HC.OP-SO.SG-0001(Z) Rev. 6, Seismic Instrumentation System Operation
ML110060158
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 02/03/2004
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
References
LR-N10-0355 HC.OP-SO.SG-0001(Z) Rev 6
Download: ML110060158 (12)


Text

.V)

.w C)

.z

<C

r:

u o z

<C V)

  • ::J I-

<C l-V) z o

.V)

W 0::::

C)

Z

.Lt...

0::::

W >

0:::: o

  • Lt....

W

---l

.m.

V)

  • z o

0....

  • .V)
  • W 0::::

0::::

W V)

J
  • PSEG Internal Use Only PSEG NUCLEAR :L.L.C.

HOPE CREEK GENERATING STATION HC.OP-SO.SG-0001(Z) Rev. 6

-SEISMIC INSTRUMENTATION SYSTEM OPERATION

  • USE CATEGORY: II A.

"Biennial Review penOlmed Yes B. Change Package(s) and Mfected Document Number(s) incorporated into this revision.

CP No.

CP Rev. No.

C. OTSC(s) incorporated into this revision:

  • OTSCNo(s)

REVISION

SUMMARY

AD No.

AD Rev, No.

Page lofl No N/A**.(

or None

. orNone

1.

Order 80066792 - based on this order, the following changes have been incorporated:

Added Attachment*1 a mimic of the Seismic Response Spectrum Annunciator to provide documentation when an alarm illuminates on this panel.

Revised Step 5.:2.3 to indicate on Attachment 1 the lamps that are illuminated..

2.

Added Section 6.0, ReCords - editorial IMPLEMENTATION REQUIREMENTS Effective date 2/3 / +

APPROVED: __

---:-:-~~~~~__:__::_-_:__--

e Creek Operations

. Date

if) w e:>

z

<r:

I u o z

<r:

if)

J f---

<r:

PSEG Internal Use Only HC.OP-SO.SG-OOOl(Z)

SEISMIC INSTRUMENTATION SYSTEM OPERATION TABLE OF CONTENTS Section Title Page 1.0 PURPOSE "...............................................................................................................

2 2.0 PREREQUISITES................................................................,...................................

2 3.0 PRECAUTIONS AND LIMITATIONS...................................................................

2 4.0 EQUIPMENT REQUIRED......................................................................................

3 5.0 PROCEDURE...........................................................................................................

4 5.1 Placing the Seismic Instrumentation System in Service.......... "..............

4 5.2 Responding to a Seismic Event Alarm.....................................................

5 5.3 Removing the Seismic Instnunentation System from Service.................

7 6.0 RECORDS........................... "...................................................................................

8

7.0 REFERENCES

8 ATTACHMENTS Seismic Response Spectrum Annunciator................................................

9 0;

EXHIBITS z o if)

W et::

Ie:>

z lL.

et::

W >

et:: o lL.

w

~

OJ if)

Z o (l.

if)

W et::

et::

W if)

J Exhibit 1 Exhibit 2 Hope Creek OSG-VY-7868 Seismic Switch................................................................

10 OSG-VY -7872 Control Panel...................................................................

11 Page 1 of 11 Rev. 6

Vl w

C)

Z I

U o

'z Vl

l f---<<

f---

Vl z o Vl W

0:::

C)

Z l.L.

02

.. w 0:::

.0 l.L.

W

-I m

.Vl Z o 0...

  • Vl W

0:::

0:::

W Vl

l PSEG Internal Use Only HC.OP-SO.SG-OOOl(Z)

SEISMIC INSTRUMENTATION SYSTEM OPERATION 1.0 PURPOSE This procedure outlines the steps necessary for startup, operation and shutdown of the Seismic Instrumentation System.

2.0 PREREQUISITES 3.0 2.1 Placing the Seismic InstrumentationSystem in Service I&C has identified and loaded a cassette into SMA-3 recorder, AND*has performed a record calibration in accordance with its Departmental procedures.

2.2 Responding to a Seismic Event Alarm None 2.3 Removing the Seismic Instrumentation System from Service None PRECAUTIONS AND LIMITATIONS 3.1 Precautions 3.2 3,1.1 DO NOT handle OR operate any Seismic Monitoring Equipment while a seismic event is in progress as indicated by the Tape Machines running and/or the SMA-3 EVENT ALARM light is illuminated, 3.1.2 Alarms on the Seismic Response Spectrum Annunciator should be reset as soon as possible. NOT resetting the alanns will cause the power supply to fail in a short period of time (approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />).

Limitations All Seismic M9nitoring Equipment operates automatically in response to a seismic event.

