ML110040683

From kanterella
Jump to navigation Jump to search
Bellefonte Units 3 & 4 Cola (Final Safety Analysis Report), Rev. 3 - FSAR Chapter 02 Figure 2.5-201
ML110040683
Person / Time
Site: Bellefonte  
Issue date: 12/22/2010
From: Arent G
Tennessee Valley Authority
To:
Document Control Desk, Office of New Reactors
Spink T
References
BELLEFONTE.P02.NP, BELLEFONTE.P02.NP.3, TENNVALLEY, TENNVALLEY.SUBMISSION.6, +reviewedmmc1
Download: ML110040683 (1)


Text

Original Facilities Units 3 and 4 Facilities Explanation Areas Discussed in Text CCW Pipelines Property Boundary 0

0.6 miles 0

1 km Unit 3 Unit 4 Units 3 and 4 Power Block Construction Zone Intake Structure Intake Channel Units 1 and 2 Power Block Southern Site River Ridge Barge Dock Cooling Towers Jackson County Hwy 558 Gunt ersvi lle R eser voir

/ T enn ess ee Ri ve r

Town Cre ek E mba yme nt 650 650 600 600 650 700 700 700 750 800 750 800 BLN COL 2.5-1 Rev 0 Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR Site Topography and Location FIGURE 2.5-201