ML110040700
Jump to navigation
Jump to search
| ML110040700 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 12/22/2010 |
| From: | Arent G Tennessee Valley Authority |
| To: | Document Control Desk, Office of New Reactors |
| Spink T | |
| References | |
| BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1 | |
| Download: ML110040700 (1) | |
Text
0 100 mi 0
100 km (Note: Locations of cross-sections are shown in Figure 2.5-216)
Structural Cross-sections, Appalachian Thrust Belt, Alabama Rev 0 Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR FIGURE 2.5-217 BLN COL 2.5-1 (Reference 225)