Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 02 Figure 2.5-231
ML110040714
Person / Time
Site: Bellefonte  
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040714 (1)


Text

1000 800 600 400 200 0

-200

-400

-600

-800

-1000 ELEVATION (feet) 1000 800 600 400 200 0

-200

-400

-600

-800

-1000 ELEVATION (feet) 0 200 ft 200 ft No vertical exaggeration NORTHWEST SOUTHEAST RIVER RIDGE Reactor Unit #3 Reactor Unit #4 Town Creek Embayment Guntersville Reservoir Osr Osr Osr

?

Onv T3 bentonite 14° 14°-17° 20° 12° 11° 8° 6° Os Srm OCk OsrS A'

A

?

See Subsection 2.5.1.2.3.2 for unit descriptions.

See Figure 2.5-230 for cross section location.

Geologic Cross-Section A-A' Rev 0 Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR FIGURE 2.5-231 BLN COL 2.5-1