Hope Creek Page 2 of 11 Rev. 6

(/)

W l?

Z

<r:

r:

u o z

<r:

.(/)

~

f-

<r:

f-(/)

z o

(/)

'W 0::::

l?

Z l..J....

0::::

W >

W

.-l.

m

(/)

z o D-(/)

W 0::::.

0::::

W

(/)

PSEG Internal :Use Only HC.OP-SO.SG-OOOl(Z).

3.3 Interlocks 3.3.1 The Seismic Trigger is actuated by a seismic event.

WITH a magnitude of 0.01 gs (approximately 4.0 Richter)

OR more. The Seismic Trigger will perform the following:

  • Change the SMA-3 Event Indicator (flag) from BLACK to WHITE.

Tum the Strong Motion Accelerograph Tape Machines ON.

3.3.2 The amber SMA-3 EVENT ALARM light will only be Illuminated IF the 'SMA~3 Tape Machines are running.

. Once actuated by the Seisjnic Trigger, the Tape Machines will continue to run for 10 sec after the seismic event intensity falls below 0.01 gs.

3.3.3 The amber ALARM light on the Seismic Switch Power Supply drawer is: actuated by the Seismic Switch IF the magnitude of the seismic event exceeds 0.1 gs (about 5.S Richter). __

4.0 EQUIPMENT REQUIRED Key #38 from Work Control Hope Creek Page 3 of 11 Rev. 6

~--------------~------------------------------------------------............

  • Vl W o Z

<t

r::

U

.0

.Z

<t Vl f-

<t f-

. Vl z o

  • Vl
  • W

.0:::

  • 0 Z

LL

. 0:::

W >

0:::

o

-I m

Vl Z o 0.-

Vl W

0:::

.. 0:::

W

  • Vl PSEG Internal Use Onlx HC.OP-SO.SG-0001(Z)

NOTE 5.0 All operations are performed at Local Panel 10C673 (Upper Relay Room) otherwise specified.

CAUTION 5.0 DO NOT handle OR operate any Seismic Monitoring Equipment while a seismic event is in progress as indicated by the Tape Machines running and/or the SMA.. 3 EVENT ALARM light is illuminated.

5.0 PROCEDURE 5.1 Placing the Seismic Instrumentation System in Service 5.1.1 5.1.2 5.1.3 Hope Creek ENSURE all prerequisites of Section 2.1 are satisfied.

PLACE the SMA3) STRONG MOTION ACCELEROGRAPH, (OSG~VY~7872 CONTROL PANEL) in-service by checking the following:

Key Switch is in OPERATE position AND key is removed.

AC ON lamp is illuminated.

EVENT INDICATOR is black.

PLACE the Seismic Switch Power Supply SP*lITS.3, (OSG-VY-7868 SEISMIC SWITCH) in service as follows:

OBSERVE that the AC ON lamp is illuminated.

Page 40f11 Rev. 6

(/)

w (9

z <<

I u o z <<

(/)

~

f-<<

f-(/)

z o

(/)

W 0:::

'.(9

.Z lL...

0:::

W >

0::: o lL...

'w

---l OJ Vi z o (L

(/)

W 0:::

0:::

W

(/)

PSEG Internal Use Only HC.OP-SO.SG-OOOl(Z) 5.1.4 PLACE the Response Spectrum Annunciator in service as follows (Main Control Room PanellOC650C):

A. : OBSERVE that the AC POWER

  • AND DC POWER lamps are illuminated.
  • (The CHARGE lamp may
  • OR may NOT be illuminated.)

B.. PLACE the TESTIRESET Switch in RESET AND REMOVE the key.

C.

5.2 Responding to a Seismic Event Alarm 5.2.1 PERFORM the following to determine Continued next page Hope Creek IF the seismic event has occurred or is in progress:

A.

IF a seismic event is iuprogress

  • AND is ~ 0.01 gs but < 0.1 gs, THEN OBSERVE the following:
  • The amber SMA-3 EVENT ALARM light should be illuminated.
  • The SMA-3 EVENT INDICATOR should be WHITE.
  • The 5 SMA-3 Tape Machines should be recording.
    • The amber ALARM light on the Seismic Switch Power Supply drawer should be extinguished.

B.,IF a seismic event ~ 0.01 gs

  • AND < 0.1 gs has occurred but is NOT in progress,

, THEN OBSERVE the following:

.* The amber SMA-3 EVENT ALARM light should be extinguished.

The 5 SMA Tape MacWnes should be advanced but NOT running.

  • The SMA-3 EVENT INDICATOR should be WHITE.

