v. 9 SRM CHANNEL COUNT RATE SURVEILLANCE USE CATEGORY: I A.
Biennial Revic-w performed Yes No N/A
./
B. Change Package(s) and Affected Document Number(s) incorpoJrated into this revision.
CPNo.
CPRev.No.
AD No.
AD Rev. No.
or None
./
C. OTSC(s) incorporated into this revision:
OTSC No(s) 8A or None REVISION
SUMMARY
- 1.
Based on changes made to NC.NA-AP.ZZ-0002(Q), alB ['eferences to the "Operations Superintendent (OS)", have been changed to "Shift Ma.lItager (SM)". This change is editorial in nature, based on the guidance in NC.NA-AP.ZZ-OOOl(Q).
- 2.
Based on the request made under orders 80059105 and 8101066903, prerequisite 2.4 has been re-worded to clarify that the plant may also be in Mode 2~ to perform this surveillance. This change is editorial in nature, based on the guidance in NC.NA~AP,ZZ-OOOl(Q).
IMPLEMENTATION REQUIREMENTS Effective date
~ /; z../ of.
i None.
APPROVED: ____ ~~~~~~~~
__ ~------
Date
UI w
l')
z <<
- r::
u o z <<
UI f-<<
f-UI z o UI W
0::::
l')
Z LL-0::::
W >
0:::: o LL-W
---.J m
UI Z o CL UI W
0::::
0::::
W UI PSEG Internal Use Only HC.OP-ST.SE-0005(Q)
Section 1.0 2.0 3.0 4.0 S.O 6.0 7.0 SRM CHANNEL COUNT RATE SURVEILLANCE TABLE OF CONTENTS Title Page PURP"OSE.. II ******** tlll ****,.................. ~.. ~".....,.,' "'", ***,t *** " ********, "., ******* " ******* 1.,.".t ******,~ ""f" 2
PREREQUISITES....................................................................................................
2 PRECAUTIONS & LIMITATIONS........................................................................
3 EQUIPMENT REQUIRED......................................................................................
3 PROCEDURE...........................................................................................................
4 RECORDS................................................................................................................
4 REFERENCES..........................................................................................................
4 ATTACHMENTS Hope Creek SMiCRS Data and Signature Sheet..........................................................
5 Control Room Data Sheet........................................................................
8 Page 1 of8 Rev. 9
Ul w
C)
Z
<.(
- r:
u o z
<.(
Ul
~
f--
<.(
f--
Ul z o Ul W
Do::
C)
Z u....
Do::
W >
Do:: o u....
W
---1 m
Ul Z o 0....
Ul W
Do::
Do::
W Ul
~
PSEG Internal Use Only HC.OP-ST.SE..o005(Q)
SRM CHANNEL FUNCTIONAL TEST - MONTHLY 1.0 PURPOSE The purpose of this procedure is to verify SRM channel count rates as required by Technical Specifications 4.9.2.c.1, 4.9.2.c.2, 4.9.2.c.3 and 4.3.7.6.c.
2.0 PREREQllSITES 2.1 Permission to perform this test has been obtained from the SM/eRS as indicated by the completion of Attachment 1, Section 1.0.
2.2 All personnel performing any steps in this procedure should complete, Section 3.0 prior to performing any part of this procedure.
2.3 The NCO has been informed that the following test is to be performed and the following alarms, indications and functions will be observed:
2.3.1 Alarms None 2.3.2 Indications As listed on Attachment 2.
2.3.3 Functions None 2.4 Plant is in operating condition 2,3,4 or 5.
2.5 No other testing or maintenance is in progress that will adversely affect the performance of this test.
2.6 SRM is fully inserted.
Hope Creek Page 2 of8 Rev. 9
(f) w C) z
<C
- r::
u o z
<C (f)
~
I--
<C I--
(f) z o (f)
W 0:::
C)
Z LL 0:::
W >
0:::
o LL W
--1 CO (f)
Z o D-(f)
W 0:::
0:::
W (f)
~
PSEG Internal Use Only HC.OP-ST.SE-0005(Q) 3.0 PRECAUTIONS AND LIMITATIONS 4.0 3.1 Precautions 3.1.1 IF at any time during the perfonnance of this test a step cannot be completed OR is observed to be unsatisfactory, immediately NOTIFY the NCO and the SM/eRS. [CD-927E]
3.1.2 Channel count rate must be at least 3 CPS prior to control rod withdrawal. __
3.2 Limitations 3.2.1 All steps of this procedure are to be completed in sequence unless otherwise specified.
3.2.2 The following exceptions to SRM count rate may be taken in Operational Condition 5.
NOTE 3.2.2.A and 3.2.2.B The requirement to verify the SRM count rate is at least 3 cps prior to and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS, and at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is not required during these conditions.
A.
During a SPIRAL UNLOAD, the count rate may drop below 3 cps when the number of assemblies remaining in the core drops to sixteen or less.
B.
During a SPIRAL RELOAD, up to four fuel assemblies may be loaded in the four bundle locations immediately surrounding each of the four SRMs prior to obtaining 3 cps. Until these assemblies have been loaded, the 3 cps count rate is not required.
3.2.3 ENSURE compliance with Technical Specification 3.9.2 while performing this surveillance.
EQUIPMENT REQUIRED None Hope Creek Page 3 of8 Rev. 9
(f) w
(')
z <<
I U
o Z <<
(f)
- l f-<<
f-(f) z o (f)
W 0::::
(')
Z l..J....
