1 PilgrimRenewal NPEmails From:
Regner, Lisa Sent:
Wednesday, January 05, 2011 12:58 PM To:
Mogolesko, Fred Cc:
Joe Lynch; Regner, Lisa; PilgrimRenewal NPEmails
Subject:
DRAFT Telecon Summary 12/6/2010 - Buried Piping and Tanks Attachments:
telecon summary 12 6 2010 SBP.doc
- Fred, Attached is the draft teleconference summary from December 6, 2010. Please review before Friday and provide comments, as necessary.
Thank you, Lisa Lisa M Regner, Senior Project Manager Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.Gov Office: O 8 E-6 Mail Stop: O 11 F-1 (301) 415-1906
Hearing Identifier:
PilgrimRenewalNonPublic_EX Email Number:
426 Mail Envelope Properties (28C67094311E124FBAF1AA3E42B88191201675127C)
Subject:
DRAFT Telecon Summary 12/6/2010 - Buried Piping and Tanks Sent Date:
1/5/2011 12:57:45 PM Received Date:
1/5/2011 12:57:45 PM From:
Regner, Lisa Created By:
Lisa.Regner@nrc.gov Recipients:
"Joe Lynch" <jlynch4@entergy.com>
Tracking Status: None "Regner, Lisa" <Lisa.Regner@nrc.gov>
Tracking Status: None "PilgrimRenewal NPEmails" <PilgrimRenewal.NPEmails@nrc.gov>
Tracking Status: None "Mogolesko, Fred" <fmogole@entergy.com>
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 388 1/5/2011 12:57:45 PM telecon summary 12 6 2010 SBP.doc 63994 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
LICENSEE:
Entergy Nuclear Operations, Inc.
FACILITY:
Pilgrim Nuclear Power Station
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 6, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC NO. MC9669)
The U.S. Nuclear Regulatory Commission (the staff) and representatives of Entergy Nuclear Operations, Inc. (the applicant) held a telephone conference call on December 6, 2010, to discuss and clarify the staffs draft request for additional information (RAI) concerning the Pilgrim Nuclear Power Station (Pilgrim) license renewal application. The draft RAI was associated with a review of NUREG-1891, Safety Evaluation Report Related to the License Renewal of Pilgrim Nuclear Power Station issued on June 28, 2007 and supplemented on September 28, 2007.
The staff has identified in the enclosure, areas where additional information is needed. The telephone conference call was useful in clarifying the intent of the staffs draft RAI.
provides a listing of the participants and Enclosure 2 includes the draft RAI discussed with the applicant, including a brief description on the status of the item.
The applicant had an opportunity to comment on this summary.
Lisa M. Regner, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-293
Enclosures:
As stated cc w/encls: via list serv
ML OFFICE LA:RPOB:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME LRegner DWrona LRegner (Signature)
DATE 1/ /11 1/ /11 1/ /11 1/ /11
Memorandum to Entergy Nuclear Operations, Inc. from L. Regner dated January XX, 2011
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 6, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE ANNUAL UPDATE ASSOCIATED WITH THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail L. Regner S. Uttal, OGC B. Harris, OGC A. Jones, OGC S. Schneider, RI D. Jackson, RI R. Conte, RI
ENCLOSURE 1 TELEPHONE CONFERENCE CALL PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 6, 2010 PARTICIPANTS AFFILIATIONS Lisa Regner U.S. Nuclear Regulatory Commission (NRC)
William Holston NRC David Pelton NRC Joe Lynch Entergy Nuclear Operations, Inc. (Entergy)
Fred Mogolesko Entergy Dave Heard Entergy Paul Smith Entergy
ENCLOSURE 2 DRAFT REQUESTS FOR ADDITIONAL INFORMATION (RAI)
PILGRIM NUCLEAR POWER STATION (PNPS)
LICENSE RENEWAL APPLICATION (LRA)
DECEMBER 6, 2010 The U.S. Nuclear Regulatory Commission (the staff) and representatives of Entergy Nuclear Operations, Inc. (the applicant) held a telephone conference call on December 6, 2010, to discuss and clarify the following draft request for additional information (RAI) concerning the Pilgrim Nuclear Power Station, license renewal application (LRA).
DRAFT RAI B.1.2 Buried Piping and Tanks
Background:
The license renewal application (LRA) states that Aging Management Program (AMP) B.1.2, Buried Piping and Tanks Inspection Program, is a new program with one exception and no enhancements and is consistent with the program elements in GALL AMP XI.M34. This AMP addresses buried piping, (i.e., piping in direct contact with soil). The LRA also states that AMP B.1.30, System Walkdown Program (consistent with GALL AMP XI.M36, External Surfaces Monitoring Program),is an existing program with no exceptions or enhancements. This AMP is also credited for managing the aging of the external surfaces of piping exposed to air. Since issuance of the Safety Evaluation Report, NUREG-1891, Supplement 1, Safety Evaluation Report Related to the License Renewal of Pilgrim Nuclear Power Station, September 2007, there have been a number of recent industry events involving leakage from buried and underground piping and tanks.
Issue:
In light of this recent industry operating experience, the staff is concerned about the continued susceptibility to failure of buried and/or underground piping that are within the scope of 10 CFR 54.4 and subject to aging management for license renewal. Following review of the AMPs cited above and the associated aging management review items, the staff is not clear: (1) if the components addressed by these AMPs clearly include both buried and underground piping (piping which is below grade and contained in a vault or other structure where it is exposed to air and where access is limited); and (2) whether such programs are being updated to incorporate lessons learned from these recent events as well as any operating experience from the applicants history.
Request:
- 1. Provide a list and brief summary of any leaks or adverse conditions discovered during inspections (e.g., coating damage that directly exposes the piping or tank to the environment, presence of any coarse material in backfill within 6 inches of the pipe or tank, unexpected corrosion or damage to piping walls or component pressure boundaries) which have occurred in buried or underground piping or tanks at the station in the past five years that were entered in your corrective action program but are not included in your LRA. Describe how your current AMPs or proposed changes to the AMPs address these issues.
- 2. Provide a discussion of how the AMPs used in managing the aging of buried, underground, and limited access piping and tanks within the scope of license renewal
will address recent industry operating experience as well as any operating experience from the applicants history.