Page 5 of 11 Rev. 6

~------------------------------------------------------------------------.. --...

Vl w

C)

Z

<t I

U o

Z

<t Vl

J f---

<t f---

Vl z

  • 0 Vl W

0:::

C)

.z LL

.. CL w

0::: o LL W

---.J m

. Vl z o 0.-

.. Vl W

0:::

0:::

W Vl

J

. PSEG Intemal Use Only HC.OP-SO.SG-0001(Z) 5.2.1 (continued)

C.

IF a seismic event 2: 0.1 gs is in progress

  • OR has occurred,

. TIffiN OBSERVE the following;

    • The amber ALARM light on the Seismic Switch Power Supply drawer should be illuminated in addition to the indications described above.

CAUTION 5.2.2 DO NOThandle ORoperate any Seismic Monitoring Equipment while a seismic event is in progress 'as indicated by the Tape Machines running and/or the SMA*3. EVENT ALARM light illuminated.

Hope Creek 5.2.2 PERFORM the following to reset the Seismic Monitoring System:

5.2.3 A

  • REFER TO Step 5.2.l.B AND VERIFY a seismic event is NOT in progress.

B.

RESET the SMA-3 EVENT INDICATOR by momentarily placing the KEY switch in OFF then back to OPERATE.

C.

. VERIFY the EVENT INDICATOR is BLACK.

D.

  • RESET the Seismic Switch ALARNIlight by pressing the SP-l RESET push-button.

E.

VERIFY the amber ALARM light is extinguished.

OBSERVE Response Spectrum Annunciator (Main Control Room Panel10C650C).

INDICATE on Attachment 1 the lamps that are illuminated.

Page 6 of 11 Rev. 6

IJ) w

(')

z <<

r::

u o z <<

IJ)

l I-<<

I-IJ)

'z

'0 IJ) i>

w 0::::

(')

Z LL

,0::::

W >

PSEG Internal Use Only HC.OP*SO.SG--0001(Z) 5.2.4 PERFORM the following to reset the annunciator(s);

A.,Momentarily PLACE the TESTfRESET-OPERATE

, Switch (labeled "TIR OPR") in TEST (TIR).

B. 'PLACE the switch back in OPERATE (OPR).

C.

'REMOVE the key (Main Control Room Panel 10C650C).

5.2.5 REQUEST I&C retrieve the earthquake record in accordance with its Departmental procedure.

5.3 Removing the Seismic Instrumentation System from Sea'Vice 5.3.1 PLACE the Response Spectrum Annunciator TESTIRESET Switch in RESET AND REMOVE the key (Main Control Room PanellOC650C).

5.3.2 PERFORM the following to remove SMP-l~ Magnetic Playback Unit, from service:

A.

  • PLACE the TRANSPORT ON/OFF Switch in OFF.

B.

PLACE the STYLUS DRIVE RUN/CAL/ZERO Switch in ZERO. __

5.3.3 Hope Creek C.

,PLACE the STYLUS DRIVE ON/OFF Switch in OFF.

D.

PLACE the POWER SELECT Switch in OFF.

PLACE the Strong Motion Accelerograph, SMA-3, KEY Switch in OFF AND REMOVE the key.

Page 7 ofll Rev. 6

(J) w C)

.Z I

U o

Z <<

(J)

l f-<<

f-(J) z

,0 (J)

W 0:::

C)

Z u....

0:::

W >

0:::

o u....

W

---.J OJ (J)

Z o 0....

(J)

W 0:::

0:::

W

.. (J).

l PSEG Internal Use Only HC.OP~SO.SG-OOOl(Z) 6.0 RECORDS None

7.0 REFERENCES

7.1 Vendor Manual J707-31-4, Kinemetrics Inc., 6/17/83 7.2 DITS D5.5, Rev. 4 7.3 UFSAR Chapter 3; Section 3.7.4, Original Hope Creek Page 8 of 11 Rev. 6

Vl W

C) z <<

I U

o Z <<

Vl

)

f-<<

f-Vl z o Vl W

0:::

C)

Z l<-

0:::

  • W 0:::

o l<-

W

---.l OJ Vl Z o D--

Vl W

0:::

0:::

W Vl

)

PSEG Internal Use Onll:

HC.OP-SO.SG-OOOl(Z)

Date ATTACHMENT 1 Page 1 of 1 SEISMIC RESPONSE SPECTRUM ANNUNCIATOR SEISMIC RESPONSE SPECTRUM ANNUNCIATOR CONTAINMENT FOUNDATION ACCELERATION A D P s P G R N o