0::::
W >
0:::: o l..J....
W
--1 m
(f) z o D-(f)
W 0::::
0::::
W (f)
5.2 ENSURE that all prerequisites have been satisfied lAW Section 2.0.
5.3 ENSURE Attachment 1, Section 1.0 of the SM/CRS Data and Signature Sheet has been completed AND Regular Surveillance OR Retest is indicated.
5.4 ENTER SRM channel readings for conditions WITH SRM detector fully inserted to normal detector position on Attachment 2 AND INITIAL.
5.5 LOG test end time in the Control Room log(s).
5.6 SUBMIT this procedure to the 8M/CRS for review AND completion of Attachments I.
6.0 RECORDS 6.1 RETAIN the following lAW NC.NA-AP.ZZ-OOll(Q); Records Management Program:
7.0 REFERENCES Procedure cover page - 8M/CRS Data and Signature Sheet - Control Room Data 8heet 7.1 TE-8U.KE-OOI(Q),
Fuel Loading 7.2 Commitment Document CD-927E NRC INFO 87-25 Hope Creek Page 4 of8 Rev. 9
(f) w
(:l z
<l
- r:
u o z
<l (f)
=:)
f-
<l f-(f) z o (f)
W 0:::
(:l Z
l.J....
0:::
W >
0::: o l.J....
W
-1 m
(f) z o 0....
(f)
W 0:::
0:::
W (f)
=:)
PSEG Internal Use Only HC.OP~ST
.SE~0005(Q)
ATTACHMENT 1 Page 1 of3 SM/eRS DATA AND SIGNATURE SHEET SRM CHANNEL COUNT RATE SURVEILLANCE 1.0 PRETEST INFORMATION 1.1 Reason for the Test 1.1.1 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to core alterations INITIALS 1.1.2 Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during core alterations INITIALS 1.1.3 Regular 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> surveillance INITIALS 1.1.4 Satisfy Tech Spec requirement 4.3.7.6.c INITIALS 1.1.5 IF not performing the complete test, THEN LIST subsections to be performed.
SUBSECTIONS 1.2 Plant Conditions 1.2.1 Operational Condition 1.3 Permission to Perform the Test 1.3.1 This procedure does not require independent verification.
1.3.2 Permission granted to perform this test.
_______________________________ 1 __________ __
SM/eRS DATE~TIME Hope Creek Page 5 ors Rev. 9
r.n w
C) z <<
I U
o Z <<
r.n
- J f-<<
f-r.n z o r.n w
0:::
C)
Z lL.
0:::
W >
0:::
o lL.
W
--I m
r.n z o 0...
r.n W
0:::
0:::
W r.n
ATTACHMENT 1 Page 2 of3 SM/CRS DATA AND SIGNATURE SHEET SRM CHANNEL COUNT RATE SURVEILLANCE 2.0 POST TEST INFORMATION 2.1 The data acquired during the performance of this test has been reviewed for completeness and compliance with Technical Specification 3.9.2,3.3.7.6 and the system is considered:
2.1.1 SATISFACTORY
___________________________ 1 ____________ _
OSMS/CRS 2.1.2 UNSATISFACTORY and IF necessarytbe T.S. ACTION statement has been implemented.
1-------------
SM/CRS DATE-TIME 2.1.3 OrderNo. ____________________________ _
2.1.4 Remarks
Hope Creek Page 6 of8 Rev. 9
UI w
l')
z <<
I u 0 z <<
UI
- J f-<<
f-UI z
0 UI W
D:::
l')
Z LL
. D:::
W >
D:::
0 LL W
---l rn UI z
0 CL UI w
D:::
D:::
W UI
ATTACHMENT 1 Page 3 of3 SM/eRS DATA AND SIGNATURE SHEET SRM CHANNEL COUNT RATE SURVEILLANCE 3.0 PROCEDURE PERFORMER(S) 3.1 I have read and understand the steps of this procedure. (All Departments)
PRINT NAME SIGNATURE INITIALS DATEITIME I
I I
I I
I I
I I
I I
/
/
/
/
I
/
/
I I
/
I
/
I I
I
/
/
/
I I
I
/
/
I Hope Creek Page 7 of8 Rev. 9
(J) w c:> z <<
I U
o Z <<
(J)
=>
f-<<
f-(J) z o (J)
W 0:::
c:>
Z lL...
0:::
W >
0::: o lL...
W
..-J m
(J) z o 0...
(J)
W 0:::
0:::
W (J)
=>
PSEG Internal Use Only HC.OP-ST.SE-0005(Q)
ATTACHMENT 2 Page 1 ofl CONTROL ROOM DATA SHEET SRM CHANNEL COUNT RATE SURVEILLANCE 1.0 TEST INFORMATION 1.1 SRM Channel Count Rate Surveillance STEP NOMENCLATURE REQUIRED ACTUAL SATIUNSAT SRM CHANNEL A lOC635
~3 cps SRM CHANNEL B 10C635
~3 cps 5.1.4 SRM CHANNEL C lOC636
~3 cps SRM CHANNEL D lOC636
~3 cps
>I< Acceptance Cntena - the SATIUNSAT block must be marked SAT. (SEE Precaution 3.1.2 and limitation 3.2.2.)
Hope Creek Page 80f8 PERF Rev. 9