A L C I H M DE S X GC NE E

LD I E MO O,.. 00 0 Iil!!RlZ o ~~ 0 O

1.11 0 Ifl!f!'l<'

O Z.O~ 0 1l1!!R'l<'

O 2.12 0 HER'IZ O 1.17 0 HIiII'IZ O 4.'. 0 HIiR'IZ OH~O O *. 11 0 Hl!!RlZ 0

8.QOO Hl!!RlZ O

1~1 0 HI!!Rl'Z O

12.1 0 HlRlZ O Ita 0 HERTZ O 2U 0 HI!RTZ O 21.4 0 HeRtz O au 0 HERtz NCRTHISOUTH HORIZONTAl. RE8POHSti Rf$PO!Im."IiCll!UM NlHUKC1~T{JR CHARGE NORMAL!. Y ILLUMINATED ADD E P S S X P G G C R NNE

~ L UP L ~

Cit I E H M M 0 o~o O~O O~O O~:z 0 O~O O~O O~O O 1.04 0 HERTZ O~:z 0 O~O O~b 0 O~O O~O O~O O~O O~O

+

DOWN VERTICAL RESPONSE AQ POWER TII\\ @

OPR A D P S P G R N o A L CI H M DE S X GC HE E

L 0 I E MO o~o o ~ 0,.-----..,

o ~ 0 '--__ ---'

OH~ 0 O~:Z 0 OH~ 0 OH~ 0 o.;n~ 0 o H~S:Z 0 O '.00 0 HIRTZ O lo.! 0 HERTZ O U1 0 HI!RTZ.

O 11.0 0 HERTZ OH~:ZO O 2M 0 HIiIITZ O n**o HIRTZ EAST/WEST HORIZONTAL RESPONSE DC POWER Time:

e COtA~u.,. ~.U-U~AiM @

NORMALLY ILLUMINATED Performer WHEN completed, FORWARD attachment to responsible System Engineer.

Hope Creek Page 9 of 11 Rev. 6

(/)

W o

'z

r::

u o z <<

(/)

=>

f-<<

f-(/)

z o

,i:Q w

0:::

o

'Z LL 0:::

, W 0::: o LL PSEG Internal Use Only Location:

Hope Creek Aux Bld'g Elevation 163' Upper Relay Room BATtERY\\lOLTAGE EXHmIT1 OSG-VY-7868 SEISMIC SWITCH SEISMIC SWITCH POWER SUPPL Y MODEL SP*l SERIAL. No, 206 ACON ALARM o

SATT TE3T 03G..IJ'(* 78S8 SEISMIC SYSTEM RB BASEMAT RM4101 SEISMIC SWITCH EVENT ALARM L.IGHT Actuated by the Seismic Switch at O.lg.

RemaIns on until manually reset.

Page 10 of 11 HC.OP-SO.SG-0001(Z) o RESET Rev. 6

VJ w

c..9

  • z

<C

r:
  • u o z

<C VJ

J f-

.<C f-VJ z o VJ W'

0:::

c..9 Z

u...

0:::

W >

0:::.

o*

u...

. W

---1 CD VJ Z o 0....

VJ W

0:::

. 0:::

W VJ

J.

PSEG "Internal-Use -Dnly HC.OP*SO.SG-OOOl(Z)

EXHmIT2 OSG-VY~7872 CONTROL pANEL

. Location:

AuxBld'g Elevation 163' Upper Relay RQom SEiISMIC TRlGGEiR EVENT ALARM LIGHT SEISMIC TRIGGER eveNT INDICATOR FLAG STRONG MOTION ACCELEROGRAPH.

EVENT ALAIlM o

BATTERYYOLTAOB

+8"TT

+12YDC &

  • 1:IVDC 0

0

-BATT TEST A ground acceleration greater than O.Olg will cause the trigger contacts to close. Closure of these contacts will accomplish the following:

Start all Time~History Accelerographs.

Actuate the amber Event Alarm light on the SMA-3 Control Panel Cause the flag type Event Indicator to change from black to white.

MODEL SMA-3 SERIAL No. 206 OSQ,VY* 7872 CONTROL PANEL EVENT' a INDICATOR O

IIl!IIiMlC TRIGGER TEST OPl!RfoTE

~

OFP TEST CA~IBRATI!

NATURfoL FREQUENCY When ground acceleration subsides and falls below 0.01g, *the trigger contacts*open causing the following to occur after a 10 sec. time delay:

Time-History Accelerographs to shut off.

The Event Alarm light to extinguish.

NOTE - The Event Indicator remains white until manually reset.

  • Hope Creek Page 11 of 11 Rev. 6